TenderDekho Logo
GEM

Indian Air Force Shadow Board Tool Rack System Tender 2025 - ISO 9001 Compliant, 1-Year Warranty, Shadow Board Equipment Procurement

Bid Publish Date

29-Nov-2025, 11:10 am

Bid End Date

10-Dec-2025, 9:00 am

Progress

RA
Issue29-Nov-2025, 11:10 am
Corrigendum29-Nov-2025
Reverse Auction21-Jan-2026, 1:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4

Bid Type

Two Packet Bid

Categories 1

Tender Overview

The Indian Air Force invites bids for a SHADOW BOARD TOOL RACK SYSTEM, aiming to equip maintenance facilities with organized tool storage solutions. Although start/end dates and estimated value are not disclosed, the procurement requires ISO 9001 certification for the bidder or OEM, ensuring standardized quality management. The contract contemplates a flexible quantity clause, allowing a 25% upward adjustment during placement and currency, subject to contracted rates. A critical differentiator is the explicit ISO 9001 requirement and a one-year warranty framework to guarantee post-installation performance. This tender emphasizes dependable after-sales support with established service networks in India, including installation, commissioning, training, and maintenance capabilities. Location details are not specified in the data but this is a government procurement channel via the Indian Air Force, focusing on robust, standardized storage hardware for technical bays.

Technical Specifications & Requirements

  • Product category: SHADOW BOARD TOOL RACK SYSTEM
  • Standards: ISO 9001 certification required for bidder or OEM
  • Warranty: 1 year from final acceptance or post-installation completion, with OEM warranty certificates at delivery
  • After-sales: Must have a well-established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in India; service centers near consignee destinations to be uploaded with bid
  • Quality control: Provide OEM authorizations if applicable and ensure post-delivery rectification of any breakdown during the guarantee period
  • BOQ: No items listed; emphasis on generic SHADOW BOARD rack system with potential customization per maintenance facility needs

Terms, Conditions & Eligibility

  • EMD and exact bid value are not disclosed; bidders must adhere to standard procurement norms including price and performance security where applicable
  • Quantity variation: +25% during contract and currency, minimum delivery extension formula ensures realistic timelines
  • Delivery period: Commences after last date of the original delivery order; additional time calculation based on extended quantity and original period with a minimum of 30 days
  • Documentation: ISO 9001 certificate, OEM warranty certificates, installation/training plan, service center details, and relevant authorization letters
  • Warranty/Support: 1-year warranty with guaranteed rectification, service network in India, and post-sales support commitments
  • Compliance: Bidders to comply with all Buyer Added Terms and the option clause; ensure readiness for final acceptance testing

Key Specifications

    • Product: SHADOW BOARD TOOL RACK SYSTEM
    • Standards: ISO 9001 certification for bidder or OEM
    • Warranty: 1 year from final acceptance or after installation/completion
    • After-sales: Established Indian service group; service centers near consignee destinations
    • Documentation: OEM warranties to be submitted at delivery

Terms & Conditions

  • Quantity adjustment: +25% during contract and currency at contracted rates

  • Delivery period starts from last date of original delivery order; extension rules apply

  • ISO 9001 certification mandatory for bidder or OEM; OEM warranty certificates required

Important Clauses

Payment Terms

Not specified in data; standard procurement payments to be adhered to per government norms and ATC/AT terms

Delivery Schedule

Delivery period commences after the last date of the original delivery order; additional time calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; implied compliance with standard government LD policies under ATC terms

Bidder Eligibility

  • Bidder or OEM must hold ISO 9001 certification

  • Demonstrated capability for installation, commissioning, training and maintenance within India

  • Service network presence near consignee locations and ability to upload center details with bid

Documents 4

GeM-Bidding-8651611.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SHADOW BOARD 6X4FT

Indian Air Force

Posted: 11 December 2025
Closed: 23 December 2025
GEM

SHADOW BOARD 6X4FT

Indian Air Force

GHAZIABAD, UTTAR PRADESH

Posted: 31 January 2025
Closed: 21 February 2025
GEM

Indian Air Force Shadow Board 6x4 ft Tender Vadodara Gujarat 2025

Indian Air Force

VADODARA, GUJARAT

Posted: 8 November 2025
Closed: 18 November 2025
GEM

TOOL RACK

Bharat Electronics Limited (bel)

Posted: 6 December 2024
Closed: 16 December 2024
GEM

Tool Trolley/Rack

Bharat Heavy Electricals Limited (bhel)

VARANASI, UTTAR PRADESH

Posted: 18 February 2025
Closed: 28 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

ISO 9001 certification (bidder or OEM)

4

OEM authorization (if applicable)

5

Warranty certificates from OEM

6

Installation, Commissioning & Training plan

7

Service center details near consignee locations

8

Financial statements (as applicable to bid scope)

9

Any prior similar project experience certificates

Corrigendum Updates

1 Update
#1

Update

29-Nov-2025

Reverse Auction Schedule

Completed

Start

21-Jan-2026, 1:00 pm

End

22-Jan-2026, 1:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Frequently Asked Questions

Key insights about CHANDIGARH tender market

How to bid for the shadow board tool rack tender in India 2025?

Bidders must meet ISO 9001 certification, provide OEM warranties, and submit installation/training plans plus service center details. Ensure compliance with the 25% quantity variation clause and the minimum 30-day delivery extension rule. Include required documents and ATC terms in the bid package.

What documents are required for the IAF shadow board rack bid 2025?

Submit GST, PAN, ISO 9001 certificate (bidder or OEM), OEM authorization if applicable, OEM warranty certificates, installation/commissioning plan, service center details, and financial statements as needed. Include prior similar project experience certificates if available.

What are the warranty terms for the shadow board rack system tender?

Warranty spans 1 year from final acceptance or after installation/completion. OEM warranty certificates must accompany delivery. The supplier must guarantee rectification of any break down during the warranty period and provide service support within India.

What is the delivery extension rule for quantity increases?

Delivery time can extend based on the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The purchaser may extend to the original delivery period while exercising the option clause.

What standards are required for bidder qualification in this tender?

Mandatory ISO 9001 certification for the bidder or OEM. Service capability in India for installation, commissioning, and maintenance, plus uploading of service center details near consignee locations.

What after-sales services must be demonstrated for the bid?

Provide an established service group including installation, commissioning, training, troubleshooting, and maintenance. Show nearby service centers and response capabilities to address post-delivery issues during the warranty period.

When is a delivery period applicable and how is it calculated?

Delivery starts from the last date of the original delivery order. If options are exercised, time extends as per the formula, with minimum 30 days, ensuring feasible delivery aligned with contract quantities.

What happens if quantity increases occur during contract?

Up to 25% quantity increase is permitted during placement and currency; rates remain contracted. This requires adjustment planning and adherence to lead times while preserving warranty and service commitments.

Similar Tenders

1 found

HEAVY DUTY RACK

Western Railway

📍 VADODARA, GUJARAT

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM