Bid Publish Date
15-Oct-2026, 10:51 pm
Bid End Date
26-Oct-2026, 11:00 am
Location
Progress
Indian Army announces a tender for Isolator switch and Bty cut off Switch, Front Indicator assy LH, Front Indicator assy RH, Universal Joint Flange, Universal Joint Long Fork, Universal Joint Cross, Search light assy, Gear box high and low shifting lever switch, Wiper blade, Bty Cut off Switch, Oil Filter, Cabin Lifting Pump Assy, Ram assy, Bulb 24V 5W, Side marker light, Cabin Lifting pump repair kit, Condesor Fan in SOUTH DELHI, DELHI. Quantity: 120. Submission Deadline: 26-10-2026 11: 00: 00. Last date to apply is approaching fast!
Quantity
120
Category
Isolator switch and Bty cut off Switch
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
OEM Avg. Turnover
1
Past Performance
20 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Isolator switch and Bty cut off Switch , Front Indicator assy LH , Front Indicator assy RH , Universal Joint Flange , Universal Joint Long Fork , Universal Joint Cross , Search light assy , Gear box high and low shifting lever switch , Wiper blade , Bty Cut off Switch , Oil Filter , Cabin Lifting Pump Assy , Ram assy , Bulb 24V 5W , Side marker light , Cabin Lifting pump repair kit , Condesor Fan
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
South Delhi
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South Delhi | South Delhi | - | - | 8 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Isolator switch and Bty cut off Switch
as per detailed specification
Front Indicator assy LH
as per detailed specification
Front Indicator assy RH
as per detailed specification
Universal Joint Flange
as per detailed specification
Universal Joint Long Fork
as per detailed specification
Universal Joint Cross
as per detailed specification
Search light assy
as per detailed specification
Gear box high and low shifting lever switch
as per detailed specification
Wiper blade
as per detailed specification
Bty Cut off Switch
as per detailed specification
Oil Filter
as per detailed specification
Cabin Lifting Pump Assy
as per detailed specification
Ram assy
as per detailed specification
Bulb 24V 5W
as per detailed specification
Side marker light
as per detailed specification
Cabin Lifting pump repair kit
as per detailed specification
Condesor Fan
as per detailed specification
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Isolator switch and Bty cut off Switch | as per detailed specification | 8 | nos | soumitradey2024 | 15 | |
| 2 | Front Indicator assy LH | as per detailed specification | 8 | nos | soumitradey2024 | 15 | |
| 3 | Front Indicator assy RH | as per detailed specification | 8 | nos | soumitradey2024 | 15 | |
| 4 | Universal Joint Flange | as per detailed specification | 1 | nos | soumitradey2024 | 15 | |
| 5 | Universal Joint Long Fork | as per detailed specification | 1 | nos | soumitradey2024 | 15 | |
| 6 | Universal Joint Cross | as per detailed specification | 1 | nos | soumitradey2024 | 15 | |
| 7 | Search light assy | as per detailed specification | 4 | nos | soumitradey2024 | 15 | |
| 8 | Gear box high and low shifting lever switch | as per detailed specification | 4 | nos | soumitradey2024 | 15 | |
| 9 | Wiper blade | as per detailed specification | 6 | nos | soumitradey2024 | 15 | |
| 10 | Bty Cut off Switch | as per detailed specification | 6 | nos | soumitradey2024 | 15 | |
| 11 | Oil Filter | as per detailed specification | 8 | nos | soumitradey2024 | 15 | |
| 12 | Cabin Lifting Pump Assy | as per detailed specification | 2 | nos | soumitradey2024 | 15 | |
| 13 | Ram assy | as per detailed specification | 2 | nos | soumitradey2024 | 15 | |
| 14 | Bulb 24V 5W | as per detailed specification | 40 | nos | soumitradey2024 | 15 | |
| 15 | Side marker light | as per detailed specification | 10 | nos | soumitradey2024 | 15 | |
| 16 | Cabin Lifting pump repair kit | as per detailed specification | 8 | nos | soumitradey2024 | 15 | |
| 17 | Condesor Fan | as per detailed specification | 3 | nos | soumitradey2024 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer