TenderDekho Logo
Active GEM

Neyveli Uttar Pradesh Power Limited LT Dry Type Transformers Tender Kanpur Dehat UP 415V 760V 12.25V 100VA 2026

Bid Publish Date

19-Oct-2026, 3:38 pm

Bid End Date

16-Nov-2026, 3:00 pm

Progress

Issue19-Oct-2026, 3:38 pm
AwardPending

Key Highlights

  • • OEM-only bidding: Kalpa Electrikal Pvt. Ltd. permitted to participate; other bids rejected
  • • Delivery timeline: 120 days from purchase order date
  • • Quantities: option to increase up to 25% during/within contract duration
  • • Warranty: General Guarantee on Rs. 80 stamp paper for 12 months from commissioning or 18 months from supply

Tender Overview

Neyveli Uttar Pradesh Power Limited invites bids for a set of LT dry type three-phase transformers with various secondary voltages (e.g., 12.25V 100VA, 760V to 415V ranges, and 22KVA/2KVA/1KVA classes) to be delivered to Kanpur Dehat, Uttar Pradesh (209101). The procurement specifies OEM-only participation from Kalpa Electrikal Pvt. Ltd., with a firm price including all charges. The contract contemplates a delivery window of 120 days from PO date and a post-delivery payment term of 30 days after CRAC acceptance. Quantity adjustments up to 25% during or after contract are allowable. A 12-month warranty from commissioning (or 18 months from supply) is required, supported by a General Guarantee on stamped/non-judicial paper.

  • Primary product category: L T Dry Type Transformers – three-phase
  • Delivery location: Kanpur Dehat, Uttar Pradesh
  • OEM restriction: Kalpa Electrikkal Pvt. Ltd. only; fresh manufacture required
  • Delivery period: 120 days; payment: 30 days post-CRAC; warranty: 12 months from commissioning / 18 months from supply
  • Economic terms: price must be firm with all charges included; packing/forwarding and transport borne by bidder

Technical Specifications & Requirements

  • Product scope includes multiple LT dry-type transformer ratings (e.g., 22 KVA, 2 KVA, 1 KVA), with primary voltages around 760V and secondary voltages such as 415V and 12.25V.
  • Items must be freshly manufactured, not refurbished; must match specified make/model; partial item bids are not acceptable.
  • Delivery window fixed at 120 days from PO; payment within 30 days after CRAC completion and material acceptance.
  • Warranty: 12 months from commissioning or 18 months from supply, whichever occurs earlier; include a general warranty guarantee on stamp paper.
  • The bid must cover all listed items; no item-level partial bidding; packing, forwarding, and transit insurance are bidder responsibilities.
  • Procurement is restricted to OEM vendor Kalpa Electrikal Pvt. Ltd.; non-OEM bids will be considered unsolicited.

Terms, Conditions & Eligibility

  • Delivery period: 120 days from PO date; option to adjust quantity up to 25% during and after contract at contracted rates.
  • EMD/guarantee: General Guarantee for Warranty to be furnished on Rs. 80 stamp paper; must guarantee new, defect-free materials.
  • Payment terms: within 30 days after CRAC completion and site acceptance.
  • Only OEM participation: Bids from other entities will be treated as unsolicited and rejected.
  • Warranty: 12 months from commissioning; 18 months from supply; ensure materials are new and compliant with contract documents.
  • Fulfillment requires adherence to the attached ATC terms, including packaging, shipping, and delivery constraints.

Key Specifications

  • Product category: LT dry-type transformers, three-phase

  • Rated capacities observed in tender: 22 KVA, 2 KVA, 1 KVA, and other LT outputs as per BOQ

  • Primary voltage: 760V; secondary voltages include 415V and 12.25V

  • Condition: Freshly manufactured; no refurbished units

  • Delivery: 120 days from PO; packing/forwarding and transport by bidder

  • Warranty: 12 months from commissioning or 18 months from supply; General Guarantee on Rs. 80 stamp paper

Terms & Conditions

  • Delivery period fixed at 120 days; option to modify quantity by up to 25%

  • OEM-only participation; generic bids not accepted

  • Payment terms: 30 days post-CRAC acceptance; full firm price including all charges

Important Clauses

Payment Terms

Payment within 30 days after successful CRAC completion and material acceptance at site

Delivery Schedule

Delivery commence from PO date; 120 days; option to extend with proportional time if quantity increases

Penalties/Liquidated Damages

Not explicitly stated in provided terms; delivery default implications will be as per standard procurement policy

Bidder Eligibility

  • Only OEM Kalpa Electrikal Pvt. Ltd. bids allowed

  • Freshly manufactured transformers, no refurbishments

  • Compliance with 12-month/18-month warranty requirements and stamp paper guarantee

Advertisement

Tender Data

Bid Details

Quantity

14

Category

L T Dry Type Three Phase Flashing Transformer 415V 35V 22KVA

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

L T Dry Type Three Phase Flashing Transformer 415V 35V 22KVA , L. T Dry type Transformer Three Phase 760V Secondary 12.25V 100VA , L T Dry type Transformer Three Phase 760V 415V 2KVA , L T Dry type Transformer Three Phase 760V 170V 1KVA

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Kanpur Nagar

Delivery Pincodes

209206

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manoj Kumar Meena209206,OFFICE: Ghatampur Thermal Power Project Site Office, Near Lahurimau Kasimpur Village,NUPPL Ghatampur Thesil, Samuhi P.O. 209206 Kanpur Nagar Dist., Uttar Pradesh. (About 70 Kms from Kanpur City) https://goo.gl/maps/uLd5EJnhh MQ2Kanpur NagarUttar Pradesh2092062120-

Authority Records

MINISTRY OF COALNEYVELI UTTAR PRADESH POWER LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9793268.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

Technical Specification/Buyer Specification Document

TECHNICAL

Technical Specification/Buyer Specification Document

TECHNICAL

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates demonstrating OEM manufacturing capability

4

Financial statements (latest) demonstrating liquidity

5

EMD/Security deposit documentation (as applicable)

6

Technical bid documents confirming compliance with transformer specifications

7

OEM authorization letter from Kalpa Electrikal Pvt. Ltd. (if bidder is an authorized dealer)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for LT transformer tender in Kanpur Dehat UP 2026

Bidders must be OEMs or authorized dealers of Kalpa Electrikal Pvt. Ltd., submit GST, PAN, financials, experience, and OEM authorization, with fresh manufacture confirmation. Include 30-day payment terms post-CRAC and a 12-month warranty from commissioning. Ensure delivery within 120 days and adherence to the 25% quantity option policy.

What documents are required for Kalpa OEM transformer tender in UP

Required documents include GST certificate, PAN card, latest financial statements, experience certificates for similar transformer supply, OEM authorization from Kalpa Electrikal, and technical bid detailing compliance with 12 V/760 V transformer specs, ensuring fresh manufacture and warranty terms per ATC.

What is the delivery period and payment terms for this tender

Delivery must be completed within 120 days from Purchase Order. Payment will be processed within 30 days after CRAC completion and site acceptance of the material, subject to successful commissioning and warranty confirmation.

What are the essential warranty terms for LT transformers in this bid

A general warranty of 12 months from commissioning or 18 months from supply, whichever earlier, with a warranty guarantee on Rs. 80 stamp paper. Materials must be new, defect-free, and match contract specifications.

Are quantity adjustments allowed in this transformer procurement

Yes. The purchaser reserves the right to increase or decrease quantities by up to 25% of bid quantity at contract placement and during the currency, at contracted rates, with delivery time adjusted proportionally.

Which organization and product does this tender relate to in UP 2026

The tender is issued by Neyveli Uttar Pradesh Power Limited for LT dry-type three-phase transformers (various ratings) to be delivered in Kanpur Dehat, Uttar Pradesh; OEM participation is restricted to Kalpa Electrikal Pvt. Ltd. with fresh manufacture and IS/standards compliance.

What standards or certifications must the transformer supplier meet

Suppliers must ensure compliance with contract terms and achieve specifications for fresh manufacture; warranties must be valid; while IS/IEC standards are referenced in tender practice, the ATC terms emphasize quality, OEM compliance, and proper testing during CRAC validation.

How to submit the bid packaging and ensure compliance with ATC terms

Prepare a single complete bid including OEM authorization, technical compliance, pricing, delivery schedule, and warranty documents. Ensure packing, forwarding, and transit insurance are bidder responsibilities, and submit a stamped General Guarantee for warranty as per ATC Sl. No 3.

Advertisement