TenderDekho Logo
Closed GEM

Invitation to Bid - Discharge Refrigerant Piping,Copper Wire,CPVC Condensate Drain Pipe,Installation Charges,Gas Topup in BANGALORE, KARNATAKA

Bid Publish Date

27-Mar-2025, 5:27 pm

Bid End Date

21-Apr-2025, 6:00 pm

Progress

Issue27-Mar-2025, 5:27 pm
Technical04-Nov-2025, 2:45 pm
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

244

Category

Discharge Refrigerant Piping

Bid Type

Two Packet Bid

Categories 44

Isro invites bids for Discharge Refrigerant Piping, Copper Wire, CPVC Condensate Drain Pipe, Installation Charges, Gas Topup in BANGALORE, KARNATAKA. Quantity: 244. Submission Deadline: 21-04-2025 18: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Discharge Refrigerant Piping , Copper Wire , CPVC Condensate Drain Pipe , Installation Charges , Gas Topup

Authority Records

SPACE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7642357.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Discharge Refrigerant Piping

Supply,Installation,testing and commissioning of Suitable size 22SWG Soft drawn copper Suction and Discharge Refrigerant Piping with 13mm thick tubular nitrile rubber insulation As per Specification Document

90 rmt Delivery: 10 days
#2

Copper Wire

Supply and Laying of 4Cx2.5 Sqmm PVC insulated, overall sheathed,1.1 KV grade copper conductor unarmoured cable for power/control wiring between indoor & outdoor units with proper ties etc., As per Specification Document.

100 rmt Delivery: 10 days
#3

CPVC Condensate Drain Pipe

Supply and installation of CPVC condensate Drain pipe along with necessary fittings & accessories. As per Specification Document.

30 rmt Delivery: 10 days
#4

Installation Charges

Specification Document Sl. No 4,5 & 6 Together.

9 nos Delivery: 10 days
#5

Gas Topup

Charges towards gas top up for all ac units.

15 kg Delivery: 10 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
COMCAT   Under PMA
-11-04-2025 14:45:57

Financial Results

Rank Seller Price Item
L1
COMCAT(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Discharge Refrigerant Piping,Copper Wire,CPVC Condensate Drain Pipe,Installation Charges,Gas Topup

Frequently Asked Questions

Key insights about KARNATAKA tender market

What are the eligibility requirements for GEM/2025/B/6055036 or the reinstallation of SPLIT AC?

The eligibility requirements include being a registered entity that holds valid licenses related to HVAC services. Bidders should have prior experience in air conditioning installations and must comply with local regulations. Additionally, companies must demonstrate their capability through documented evidence of past projects in the field.

What technical specifications must bidders meet for the GEM/2025/B/6055036 tender?

Bidders are required to comply with specific technical specifications, which include the use of high-quality materials, such as compliant refrigerant piping and condensate drain pipes. Quality standards must surpass the industry norms, and all bidders should present documentation supporting compliance with the specified technical and safety standards.

What are the payment terms outlined in the GEM/2025/B/6055036 tender?

The payment terms stipulate that payments will be made upon the satisfactory completion of work, inspection, and acceptance of the installed AC units. Additionally, performance security may be required to ensure compliance with the contract terms throughout the project duration.

What are the requirements for the Earnest Money Deposit (EMD) for GEM/2025/B/6055036?

The Earnest Money Deposit (EMD) is a specified amount that bidders must submit alongside their proposals to demonstrate commitment. This EMD will be refunded to unsuccessful bidders after the tender process concludes but will be forfeited if the bidder withdraws after submission.

What benefits are provided for Micro, Small, and Medium Enterprises (MSEs) in the GEM/2025/B/6055036 tender?

The tender offers advantages for Micro, Small, and Medium Enterprises (MSEs), including relaxed qualification requirements and specific provisions aimed at encouraging participation from smaller entities. MSEs can also enjoy support in terms of contracting preferences and support in navigating compliance with the tender regulations.