Bid Publish Date
29-Aug-2026, 2:45 pm
Bid End Date
08-Sep-2026, 4:00 pm
Location
Progress
Bharat Heavy Electricals Limited (BHEL) invites bids for a Fully Automatic Panel Type Star Delta Starter suitable for a 3 phase, 100 HP induction motor operating at 415 V, 50 Hz. The unit must confirm to IS:13947/2004 or latest revision per Annexure-A BOM. Quantity is listed as a single item with a 60-day delivery from PO; early delivery is acceptable. A 12-month warranty from receipt by BHEL Haridwar is required. A schematic diagram, PQR documentation, and BOM attachments are mandatory. Tender targets vendors providing Make in India compliance and valid GST/PAN documentation.
EMD: Not specified in provided data; ensure GST/PAN and EFT details with bid
Delivery: 60 days from PO; LD 0.5% per week max 10% for delays
Payment: 100% after receipt/acceptance; 45/60/90 day terms per bidder category
100% payment upon receipt and acceptance at BHEL Haridwar; additional 45/60/90 day payment windows based on bidder category and compliant documentation via SUVIDHA portal
Delivery within 60 days from PO; early delivery permitted
LD at 0.5% per week, up to 10% of delayed supply value; calculated on gross value before taxes
Must comply with Make in India (MII) requirements
Must provide GSTIN, PAN and EFT mandate
Must submit BOM, schematic diagram and PQR with bid
Quantity
6
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
FULLY AUTOMATIC PANEL TYPE STAR DELTA STARTER SUITABLE FOR 3 PHASE, 100 HP INDUCTION MOTOR
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Haridwar
Delivery Pincodes
249403
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Paras | 249403,Shipping Section, Central Plant Stores, HEEP, BHEL, Haridwar-249403 Uttarakhand | Haridwar | Uttarakhand | 249403 | 6 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Cancelled cheque (or EFT mandate)
EFT mandate certified by bank
Annexure – A BOM and schematic diagram
Pre-Qualifying Requirement (PQR) documents
Warranty certificate
Test Certificate
Make in India compliance document
GST/PAN details and vendor code creation documents
Key insights about UTTARAKHAND tender market
To bid, ensure GSTIN and PAN are active, submit Annexure – A BOM, schematic diagram, PQR documents, and warranty proof; comply with Make in India; attach EFT mandate and canceled cheque; follow 60-day delivery from PO and 12-month warranty requirement.
Submit PAN, GSTIN, canceled cheque, EFT mandate, Annexure – A BOM, schematic diagram, PQR, warranty certificate, Test Certificate, and Make in India compliance. Ensure bid is uploaded to SUVIDHA portal with all disclamers satisfied.
The starter must comply with IS:13947/2004 or latest revision; BOM specifies exact components; 415 V, 50 Hz operation; documentation includes Test Certificate and warranty; early delivery is allowed.
Delivery must be within 60 days from the Purchase Order date; earlier delivery is acceptable and will be acknowledged by BHEL Haridwar stores.
Common terms: 100% payment after receipt and acceptance; post-entry payment within 45/60/90 days based on bidder category and compliant document submission via SUVIDHA portal.
Late deliveries incur a 0.5% per week LD on the delayed value, capped at 10% of the delayed supply value; the calculation excludes taxes and duties.
Submit the Make in India compliance document attached to the Buyer Specific ATC; ensure product BOM aligns with domestic manufacturing requirements; failure may lead to disqualification.
A 12-month warranty from receipt at BHEL Stores is required; a Test Certificate must accompany the bid; PDI is not required prior to dispatch.