TenderDekho Logo
GEM

GAIL India Limited Goods & Services Tender Gautam Buddha Nagar Uttar Pradesh 2026 EMD ₹1,062,000 GEM Portal

Bid Publish Date

24-Apr-2026, 5:32 pm

Bid End Date

04-Jun-2026, 2:00 pm

EMD

₹10,62,000

Generate Docs

Progress

Issue24-Apr-2026, 5:32 pm
Corrigendum25-May-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

196

Category

SUPPLY FOR MR ITEM No. 1.0001 INCLUDING GST

Bid Type

Two Packet Bid

Key Highlights

  • GAIL India Limited tender via GEM portal for 196-item BOQ in UP
  • EMD amount specified: ₹1,062,000; submission via GEM portal
  • Portal-uploaded specification documents govern evaluation over GCC/GTC
  • Delivery period, warranty, and CPBG/EPBG values to be taken from portal attachments
  • GST registration, PAN, and financial/experience documentation required per portal terms

Categories 1

Tender Overview

GAIL India Limited invites bids via the GEM portal for a broad procurement envelope in GAUTAM BUDDHA Nagar, Uttar Pradesh (201301). The tender references a large-scale acquisition with an EMD of ₹1,062,000 and a BOQ comprising 196 items, indicating a substantial, multi-line procurement. The absence of product-specific specifications in the data requires bidders to rely on GEM portal attachments and GCC/GTC terms for scope, delivery logistics, and compliance. Key differentiators include portal-only submission, and alignment with “specifications uploaded on GEM portal” precedence. This is a centralized government procurement exercise targeting a diverse supplier base familiar with public sector tendering. Unique aspects include the explicit priority given to GEM-submitted documents and potential pre-qualification criteria outlined in the accompanying specification documents.

  • Organization: GAIL India Limited
  • Location: GAUTAM BUDDHA NAGAR, UP
  • Estimated Value: Not disclosed; EMD: ₹1,062,000
  • BOQ Items: 196 total; individual item details not visible in available data
  • Submission: Through GEM portal only; portal documents govern evaluation
  • Context: Buyer-specific terms override GEM GCC/GTC if contradictions arise; ATC clauses emphasize portal-uploaded docs

Technical Specifications & Requirements

  • No product specifications provided in the visible data; bidders must consult GEM portal attachments for exact item-wise scope
  • EMD amount clearly stated: ₹1,062,000; ensure payment mode and CPBG/EPBG values as per GEM terms
  • BOQ indicates 196 items, suggesting a wide range of goods/services; confirm item-wise quantities and delivery requirements via portal
  • Terms underline precedence of the bidding document uploaded on GEM portal over GCC/GTC; ensure compliance with buyer-added ATC conditions
  • Delivery timeframe, warranty, and post-sale support details are not disclosed here and must be extracted from portal documents
  • Compliance with standard GEM procurement processes, including GST/PAN documentation and financial qualification, is implied by portal terms

Terms, Conditions & Eligibility

  • EMD: ₹1,062,000; must be submitted as per GEM portal guidelines and in acceptable form
  • Bids submitted only through the GEM portal; external submissions are not considered
  • Terms specify that any inconsistencies between the enquiry documents and GEM GCC/GTC are resolved in favor of the enquiry documents
  • Documentation and eligibility criteria will be detailed in portal attachments; bidders should prepare GST registration, PAN, experience certificates, and financial statements
  • The tender emphasizes reliance on portal-uploaded specification documents for evaluation; ensure all attachments are complete and compliant
  • No explicit delivery timeline or warranty terms visible; extract from the GEM portal and bidder ATCs for final commitments

Key Specifications

  • BOQ-wide procurement: 196 items

  • EMD: ₹1,062,000

  • Submission through GEM portal only

  • GEM portal precedence over GCC/GTC

  • Portal attachments govern scope, delivery, and compliance

Terms & Conditions

  • Bids must be submitted on the GEM portal and adhere to portal attachments

  • EMD of ₹1,062,000; materials must meet portal-specified forms

  • GCC/GTC terms are superseded by buyer-added terms on the portal

Important Clauses

Payment Terms

Payment terms to be as per GEM portal terms and buyer ATC; confirm milestone-based or completion payment in portal attachments

Delivery Schedule

Delivery period to be specified in portal attachments; ensure alignment with 196-item BOQ scope

Penalties/Liquidated Damages

LDs, if any, to be stated in portal specification documents; verify penalties for late delivery or non-compliance per GEM terms

Bidder Eligibility

  • Bidders must submit through the GEM portal

  • GST registration and PAN validation required

  • Experience certificates aligned with the 196-item BOQ scope

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9256764.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SUPPLY (INCLUDING GST) FOR MR SL NO. 1,FREIGHT (INCLUDING GST) FOR MR SL NO. 1,SUPPLY (INCLUDING GS

Gail India Limited

AURAIYA, UTTAR PRADESH

Posted: 12 June 2025
Closed: 2 July 2025
GEM

Total Supply Price for MR Item No. : 1.0001 including Freight, GST (Item Code: 370-PVRV-370601) : B

N/A

DAKSHINA KANNADA, KARNATAKA

Posted: 18 September 2025
Closed: 13 November 2025
GEM

SUPPLY OF MR ITEM SR NO. 1 INCLUDING FREIGHT AND GST,SUPPLY OF MR ITEM SR NO. 2 INCLUDING FREIGHT A

Indian Oil Corporation Limited

VADODARA, GUJARAT

Posted: 24 July 2025
Closed: 8 August 2025
GEM

SUPPLY FOR MR ITEM S. NO. 01.001

Engineers India Limited

SURAT, GUJARAT

Posted: 17 April 2025
Closed: 9 May 2025
GEM

Supply for MR Item S.No.1.0001,Supply for MR Item S.No.1.0002,Supply for MR Item S.No.1.0003,Supply

Engineers India Limited

SURAT, GUJARAT

Posted: 3 April 2025
Closed: 2 June 2025
GEM

Bill of Quantities (BOQ) 196 Items Sign in for GEM prices

#1

SUPPLY FOR MR ITEM No. 1.0001 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0001 INCLUDING GST

1 nos Delivery: 210 days
#2

SUPPLY FOR MR ITEM No. 1.0002 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0002 INCLUDING GST

1 nos Delivery: 210 days
#3

SUPPLY FOR MR ITEM No. 1.0003INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0003INCLUDING GST

1 nos Delivery: 210 days
#4

SUPPLY FOR MR ITEM No. 1.0004 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0004 INCLUDING GST

1 nos Delivery: 210 days
#5

SUPPLY FOR MR ITEM No. 1.0005 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0005 INCLUDING GST

1 nos Delivery: 210 days
#6

SUPPLY FOR MR ITEM No. 1.0006 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0006 INCLUDING GST

1 nos Delivery: 210 days
#7

SUPPLY FOR MR ITEM No. 1.0007 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0007 INCLUDING GST

1 nos Delivery: 210 days
#8

SUPPLY FOR MR ITEM No. 1.0008 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0008 INCLUDING GST

1 nos Delivery: 210 days
#9

SUPPLY FOR MR ITEM No. 1.0009 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0009 INCLUDING GST

1 nos Delivery: 210 days
#10

SUPPLY FOR MR ITEM No. 1.0010 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0010 INCLUDING GST

1 nos Delivery: 210 days
#11

SUPPLY FOR MR ITEM No. 1.0011 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0011 INCLUDING GST

1 nos Delivery: 210 days
#12

SUPPLY FOR MR ITEM No. 1.0012 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0012 INCLUDING GST

1 nos Delivery: 210 days
#13

SUPPLY FOR MR ITEM No. 1.0013 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0013 INCLUDING GST

1 nos Delivery: 210 days
#14

SUPPLY FOR MR ITEM No. 1.0014 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0014 INCLUDING GST

1 nos Delivery: 210 days
#15

SUPPLY FOR MR ITEM No. 1.0015 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0015 INCLUDING GST

1 nos Delivery: 210 days
#16

SUPPLY FOR MR ITEM No. 1.0016 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0016 INCLUDING GST

1 nos Delivery: 210 days
#17

SUPPLY FOR MR ITEM No. 1.0017 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0017 INCLUDING GST

1 nos Delivery: 210 days
#18

SUPPLY FOR MR ITEM No. 1.0018 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0018 INCLUDING GST

1 nos Delivery: 210 days
#19

SUPPLY FOR MR ITEM No. 1.0019 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0019 INCLUDING GST

1 nos Delivery: 210 days
#20

SUPPLY FOR MR ITEM No. 1.0020 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0020 INCLUDING GST

1 nos Delivery: 210 days
#21

SUPPLY FOR MR ITEM No. 1.0021 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0021 INCLUDING GST

1 nos Delivery: 210 days
#22

SUPPLY FOR MR ITEM No. 1.0022 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0022 INCLUDING GST

1 nos Delivery: 210 days
#23

SUPPLY FOR MR ITEM No. 1.0023 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0023 INCLUDING GST

1 nos Delivery: 210 days
#24

SUPPLY FOR MR ITEM No. 1.0024 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0024 INCLUDING GST

1 nos Delivery: 210 days
#25

SUPPLY FOR MR ITEM No. 1.0025 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0025 INCLUDING GST

1 nos Delivery: 210 days
#26

SUPPLY FOR MR ITEM No. 1.0026 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0026 INCLUDING GST

1 nos Delivery: 210 days
#27

SUPPLY FOR MR ITEM No. 1.0027 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0027 INCLUDING GST

1 nos Delivery: 210 days
#28

SUPPLY FOR MR ITEM No. 1.0028 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0028 INCLUDING GST

1 nos Delivery: 210 days
#29

SUPPLY FOR MR ITEM No. 1.0029 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0029 INCLUDING GST

1 nos Delivery: 210 days
#30

SUPPLY FOR MR ITEM No. 1.0030 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0030 INCLUDING GST

1 nos Delivery: 210 days
#31

SUPPLY FOR MR ITEM No. 1.0031 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0031 INCLUDING GST

1 nos Delivery: 210 days
#32

SUPPLY FOR MR ITEM No. 1.0032 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0032 INCLUDING GST

1 nos Delivery: 210 days
#33

SUPPLY FOR MR ITEM No. 1.0033 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0033 INCLUDING GST

1 nos Delivery: 210 days
#34

SUPPLY FOR MR ITEM No. 1.0034 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0034 INCLUDING GST

1 nos Delivery: 210 days
#35

SUPPLY FOR MR ITEM No. 1.0035 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0035 INCLUDING GST

1 nos Delivery: 210 days
#36

SUPPLY FOR MR ITEM No. 1.0036 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0036 INCLUDING GST

1 nos Delivery: 210 days
#37

SUPPLY FOR MR ITEM No. 1.0037 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0037 INCLUDING GST

1 nos Delivery: 210 days
#38

SUPPLY FOR MR ITEM No. 1.0038 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0038 INCLUDING GST

1 nos Delivery: 210 days
#39

SUPPLY FOR MR ITEM No. 1.0039 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0039 INCLUDING GST

1 nos Delivery: 210 days
#40

SUPPLY FOR MR ITEM No. 1.0040 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0040 INCLUDING GST

1 nos Delivery: 210 days
#41

SUPPLY FOR MR ITEM No. 1.0041 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0041 INCLUDING GST

1 nos Delivery: 210 days
#42

SUPPLY FOR MR ITEM No. 1.0042 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0042 INCLUDING GST

1 nos Delivery: 210 days
#43

SUPPLY FOR MR ITEM No. 1.0043 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0043 INCLUDING GST

1 nos Delivery: 210 days
#44

SUPPLY FOR MR ITEM No. 1.0044 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0044 INCLUDING GST

1 nos Delivery: 210 days
#45

SUPPLY FOR MR ITEM No. 1.0045 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0045 INCLUDING GST

1 nos Delivery: 210 days
#46

SUPPLY FOR MR ITEM No. 1.0046 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0046 INCLUDING GST

1 nos Delivery: 210 days
#47

SUPPLY FOR MR ITEM No. 1.0047 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0047 INCLUDING GST

1 nos Delivery: 210 days
#48

SUPPLY FOR MR ITEM No. 1.0048 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0048 INCLUDING GST

1 nos Delivery: 210 days
#49

SUPPLY FOR MR ITEM No. 1.0049 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0049 INCLUDING GST

1 nos Delivery: 210 days
#50

SUPPLY FOR MR ITEM No. 1.0050 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0050 INCLUDING GST

1 nos Delivery: 210 days
#51

SUPPLY FOR MR ITEM No. 1.0051 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0051 INCLUDING GST

1 nos Delivery: 210 days
#52

SUPPLY FOR MR ITEM No. 1.0052 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0052 INCLUDING GST

1 nos Delivery: 210 days
#53

SUPPLY FOR MR ITEM No. 1.0053 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0053 INCLUDING GST

1 nos Delivery: 210 days
#54

SUPPLY FOR MR ITEM No. 1.0054 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0054 INCLUDING GST

1 nos Delivery: 210 days
#55

SUPPLY FOR MR ITEM No. 1.0055 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0055 INCLUDING GST

1 nos Delivery: 210 days
#56

SUPPLY FOR MR ITEM No. 1.0056 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0056 INCLUDING GST

1 nos Delivery: 210 days
#57

SUPPLY FOR MR ITEM No. 1.0057 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0057 INCLUDING GST

1 nos Delivery: 210 days
#58

SUPPLY FOR MR ITEM No. 1.0058 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0058 INCLUDING GST

1 nos Delivery: 210 days
#59

SUPPLY FOR MR ITEM No. 1.0059 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0059 INCLUDING GST

1 nos Delivery: 210 days
#60

SUPPLY FOR MR ITEM No. 1.0060 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0060 INCLUDING GST

1 nos Delivery: 210 days
#61

SUPPLY FOR MR ITEM No. 1.0061 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0061 INCLUDING GST

1 nos Delivery: 210 days
#62

SUPPLY FOR MR ITEM No. 1.0062 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0062 INCLUDING GST

1 nos Delivery: 210 days
#63

SUPPLY FOR MR ITEM No. 1.0063 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0063 INCLUDING GST

1 nos Delivery: 210 days
#64

SUPPLY FOR MR ITEM No. 1.0064 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0064 INCLUDING GST

1 nos Delivery: 210 days
#65

SUPPLY FOR MR ITEM No. 1.0065 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0065 INCLUDING GST

1 nos Delivery: 210 days
#66

SUPPLY FOR MR ITEM No. 1.0066 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0066 INCLUDING GST

1 nos Delivery: 210 days
#67

SUPPLY FOR MR ITEM No. 1.0067 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0067 INCLUDING GST

1 nos Delivery: 210 days
#68

SUPPLY FOR MR ITEM No. 1.0068 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0068 INCLUDING GST

1 nos Delivery: 210 days
#69

SUPPLY FOR MR ITEM No. 1.0069 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0069 INCLUDING GST

1 nos Delivery: 210 days
#70

SUPPLY FOR MR ITEM No. 1.0070 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0070 INCLUDING GST

1 nos Delivery: 210 days
#71

SUPPLY FOR MR ITEM No. 1.0071 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0071 INCLUDING GST

1 nos Delivery: 210 days
#72

SUPPLY FOR MR ITEM No. 1.0072 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0072 INCLUDING GST

1 nos Delivery: 210 days
#73

SUPPLY FOR MR ITEM No. 1.0073 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0073 INCLUDING GST

1 nos Delivery: 210 days
#74

SUPPLY FOR MR ITEM No. 1.0074 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0074 INCLUDING GST

1 nos Delivery: 210 days
#75

SUPPLY FOR MR ITEM No. 1.0075 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0075 INCLUDING GST

1 nos Delivery: 210 days
#76

SITE WORK FOR MR ITEM No. 2.0006 INCLUDING GST

SITE WORK FOR MR ITEM No. 2.0006 INCLUDING GST

1 ls Delivery: 210 days
#77

SITE WORK FOR MR ITEM No. 2.0010 INCLUDING GST

SITE WORK FOR MR ITEM No. 2.0010 INCLUDING GST

1 ls Delivery: 210 days
#78

TRANSPORTATION FOR MR ITEM No. 3.0001 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0001 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#79

TRANSPORTATION FOR MR ITEM No. 3.0002 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0002 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#80

TRANSPORTATION FOR MR ITEM No. 3.0003 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0003 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#81

TRANSPORTATION FOR MR ITEM No. 3.0004 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0004 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#82

TRANSPORTATION FOR MR ITEM No. 3.0005 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0005 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#83

TRANSPORTATION FOR MR ITEM No. 3.0006 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0006 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#84

TRANSPORTATION FOR MR ITEM No. 3.0007 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0007 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#85

TRANSPORTATION FOR MR ITEM No. 3.0008 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0008 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#86

TRANSPORTATION FOR MR ITEM No. 3.0009 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0009 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#87

TRANSPORTATION FOR MR ITEM No. 3.0010 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0010 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#88

TRANSPORTATION FOR MR ITEM No. 3.0011 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0011 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#89

TRANSPORTATION FOR MR ITEM No. 3.0012 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0012 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#90

TRANSPORTATION FOR MR ITEM No. 3.0013 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0013 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#91

TRANSPORTATION FOR MR ITEM No. 3.0014 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0014 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#92

TRANSPORTATION FOR MR ITEM No. 3.0015 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0015 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#93

TRANSPORTATION FOR MR ITEM No. 3.0016 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0016 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#94

TRANSPORTATION FOR MR ITEM No. 3.0017 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0017 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#95

TRANSPORTATION FOR MR ITEM No. 3.0018 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0018 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#96

TRANSPORTATION FOR MR ITEM No. 3.0019 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0019 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#97

TRANSPORTATION FOR MR ITEM No. 3.0020 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0020 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#98

TRANSPORTATION FOR MR ITEM No. 3.0021 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0021 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#99

TRANSPORTATION FOR MR ITEM No. 3.0022 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0022 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#100

TRANSPORTATION FOR MR ITEM No. 3.0023 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0023 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#101

TRANSPORTATION FOR MR ITEM No. 3.0024 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0024 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#102

TRANSPORTATION FOR MR ITEM No. 3.0025 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0025 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#103

TRANSPORTATION FOR MR ITEM No. 3.0026 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0026 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#104

TRANSPORTATION FOR MR ITEM No. 3.0027 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0027 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#105

TRANSPORTATION FOR MR ITEM No. 3.0028 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0028 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#106

TRANSPORTATION FOR MR ITEM No. 3.0029 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0029 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#107

TRANSPORTATION FOR MR ITEM No. 3.0030 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0030 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#108

TRANSPORTATION FOR MR ITEM No. 3.0031 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0031 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#109

TRANSPORTATION FOR MR ITEM No. 3.0032 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0032 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#110

TRANSPORTATION FOR MR ITEM No. 3.0033 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0033 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#111

TRANSPORTATION FOR MR ITEM No. 3.0034 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0034 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#112

TRANSPORTATION FOR MR ITEM No. 3.0035 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0035 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#113

TRANSPORTATION FOR MR ITEM No. 3.0036 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0036 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#114

TRANSPORTATION FOR MR ITEM No. 3.0037 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0037 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#115

TRANSPORTATION FOR MR ITEM No. 3.0038 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0038 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#116

TRANSPORTATION FOR MR ITEM No. 3.0039 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0039 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#117

TRANSPORTATION FOR MR ITEM No. 3.0040 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0040 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#118

TRANSPORTATION FOR MR ITEM No. 3.0041 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0041 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#119

TRANSPORTATION FOR MR ITEM No. 3.0042 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0042 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#120

TRANSPORTATION FOR MR ITEM No. 3.0043 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0043 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#121

TRANSPORTATION FOR MR ITEM No. 3.0044 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0044 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#122

TRANSPORTATION FOR MR ITEM No. 3.0045 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0045 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#123

TRANSPORTATION FOR MR ITEM No. 3.0046 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0046 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#124

TRANSPORTATION FOR MR ITEM No. 3.0047 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0047 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#125

TRANSPORTATION FOR MR ITEM No. 3.0048 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0048 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#126

TRANSPORTATION FOR MR ITEM No. 3.0049 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0049 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#127

TRANSPORTATION FOR MR ITEM No. 3.0050 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0050 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#128

TRANSPORTATION FOR MR ITEM No. 3.0051 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0051 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#129

TRANSPORTATION FOR MR ITEM No. 3.0052 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0052 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#130

TRANSPORTATION FOR MR ITEM No. 3.0053 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0053 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#131

TRANSPORTATION FOR MR ITEM No. 3.0054 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0054 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#132

TRANSPORTATION FOR MR ITEM No. 3.0055 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0055 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#133

TRANSPORTATION FOR MR ITEM No. 3.0056 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0056 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#134

TRANSPORTATION FOR MR ITEM No. 3.0057 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0057 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#135

TRANSPORTATION FOR MR ITEM No. 3.0058 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0058 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#136

TRANSPORTATION FOR MR ITEM No. 3.0059 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0059 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#137

TRANSPORTATION FOR MR ITEM No. 3.0060 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0060 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#138

TRANSPORTATION FOR MR ITEM No. 3.0061 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0061 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#139

TRANSPORTATION FOR MR ITEM No. 3.0062 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0062 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#140

TRANSPORTATION FOR MR ITEM No. 3.0063 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0063 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#141

TRANSPORTATION FOR MR ITEM No. 3.0064 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0064 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#142

TRANSPORTATION FOR MR ITEM No. 3.0065 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0065 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#143

TRANSPORTATION FOR MR ITEM No. 3.0066 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0066 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#144

TRANSPORTATION FOR MR ITEM No. 3.0067 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0067 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#145

TRANSPORTATION FOR MR ITEM No. 3.0068 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0068 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#146

TRANSPORTATION FOR MR ITEM No. 3.0069 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0069 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#147

TRANSPORTATION FOR MR ITEM No. 3.0070 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0070 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#148

TRANSPORTATION FOR MR ITEM No. 3.0071 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0071 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#149

TRANSPORTATION FOR MR ITEM No. 3.0072 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0072 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#150

TRANSPORTATION FOR MR ITEM No. 3.0073 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0073 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#151

TRANSPORTATION FOR MR ITEM No. 3.0074 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0074 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#152

TRANSPORTATION FOR MR ITEM No. 3.0075 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0075 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#153

TOTAL MANDATORY SPARE PRICE INCLUDING GST AS PER MR SL. NO. 4.0001

TOTAL MANDATORY SPARE PRICE INCLUDING GST AS PER MR SL. NO. 4.0001

1 ls Delivery: 210 days
#154

Total Supervision charges For Item SL. No. 08.0001 considering 03 manday including GST

Total Supervision charges For Item SL. No. 08.0001 considering 03 manday including GST

1 ls Delivery: 210 days
#155

Total Supervision charges For Item SL. No. 08.0002 considering 03 manday including GST

Total Supervision charges For Item SL. No. 08.0002 considering 03 manday including GST

1 ls Delivery: 210 days
#156

Total Supervision charges For Item SL. No. 08.0003 considering 01 manday including GST

Total Supervision charges For Item SL. No. 08.0003 considering 01 manday including GST

1 ls Delivery: 210 days
#157

Total Supervision charges For Item SL. No. 08.0004 considering 01 manday including GST

Total Supervision charges For Item SL. No. 08.0004 considering 01 manday including GST

1 ls Delivery: 210 days
#158

Total Supervision charges For Item SL. No. 08.0005 considering 01 manday including GST

Total Supervision charges For Item SL. No. 08.0005 considering 01 manday including GST

1 ls Delivery: 210 days
#159

Total Supervision charges For Item SL. No. 08.0006 considering 01 manday including GST

Total Supervision charges For Item SL. No. 08.0006 considering 01 manday including GST

1 ls Delivery: 210 days
#160

Total Supervision charges For Item SL. No. 8.0007 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0007 considering 01 manday including GST

1 ls Delivery: 210 days
#161

Total Supervision charges For Item SL. No. 8.0008 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0008 considering 01 manday including GST

1 ls Delivery: 210 days
#162

Total Supervision charges For Item SL. No. 8.0009 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0009 considering 01 manday including GST

1 ls Delivery: 210 days
#163

Total Supervision charges For Item SL. No. 8.0010 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0010 considering 01 manday including GST

1 ls Delivery: 210 days
#164

Total Supervision charges For Item SL. No. 8.0037 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0037 considering 01 manday including GST

1 ls Delivery: 210 days
#165

Total Supervision charges For Item SL. No. 8.0038 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0038 considering 01 manday including GST

1 ls Delivery: 210 days
#166

Total Supervision charges For Item SL. No. 8.0039 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0039 considering 01 manday including GST

1 ls Delivery: 210 days
#167

Total Supervision charges For Item SL. No. 8.0040 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0040 considering 01 manday including GST

1 ls Delivery: 210 days
#168

Total Supervision charges For Item SL. No. 8.0041 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0041 considering 01 manday including GST

1 ls Delivery: 210 days
#169

Total Supervision charges For Item SL. No. 8.0042 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0042 considering 01 manday including GST

1 ls Delivery: 210 days
#170

Total Supervision charges For Item SL. No. 8.0043 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0043 considering 01 manday including GST

1 ls Delivery: 210 days
#171

Total Supervision charges For Item SL. No. 8.0044 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0044 considering 01 manday including GST

1 ls Delivery: 210 days
#172

Total Supervision charges For Item SL. No. 8.0045 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0045 considering 01 manday including GST

1 ls Delivery: 210 days
#173

Total Supervision charges For Item SL. No. 8.0046 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0046 considering 01 manday including GST

1 ls Delivery: 210 days
#174

Total Supervision charges For Item SL. No. 8.0047 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0047 considering 01 manday including GST

1 ls Delivery: 210 days
#175

Total Supervision charges For Item SL. No. 8.0048 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0048 considering 01 manday including GST

1 ls Delivery: 210 days
#176

Total Supervision charges For Item SL. No. 8.0049 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0049 considering 01 manday including GST

1 ls Delivery: 210 days
#177

Total Supervision charges For Item SL. No. 8.0050 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0050 considering 01 manday including GST

1 ls Delivery: 210 days
#178

Total Supervision charges For Item SL. No. 8.0051 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0051 considering 01 manday including GST

1 ls Delivery: 210 days
#179

Total Supervision charges For Item SL. No. 8.0052 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0052 considering 01 manday including GST

1 ls Delivery: 210 days
#180

Total Supervision charges For Item SL. No. 8.0053 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0053 considering 01 manday including GST

1 ls Delivery: 210 days
#181

Total Supervision charges For Item SL. No. 8.0054 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0054 considering 01 manday including GST

1 ls Delivery: 210 days
#182

Total Supervision charges For Item SL. No. 8.0055 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0055 considering 01 manday including GST

1 ls Delivery: 210 days
#183

Total Supervision charges For Item SL. No. 8.0056 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0056 considering 01 manday including GST

1 ls Delivery: 210 days
#184

Total Supervision charges For Item SL. No. 8.0057 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0057 considering 01 manday including GST

1 ls Delivery: 210 days
#185

Total Supervision charges For Item SL. No. 8.0058 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0058 considering 01 manday including GST

1 ls Delivery: 210 days
#186

Total Supervision charges For Item SL. No. 8.0059 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0059 considering 01 manday including GST

1 ls Delivery: 210 days
#187

Total Supervision charges For Item SL. No. 8.0060 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0060 considering 01 manday including GST

1 ls Delivery: 210 days
#188

Total Supervision charges For Item SL. No. 8.0061 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0061 considering 01 manday including GST

1 ls Delivery: 210 days
#189

Total Supervision charges For Item SL. No. 8.0062 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0062 considering 01 manday including GST

1 ls Delivery: 210 days
#190

Total Supervision charges For Item SL. No. 8.0063 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0063 considering 01 manday including GST

1 ls Delivery: 210 days
#191

Total Supervision charges For Item SL. No. 8.0064 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0064 considering 01 manday including GST

1 ls Delivery: 210 days
#192

Total Supervision charges For Item SL. No. 8.0065 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0065 considering 01 manday including GST

1 ls Delivery: 210 days
#193

Total Supervision charges For Item SL. No. 8.0066 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0066 considering 01 manday including GST

1 ls Delivery: 210 days
#194

Total Supervision charges For Item SL. No. 8.0067 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0067 considering 01 manday including GST

1 ls Delivery: 210 days
#195

Total Training charges at site For Item SL. No.11.0001 considering 10 manday including GST

Total Training charges at site For Item SL. No.11.0001 considering 10 manday including GST

1 ls Delivery: 210 days
#196

Total Training charges at site For Item SL. No.11.0002 considering 10 manday including GST

Total Training charges at site For Item SL. No.11.0002 considering 10 manday including GST

1 ls Delivery: 210 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates matching the scope of the BOQ

4

Financial statements or turnover proof as required by portal terms

5

EMD submission proof as per GEM portal instructions

6

Technical bid documents and OEM authorizations if applicable

7

Any portal-specified documents uploaded with specification attachments

Corrigendum Updates

4 Updates
#1

Update

25-May-2026

Extended Deadline

04-Jun-2026, 2:00 pm

Opening Date

04-Jun-2026, 2:30 pm

#2

Update

20-May-2026

Extended Deadline

25-May-2026, 2:00 pm

Opening Date

25-May-2026, 2:30 pm

#3

Update

13-May-2026
#4

Update

13-May-2026

Extended Deadline

20-May-2026, 2:00 pm

Opening Date

20-May-2026, 2:30 pm

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid in tender in Gautam Buddha Nagar via GEM portal?

Bidders must register on the GEM portal, locate the GAIL India Limited enquiry, and upload all required documents as per portal attachments. Ensure EMD submission of ₹1,062,000, GST/PAN validity, and technical bids aligned with 196-item BOQ. Portal terms govern evaluation and document precedence.

What documents are required for GAIL UP tender submission 2026?

Submit GST certificate, PAN card, experience certificates, financial statements, EMD proof, technical compliance documents, and any OEM authorizations as specified in the GEM portal attachments. Ensure all documents match the BOQ scope of 196 items and are uploaded with the specification documents.

What are the EMD requirements for this GEM tender in UP?

The EMD amount is ₹1,062,000. Deposit must follow GEM portal guidelines, with acceptable instrument forms. Ensure the EMD is valid for the bid validity period and corresponds to the exact tender scope described in the portal attachments.

Which standards or certifications are required for this GAIL procurement?

No explicit standards are listed in the visible data; bidders must verify portal attachments for any required certifications. Expect standard public procurement compliance and potential vendor qualification criteria as per GEM terms.

When is the delivery period for the UP GEM tender 2026?

Delivery timelines are not disclosed in the visible data; bidders should reference the GEM portal specification documents for item-wise delivery schedules and milestones, and align proposals to those portal-stipulated timeframes.

What is the submission process for the GAIL UP 196-item BOQ tender?

Submit exclusively through the GEM portal, ensuring all portal documents, including specification attachments, are uploaded. The evaluation will follow the buyer-added ATC clauses; ensure consistency with the portal attachments to avoid disqualification.

How to verify eligibility criteria for this GAIL UP tender 2026?

Eligibility is determined by portal-specified criteria, including statutory registrations (GST, PAN), experience certificates, and financials. Prepare 196-item BOQ alignment documents and ensure EMD is ready; refer to portal attachments for precise requirements.

What documents are required for online EMD submission in this tender?

Prepare EMD proof as per GEM portal instructions, matching the ₹1,062,000 amount. Include bank-enabled payment confirmation or instrument, ensure validity, and attach with the technical bid and specification documents uploaded on the portal.

Similar Tenders

5 found
Urgent

Charges for supply for MR Item Sl. No. 1 including GST,Charges for freight for MR Item Sl. No. 1 in

Bharat Petroleum Corporation Ltd

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Bharat Petroleum Corporation Ltd Unit Supply Price Tender SAGAR Madhya Pradesh 2026 ISI/ISO Standards Not Specified

Bharat Petroleum Corporation Ltd

📍 SAGAR, MADHYA PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

SUPPLY OF ALL GROUP A1 ITEMS AS PER MR INCLUDING GST,TRANSPORTATION OF ALL GROUP A1 ITEMS AS PER MR

Bharat Petroleum Corporation Ltd

📍 SAGAR, MADHYA PRADESH

EMD: ₹50.0 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

MR ITEM SR NO 1 INCLUDING FREIGHT AND GST,MR ITEM SR NO 2 INCLUDING FREIGHT AND GST,MR ITEM SR NO 3

Indian Oil Corporation Limited

📍 PANIPAT, HARYANA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

TOTAL SUPPLY PRICE AS PER MR ITEM SL. NO. 1 INCLUDING GST,LUMPSUM SITE WORK CHARGES AS PER MR ITEM

Bharat Petroleum Corporation Ltd

📍 SAGAR, MADHYA PRADESH

EMD: ₹2.5 L
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Chat with us