Replacement Injectors,Diesel Filter,Water Seperator,Wire Socket,Clutch Plate and Pressure Plate,Rel
Indian Army
BANGALORE, KARNATAKA
Progress
RAQuantity
125
Category
Rectification of engine speed vabriation by the electrician with laptop checking
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs) in BANGALORE, KARNATAKA. Procured service category: comprehensive repair and spares supply including engine speed rectification, air compressor components, propeller shafts, relays, fuel systems, electrical/ mechanical labour, and associated fittings. Scope covers Supply, Installation, Testing and Commissioning (SITC) of goods. Estimated value and EMD are not disclosed. A 25% quantity increase/decrease option may be exercised during/after contract at contracted rates. Local service proximity required within 50 KM of ASC Centre (North).
Option to increase/decrease quantity up to 25% with extended delivery period rules
SITC scope for all listed spares and components; delivery proximity requirement
Mandatory document uploads; ATC/Corrigendum-driven terms apply
Payment terms are defined in the bid documentation and ATC; exact milestones not provided in summary
Delivery commences from the last date of original delivery order; extension governed by option clause with minimum 30 days
Penalty details and performance bonds, if any, will be defined in the full Terms and Conditions
Local supplier capability within 50 KM of ASC Centre (North)
Experience in SITC of automotive/mechanical/spares and electrical repair
Financially sound with audited statements and EMD compliance
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BANGALORE, KARNATAKA
Indian Army
Indo Tibetan Border Police (itbp)
CHANDIGARH, CHANDIGARH
Indian Army
BANGALORE, KARNATAKA
Indo Tibetan Border Police (itbp)
CHANDIGARH, CHANDIGARH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Rectification of engine speed vabriation by the electrician with laptop checking | AS PER RFP | 1 | job | oicrepair | 45 |
| 2 | Air compressor plate | AS PER RFP | 1 | nos | oicrepair | 45 |
| 3 | Air compressor packing kit | AS PER RFP | 1 | nos | oicrepair | 45 |
| 4 | Propellar shaft bolt | AS PER RFP | 4 | nos | oicrepair | 45 |
| 5 | Starting realy 4 pin | AS PER RFP | 2 | nos | oicrepair | 45 |
| 6 | 12V relay | AS PER RFP | 2 | nos | oicrepair | 45 |
| 7 | Fuel pipe | AS PER RFP | 1 | nos | oicrepair | 45 |
| 8 | Air pressure hose pipe | AS PER RFP | 1 | nos | oicrepair | 45 |
| 9 | Window regulator assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 10 | Door lock with key | AS PER RFP | 1 | nos | oicrepair | 45 |
| 11 | Door catch | AS PER RFP | 2 | nos | oicrepair | 45 |
| 12 | Clutch cylinder kit | AS PER RFP | 1 | nos | oicrepair | 45 |
| 13 | Air horn assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 14 | Combination switch | AS PER RFP | 1 | nos | oicrepair | 45 |
| 15 | Fuel feed pump overhauling | AS PER RFP | 1 | job | oicrepair | 45 |
| 16 | Repair of self starter assy by replacing armature field coil solenoid and brush holder | AS PER RFP | 1 | job | oicrepair | 45 |
| 17 | Electrician labour charges for repairing all broken wires replacement of clips fuses sleeves | AS PER RFP | 1 | job | oicrepair | 45 |
| 18 | Mechamical labour charges for removal of other unsv items fitment of new spares | AS PER RFP | 1 | job | oicrepair | 45 |
| 19 | Diesel pipe | AS PER RFP | 1 | nos | oicrepair | 45 |
| 20 | Diesel filter bracket | AS PER RFP | 1 | nos | oicrepair | 45 |
| 21 | Benjo bolt and waasher | AS PER RFP | 4 | set | oicrepair | 45 |
| 22 | Gear lever end big | AS PER RFP | 1 | nos | oicrepair | 45 |
| 23 | Properllar shaft nut and bolt | AS PER RFP | 8 | nos | oicrepair | 45 |
| 24 | Rear brake booster assy | AS PER RFP | 2 | nos | oicrepair | 45 |
| 25 | Brake booster assy front | AS PER RFP | 1 | nos | oicrepair | 45 |
| 26 | Door lock with key | AS PER RFP | 1 | nos | oicrepair | 45 |
| 27 | Window regulator assy | AS PER RFP | 2 | nos | oicrepair | 45 |
| 28 | Clutch cylinder kit | AS PER RFP | 1 | nos | oicrepair | 45 |
| 29 | Door catch | AS PER RFP | 1 | nos | oicrepair | 45 |
| 30 | Fuel strainer | AS PER RFP | 1 | nos | oicrepair | 45 |
| 31 | Air pressure vaccum pipe 10.5 feet | AS PER RFP | 1 | nos | oicrepair | 45 |
| 32 | Left diesel tank to right diesel tank connecting pipe with union | AS PER RFP | 1 | nos | oicrepair | 45 |
| 33 | Diesel pipe tank to diesel filter with camp | AS PER RFP | 1 | nos | oicrepair | 45 |
| 34 | Bonet grill screw | AS PER RFP | 6 | nos | oicrepair | 45 |
| 35 | Rear brake adjusting slak | AS PER RFP | 1 | nos | oicrepair | 45 |
| 36 | Fuel feed pump assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 37 | EDC pump assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 38 | Cabin jack hydraulic pressure pipe | AS PER RFP | 2 | nos | oicrepair | 45 |
| 39 | Rear propeller shaft spiderr bearing | AS PER RFP | 1 | nos | oicrepair | 45 |
| 40 | Rear propeller shaft lathe work | AS PER RFP | 1 | job | oicrepair | 45 |
| 41 | Front brake booster benjo union, bolt and washer | AS PER RFP | 1 | set | oicrepair | 45 |
| 42 | Gear box top main shaft adjusting bolt spring and turbocharger switch | AS PER RFP | 1 | set | oicrepair | 45 |
| 43 | Alternator adjusting bracket and mounting bolt | AS PER RFP | 1 | set | oicrepair | 45 |
| 44 | Self starter mounting stud nit and fuel feed pump mounting nut | AS PER RFP | 1 | set | oicrepair | 45 |
| 45 | Water seperator | AS PER RFP | 1 | nos | oicrepair | 45 |
| 46 | Repair of self starter assy by replacing armature field coil solenoid and brush holder | AS PER RFP | 1 | job | oicrepair | 45 |
| 47 | Cabin jack assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 48 | RH front brake booster benjo bolt with coopper washer | AS PER RFP | 1 | set | oicrepair | 45 |
| 49 | Iginition switch | AS PER RFP | 1 | nos | oicrepair | 45 |
| 50 | Starting realy 4 pin | AS PER RFP | 2 | nos | oicrepair | 45 |
| 51 | Relay 24V | AS PER RFP | 3 | nos | oicrepair | 45 |
| 52 | Electrical wire roll | AS PER RFP | 1 | rol | oicrepair | 45 |
| 53 | Tappet cover gasket | AS PER RFP | 1 | nos | oicrepair | 45 |
| 54 | Combination switch | AS PER RFP | 1 | nos | oicrepair | 45 |
| 55 | Cabin lifting hydraulic pump overhauling | AS PER RFP | 1 | job | oicrepair | 45 |
| 56 | Electrician labour charges for repairing alll broken wires replacement of clips fuses sleeves | AS PER RFP | 1 | job | oicrepair | 45 |
| 57 | Mechanical labour charges for removal of old items fitment of new spare parts | AS PER RFP | 1 | job | oicrepair | 45 |
| 58 | Starting realy 4 pin | AS PER RFP | 2 | nos | oicrepair | 45 |
| 59 | Transfer case mounting bracket | AS PER RFP | 2 | set | oicrepair | 45 |
| 60 | Transfer case mounting nut and bolt | AS PER RFP | 1 | set | oicrepair | 45 |
| 61 | Door lock with key | AS PER RFP | 1 | nos | oicrepair | 45 |
| 62 | Winodw regulator assy | AS PER RFP | 2 | nos | oicrepair | 45 |
| 63 | Air pressure packing kit | AS PER RFP | 1 | nos | oicrepair | 45 |
| 64 | Radiator hose pipe | AS PER RFP | 1 | nos | oicrepair | 45 |
| 65 | Door catch | AS PER RFP | 2 | nos | oicrepair | 45 |
| 66 | Combination switch | AS PER RFP | 1 | nos | oicrepair | 45 |
| 67 | Radiator repair and overhauling | AS PER RFP | 1 | job | oicrepair | 45 |
| 68 | Gear box top overhauling | AS PER RFP | 1 | job | oicrepair | 45 |
| 69 | Repair of self starter assy by replacing armature field coil solenoid and brush holder | AS PER RFP | 1 | job | oicrepair | 45 |
| 70 | Electrical labour charges for repairing all broken wires repalcement of clips fuese sleeves | AS PER RFP | 1 | job | oicrepair | 45 |
| 71 | Mechanical labour charges for removal of old items, fitment of new spare parts | AS PER RFP | 1 | job | oicrepair | 45 |
| 72 | Transfer case rear oil seat | AS PER RFP | 1 | nos | oicrepair | 45 |
| 73 | Steering gear box oil seal kit and overhauling | AS PER RFP | 1 | job | oicrepair | 45 |
| 74 | Engine oil slump grinding and breezing | AS PER RFP | 1 | job | oicrepair | 45 |
| 75 | Engine sump bolt | AS PER RFP | 4 | nos | oicrepair | 45 |
| 76 | Anabond large | AS PER RFP | 1 | nos | oicrepair | 45 |
| 77 | Door lock with key | AS PER RFP | 1 | nos | oicrepair | 45 |
| 78 | Window regulator assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 79 | Window glass beading | AS PER RFP | 1 | nos | oicrepair | 45 |
| 80 | Door catch | AS PER RFP | 2 | nos | oicrepair | 45 |
| 81 | Pressure plate | AS PER RFP | 1 | nos | oicrepair | 45 |
| 82 | Clutch plate | AS PER RFP | 1 | nos | oicrepair | 45 |
| 83 | Release bearing | AS PER RFP | 1 | nos | oicrepair | 45 |
| 84 | Flywheel assy | AS PER RFP | 1 | nos | oicrepair | 45 |
| 85 | Lathe work | AS PER RFP | 1 | job | oicrepair | 45 |
| 86 | Rear hub oil seal | AS PER RFP | 2 | nos | oicrepair | 45 |
| 87 | Gear shift selector | AS PER RFP | 1 | nos | oicrepair | 45 |
| 88 | Gear shift selector nut and bolt | AS PER RFP | 1 | set | oicrepair | 45 |
| 89 | Mechanical labour charges for removal of old items, fitment of new spare parts | AS PER RFP | 1 | job | oicrepair | 45 |
- GST registration certificate
- PAN card
- Experience certificates (relevant repair/spares experience)
- Financial statements (audited if available)
- EMD/Security deposit documents as specified in Bid Document
- Technical bid documents demonstrating SITC capability
- OEM authorizations or reseller certificates (if required by ATC)
- Any certificates referenced in Bid Document, ATC, or Corrigendum
Start
12-Dec-2025, 1:00 pm
End
13-Dec-2025, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | YASHICA ENGINEERING(MSE) Under PMA Winner | ₹2,65,074 | Item Categories : Rectification of engine speed vabriation by the electrician with laptop checking,Air compressor pla |
| L2 | EAGLES TECH (MSE) Under PMA | ₹2,68,674 | Item Categories : Rectification of engine speed vabriation by the electrician with laptop checking,Air compressor pla |
| L3 | ABHEDYA RESOURCES PRIVATE LIMITED Under PMA | ₹2,84,196 | Item Categories : Rectification of engine speed vabriation by the electrician with laptop checking,Air compressor pla |
🎉 L1 Winner
YASHICA ENGINEERING(MSE) Under PMA
Final Price: ₹2,65,074
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, experience and financial documents, plus EMD as specified in Bid Document. Ensure OEM authorizations if required, and upload technical bid demonstrating SITC capability. The process follows ATC guidance; meet local service radius, and confirm 25% quantity option compliance.
Required documents include GST certificate, PAN card, audited financial statements, experience certificates for similar repair work, EMD documents, technical bid, and OEM authorizations if applicable. Upload all certificates per Bid Document and ATC; incomplete submissions risk rejection.
SITC scope covers Supply, Installation, Testing and Commissioning of all listed spares and components. It includes electrical and mechanical labour for removal and fitment, with related fittings and hoses. Final acceptance relies on commissioning tests as specified in the technical bid and contract documents.
Bidders should have a local registered address within 50 KM of ASC Centre (North) to ensure timely supply and service. This proximity condition supports prompt delivery, on-site support, and faster turnaround for repairs and SITC activities.
Purchaser may increase or decrease bid quantity by up to 25% at contracted rates. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; extension is subject to contract terms.
The BoQ includes engine components, air compressor parts, fuel systems, relays, window regulators, door locks, clutch parts, brakes, radiators, steering seals, and related mechanical/electrical spares. Exact item-level specifications are provided in the formal BoQ during bid submission.
Mandatory certificates include GST registration, PAN, experience certificates for similar work, financial statements, EMD proof, technical bid documents, and OEM authorizations if required by ATC. Ensure all uploaded certificates align with Bid Document requirements to avoid rejection.
Delivery timeline is governed by the original delivery order; extended delivery via the 25% option may apply with at least 30 days minimum. Payment terms are defined in the contract and ATC; bidders should await final terms in the tender documents to confirm milestones.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS