TenderDekho Logo
GEM

Indian Army Demolition & Dismantling Works Tender Raigad Maharashtra 9001 ISO 2025

Bid Publish Date

28-Oct-2025, 4:58 pm

Bid End Date

18-Nov-2025, 5:00 pm

EMD

₹34,500

Progress

RA
Issue28-Oct-2025, 4:58 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

1275

Category

Demolition of brick stone masonry

Bid Type

Two Packet Bid

Key Highlights

  • ISO 9001 certification mandatory for bidder or OEM
  • 25% quantity variation rights during contract
  • Bankers’ Cheque-based EMD accepted; BC delivery required
  • Imported items require India-based OEM with after-sales support
  • PAN, GSTIN, cancelled cheque, EFT mandate as submission documents
  • Delivery period calculations with minimum 30 days

Categories 23

Tender Overview

Organization: Indian Army (Department Of Military Affairs) in Raigad, Maharashtra seeks procurement for demolition and dismantling works including brick stone masonry demolition, reinforced cement concrete removal, barbed wire dismantling, concrete removal, and related reinforcement cleaning. EMD: ₹34,500. Delivery context: option clause allows ±25% quantity change at contract, with extended delivery time calculated from original or extended period, minimum 30 days. Certification requirement: ISO 9001 certified bidders or OEMs. Payment: Bankers’ Cheque accepted as EMD/PG; hardcopy delivery within 5 days of bid end. This tender emphasizes compliance with specific certifications and post-tender documentation.

Technical Specifications & Requirements

  • Product/Service: Demolition and allied dismantling works per civil construction scope including brick stone masonry, cement concrete, stone slabs, chowkats/frames, and reinforcement scraping.
  • Quantity/Value: 13 BOQ items listed; exact quantities not disclosed; EMD amount explicitly stated as ₹34,500.
  • Standards & Certifications: ISO 9001 certification required; OEM/Authorized Seller for imported items must have India-based after-sales support.
  • Documents & Compliance: PAN, GSTIN, cancelled cheque, EFT mandate; upload BC proof if using EMD banker’s cheque; ensure delivery of hard copy within 5 days.
  • Delivery & Scope: terms permit up to 25% quantity variation; delivery schedule aligned to original/extended delivery periods with minimum 30 days.
  • OEM/Support: Imported items require Indian office for after-sales; relevant certificates to be submitted.

Terms, Conditions & Eligibility

  • EMD/Payment Terms: EMD ₹34,500 via Bankers’ Cheque; or online; provide BC proof; delivery of hard copy within 5 days post bid end.
  • Experience & Turnover: ISO 9001 certification requirement; OEM/authorized seller for imported items with Indian after-sales support.
  • Delivery Timelines: Option clause allows quantity extension; delivery time adjustments based on formula; minimum 30 days.
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; vendor code creation documents.
  • Other Conditions: Bidder must upload all certificates; compliance with ATC/Corrigendum; clause on quantity variation; acceptance of terms by purchaser.

Key Specifications

  • Demolition and dismantling scope: brick stone masonry, cement concrete, reinforced cement concrete, barbed wire, chowkats/frames, stone slabs/tiles, reinforcement scraping

  • EMD amount: ₹34,500

  • 13 BOQ items with unspecified quantities

  • ISO 9001 certification required

  • Imported items require India-based OEM/authorized seller and after-sales support

Terms & Conditions

  • EMD of ₹34,500 payable via Bankers’ Cheque or online

  • 25% quantity variation rights during contract

  • ISO 9001 certification mandatory for bidder or OEM

Important Clauses

Payment Terms

EMD ₹34,500; Bankers’ Cheque or online; BC proof required; hard copy to buyer within 5 days

Delivery Schedule

Option to adjust quantity up to 25%; delivery period based on original/extended period with minimum 30 days

Penalties/Liquidated Damages

Not specified

Bidder Eligibility

  • ISO 9001 certification for bidder or OEM

  • Authorized importer for imported items with India-based after-sales support

  • Submission of required documents: PAN, GSTIN, EFT mandate, canceled cheque

Documents 5

GeM-Bidding-8458432.pdf

Main Document

Scope Of Work Document

SCOPE_OF_WORK

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Demolition of brickwork built in cement mortar as per Scope of Wk,M and L for brick work with Fly a

Indian Army

JALPAIGURI, WEST BENGAL

Posted: 3 December 2025
Closed: 13 December 2025
GEM

Dismantling of Plain or corrugated steel sheeting any gauge thickness including Nainital or similar

Indian Army

BARDHAMAN, WEST BENGAL

Posted: 9 September 2025
Closed: 19 September 2025
GEM

Demolishing Cement Concrete Manually by mechanical means including disposal of material within 50 m

Indian Army

LUCKNOW, UTTAR PRADESH

Posted: 5 January 2025
Closed: 27 January 2025
GEM

Demolition Old Roof,Construction of New Roof,Construction of Fresh Wall,Laying of Tiles,Doors and W

Director General Of National Cadet Corps (dgncc)

CHITTOOR, ANDHRA PRADESH

Posted: 23 September 2025
Closed: 3 October 2025
GEM

DISMANTLING BRICK WORK,DISMANTLING PCC or RCC,EXCAVATION OF EARTH,PCC M10,RCC M20,SHUTTERING,STEEL

Hindustan Petroleum Corporation Ltd

PALAKKAD, KERALA

Posted: 2 July 2025
Closed: 12 July 2025
GEM

Bill of Quantities (BOQ) 13 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Demolition of brick stone masonry Demolition of brick stone masonry 1,093 cum bsonwkaranja 30
2 Dismantling wrought iron or mild steel work Dismantling wrought iron or mild steel work 35 qtl bsonwkaranja 30
3 Taking down of barbed wire Taking down of barbed wire 38 100 rm bsonwkaranja 30
4 Demolition of Cement Concrete un reinforced Demolition of Cement Concrete un reinforced 15 cum bsonwkaranja 30
5 Removing excavated demolished material old debries Removing excavated demolished material old debries 40 cum bsonwkaranja 30
6 Demolition of brick stone masonry built in cement mortar Demolition of brick stone masonry built in cement mortar 20 cum bsonwkaranja 30
7 Demolition of reinforced cement concrete Demolition of reinforced cement concrete 15 cum bsonwkaranja 30
8 Dismantling wrought iron or mild steel work Dismantling wrought iron or mild steel work 1 qtl bsonwkaranja 30
9 Taking down chowkats or frames Taking down chowkats or frames 8 each bsonwkaranja 30
10 Dismantling of stone slabs tiles Dismantling of stone slabs tiles 1 sqm bsonwkaranja 30
11 Demolition of Cement Concrete Demolition of Cement Concrete 4 cum bsonwkaranja 30
12 Separating, scraping and cleaning of reinforcement Separating, scraping and cleaning of reinforcement 1 qtl bsonwkaranja 30
13 Removing excavated demolished material old debries Removing excavated demolished material old debries 4 cum bsonwkaranja 30

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate (bank-certified)

5

ISO 9001 certificate ( bidder or OEM)

6

OEM authorization for imported items

7

BC proof if EMD via Banker’s Cheque

8

Hard copy EMD delivery within 5 days of bid end

9

Vendor code creation documents

Reverse Auction Schedule

Completed

Start

21-Nov-2025, 4:00 pm

End

22-Nov-2025, 4:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1MALIK TRADERS(MII)   Under PMA Winner ₹5,48,305Item Categories : Demolition of brick stone masonry,Dismantling wrought iron or mild steel work,Taking down of barbed
L2Mahika Enterprises (MSE,MII)   Under PMA₹5,50,225Item Categories : Demolition of brick stone masonry,Dismantling wrought iron or mild steel work,Taking down of barbed
L3PHEONIX ENGINEERS AND CONTRACTORS (MSE,MII)   Under PMA₹5,82,155Item Categories : Demolition of brick stone masonry,Dismantling wrought iron or mild steel work,Taking down of barbed

🎉 L1 Winner

MALIK TRADERS(MII)   Under PMA

Final Price: ₹5,48,305

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on the demolition tender in Raigad Maharashtra 2025?

Bidders must ensure ISO 9001 certification, provide PAN, GSTIN, cancelled cheque, EFT mandate, and EMD ₹34,500 via Banker’s Cheque or online. Upload BC proof and deliver hard copies within 5 days of bid end; comply with quantity variation clause up to 25%.

What documents are required for this Indian Army demolition bid?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, ISO 9001 certificate (bidder or OEM), OEM authorization for imported items, BC proof if EMD is Banker’s Cheque, and hard copy EMD delivery within 5 days; ensure certificates match ATC/Corrigendum.

What standards govern the bidder for imported demolition products?

Imported items require an India-based OEM or authorized seller with after-sales service; ISO 9001 must be held by bidder or OEM; provide relevant certificates and India-based support documentation as part of bid submission.

What is the EMD amount and payment method for this tender?

EMD is ₹34,500; acceptable payment methods include Bankers’ Cheque or online transfer; if using Bankers’ Cheque, provide BC proof and deliver the hard copy within 5 days after bid end.

What are the key delivery terms and quantity variation rules?

The purchaser may increase or decrease quantity up to 25% at contract placement and during currency; delivery period adjusts with a minimum 30-day extension; extension formula is (Increased quantity ÷ Original quantity) × Original delivery period.

Which organisations and location are involved in this tender?

Organization is the Indian Army, Department Of Military Affairs, for a project in Raigad, Maharashtra; the scope covers demolition and dismantling works with related reinforcement cleaning and concrete removal as specified in the BOQ.

What are the essential submission requirements for this bid?

Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, ISO 9001 certificate, OEM authorization for imported items, EMD proof (BC if used), and ensure hard copy EMD delivery within 5 days; upload all certificates per ATC/Corrigendum.

How can bidders ensure compliance with ATC and corrigendum changes?

Bidders must strictly upload all documents referenced in the Bid, ATC, and any Corrigendum; monitor updated instructions and ensure alignment with revised standards and delivery terms before submission.