TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs Tender for Computer Components & Peripheral Subassemblies in India 2026

Bid Publish Date

06-Sep-2026, 11:43 am

Bid End Date

19-Sep-2026, 12:00 pm

Generate Docs

Progress

Issue06-Sep-2026, 11:43 am
Corrigendum17-Sep-2026
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of multiple computer components and peripheral subassemblies, including items such as MOTHER BOARD, OPC DRUM, CLEANING BLADE, MAGNETIC ROLLER, SMPS 450/220V, HEAD CARTRIDGE, PROCESSOR CORE I5, DDR4 8GB RAM, CPU FAN, PRESSURE ROLLER, PRINTER LOGIC CARD, MAINTENANCE CARTRIDGE, and POWER SUPPLY CARD for military applications. The BOQ lists 13 items in total, with no explicit quantities disclosed. Acknowledged terms permit quantity variation up to 25% during contract execution and extended delivery time calculations based on purchased volume. The buyer requires advance sample approvals post-award and reserves modification or rejection if deviations occur. This tender is positioned as an advance-stage equipment and component supply for military IT and printing subsystem upgrades, with bulk supply timing linked to approved samples. The absence of specified start/end dates and estimated value means bidders should prepare flexible pricing, delivery, and sample management plans aligned to the option-clause framework and sample approval workflow.

Technical Specifications & Requirements

  • Product categories: Computer components and peripheral subassemblies (as listed in title: MOTHER BOARD, SMPS, PROCESSOR CORE I5, DDR4 RAM, CPU FAN, etc.)
  • Sample process: Submit 2 advance samples within 5 days of contract award; approval or modification list provided within 5 days; bulk supply per approved sample; delays on buyer side may extend delivery without LD
  • Quality control: Compliance with contract specifications framework; potential fresh samples and contract termination if deviations are found
  • Delivery: Calculated based on original delivery period with option-based extensions; minimum 30 days if extended
  • Documentation: Ensure compliance with terms on sample approval and non-LD extension for buyer delays

Terms, Conditions & Eligibility

  • Option clause: Purchaser may increase/decrease quantity up to 25% during contract and currency; extended delivery time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days
  • Sample clause: Advance samples to be supplied free of cost; expenses for bulk production before approval borne by Seller; major deviations may lead to termination
  • Post-award samples: 2 samples required; buyer approval determines bulk supply readiness; reference samples may be used for lot comparison
  • Compliance: Contractors must follow buyer-specified modifications if samples require changes; failure to comply can lead to rejection
  • EMD and payments: Details not specified in data; bidders should anticipate standard security and payment terms per government procurement norms

Key Specifications

  • Product/service names: MOTHER BOARD, OPC DRUM, CLEANING BLADE, MAGNETIC ROLLER, SMPS 450/220V, HEAD CARTRIDGE, PROCESSOR CORE I5, DDR4 8GB RAM, CPU FAN, PRESSURE ROLLER, PRINTER LOGIC CARD, MAINTENANCE CARTRIDGE, POWER SUPPLY CARD

  • Estimated value: Not disclosed; EMD amount not specified

  • Delivery terms: Extension rules based on quantity changes; minimum 30 days for extended delivery

  • Sample requirements: Submit 2 advance samples within 5 days of award; approval/modification list within 5 days

  • Quality/contract framework: Deviations may trigger rejection or fresh samples; bulk supply aligned to approved sample

Terms & Conditions

  • Option clause allowing ±25% quantity change during contract and currency with adjusted delivery time

  • Advance sample approval required within 5 days; 2 samples to be provided free of cost

  • Potential termination or modification if samples deviate from contract specifications

Important Clauses

Payment Terms

Not specified in data; bidders should align with standard government procurement payment practices and any vendor-specific terms in the contract

Delivery Schedule

Delivery commences from last date of original delivery order; extended time formula applies; minimum 30 days for extensions

Penalties/Liquidated Damages

Not specified in data; contract may include LD provisions per standard procurement terms

Bidder Eligibility

  • Experience in supplying computer components or related military IT peripherals

  • Ability to provide advance samples within 5 days of contract award

  • Compliance with standard government procurement certifications and OEM authorizations

Tender Data

Bid Details

Quantity

16

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

MOTHER BOARD , OPC DRUM , CLEANING BLADE , MAGNATIC ROLLER , SMPS 450 220V , HEAD CARTRADGE , PROCESSOR CORE I5 , DDR4 8GB RAM , CPU FAN , PRESSURE ROLLER , PRINTER LOGIC CARD , MAINTENANCE CARTRIDGE , POWER SUPPLY CARD

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Lalitpur

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-LalitpurLalitpur--315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9853264.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

17-Sep-2026

Extended Deadline

19-Sep-2026, 6:30 am

Opening Date

20-Sep-2026, 6:30 am

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

MOTHER BOARD

MOTHER BOARD

3 pieces Delivery: 15 days
#2

OPC DRUM

OPC DRUM

1 pieces Delivery: 15 days
#3

CLEANING BLADE

CLEANING BLADE

1 pieces Delivery: 15 days
#4

MAGNATIC ROLLER

MAGNATIC ROLLER

1 pieces Delivery: 15 days
#5

SMPS 450 220V

SMPS 450 220V

1 pieces Delivery: 15 days
#6

HEAD CARTRADGE

HEAD CARTRADGE

1 pieces Delivery: 15 days
#7

PROCESSOR CORE I5

PROCESSOR CORE I5

1 pieces Delivery: 15 days
#8

DDR4 8GB RAM

DDR4 8GB RAM

1 pieces Delivery: 15 days
#9

CPU FAN

CPU FAN

1 pieces Delivery: 15 days
#10

PRESSURE ROLLER

PRESSURE ROLLER

1 pieces Delivery: 15 days
#11

PRINTER LOGIC CARD

PRINTER LOGIC CARD

1 pieces Delivery: 15 days
#12

MAINTENANCE CARTRIDGE

MAINTENANCE CARTRIDGE

2 pieces Delivery: 15 days
#13

POWER SUPPLY CARD

POWER SUPPLY CARD

1 pieces Delivery: 15 days

Categories 14

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply

4

Financial statements (audited preferred)

5

EMD/Security deposit documents

6

Technical bid submission documents

7

OEM authorizations or distributorship letters

8

Any ISO/IS certifications or standards compliance certificates

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Indian Army computer components tender 2026 in India

Bidders must ensure compliance with the buyer’s option clause permitting ±25% quantity changes, submit 2 advance samples within 5 days of award, and provide OEM authorizations and financials. Prepare delivery plans aligned to the extended delivery formula and ensure sample approvals before bulk production.

What documents are required for Army procurement of IT components 2026

Submit GST registration, PAN, company profile, experience certificates for similar deployments, financial statements, EMD/Security deposit, technical bid, OEM authorization letters, and any ISO/IS standards certifications cited in terms. Ensure all documents are current and verifiable.

What are the technical specifications for MOTHER BOARD and DDR4 RAM in this tender

Specific manufacturer part numbers aren’t disclosed; the scope covers MOTHER BOARD and DDR4 8GB RAM among 13 items. bidders should provide compatible components meeting standard IT performance expectations and OEM compatibility, with advance sample approval prior to bulk manufacturing.

When is the delivery period defined for quantity changes in this Army tender

Delivery starts from the last date of the original delivery order; if quantity increases, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; the purchaser may extend this further up to the original delivery period.

What is required for advance sample approval in this Army procurement

Submit 2 advance samples within 5 days of contract award; the buyer will approve or list modifications within 5 days; bulk supply must adhere to the approved sample; delays in approval may extend delivery without LD.

What is the role of OEM authorizations in the Army component tender 2026

OEM authorizations verify source and warranty legitimacy for critical components like processors, motherboards, and SMPS; bidders must provide OEM letters or equivalents to demonstrate authorized supply and proper warranty support as part of the technical bid.

How will penalties or LD be enforced for missed delivery in this tender

While explicit LD terms aren’t listed, standard government contracts apply penalties for late delivery; ensure delivery schedules consider option-based extensions and buyer delays during sample approval to minimize liquidated damages.