Bid Publish Date
23-Sep-2026, 8:13 pm
Bid End Date
03-Oct-2026, 9:00 pm
Location
Progress
The opportunity is a Government e-Market (GEM) tender issued for a procurement requirement located in CUDDAPAH, ANDHRA PRADESH 516001. The document notes a flexible quantity clause allowing up to 25% variation at contract award and during the contract currency, at contracted rates. The delivery timeline follows a formula based on the original delivery period, with a mandatory minimum of 30 days for extensions. An ATC document has been uploaded and is accessible to bidders for compliance guidance. The BOQ contains zero items, indicating either a placeholder tender or an information-only posting. This tender emphasizes quantity adjustment and delivery scheduling flexibility as distinguishing features.
Product/service names: Not specified in BOQ
Estimated value: Not disclosed
Category/type: Not disclosed (no BOQ items)
Delivery requirement: Minimum extension period 30 days; extension formula
Standards/certifications: Not specified in data; refer to ATC
OEM/brand requirements: Not specified
Quality/testing: Not specified
Warranty/AMC: Not specified
Qty variation up to 25% at contract award and during currency
Delivery extension formula based on original delivery period with a 30-day minimum
ATC document uploaded; review mandatory for compliance
BOQ shows zero items; rely on ATC for scope and requirements
Minimum extension time of 30 days; extension formula based on original vs increased quantity
bidder must implement up to 25% variation at award and during currency
Eligibility will be governed by ATC terms and standard GEM vendor requirements
Must comply with up-to-date GST and PAN documentation
Demonstrated ability to handle quantity variation up to 25% and delivery extensions
Quantity
20
Bid Type
Service
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Tender Category
Goods
Bid To RA
No
Delivery Locations
1
Delivery Cities
Y.S.R.
Delivery Pincodes
516003
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| S Ganesh | 516003,KAYATALA CENTER, RAVINDRANAGAR POST, BALAJINAGAR, KADAPA | Y.S.R. | Andhra Pradesh | 516003 | 18 | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates demonstrating relevant prior engagements
Financial statements (latest) for financial stability
EMD/Security deposit documents (if applicable per ATC)
Technical bid documents and any OEM authorizations (if required by ATC)
ATC acknowledgment or compliance statements
Any other bidder-specific documents requested in the ATC orTERMS
Key insights about ANDHRA PRADESH tender market
Bidders should first review the uploaded ATC document for compliance, assemble GST and PAN registrations, gather experience certificates, and prepare financial statements. Ensure readiness to handle quantity variation up to 25% and adhere to the delivery extension formula with a minimum 30 days. Submit all required BID documents per ATC.
Submit GST certificate, PAN card, experience certificates, latest financial statements, EMD/Security deposit as applicable, technical bid documents, OEM authorizations if mandated, and ATC acknowledgment. All documents must align with the ATC terms and GEM procurement guidelines.
The Purchaser may increase or decrease the ordered quantity by up to 25% at contract award and during the currency of the contract at the contracted rates. This requires bidders to plan scalability and adjust production or procurement accordingly.
The extension formula states: additional time = (increased quantity / original quantity) × original delivery days, with a minimum of 30 days. If original delivery is under 30 days, extension equals the original period. Review ATC for any deviations.
The ATC document contains mandatory compliance criteria, including delivery timelines, quantity variation handling, and any product-specific standards. Bidders must acknowledge and implement ATC requirements in the technical bid and confirm acceptance in the bid submission.
Delivery commencement is counted from the last date of the original delivery order; ensure your scheduling aligns with the delivery timeline and potential extensions defined by the 25% variation clause in the ATC.