TenderDekho Logo
Closed GEM

Contract Bidding Open For SOCKET 6A,COPPER WIRE 1.5MM 1CORE PER COIL 90MTR,COPPER WIRE 1MM 1CORE PER COIL 90MTR,COPPER WIRE 2 in MAHARAJGANJ, UTTAR PRADESH

Bid Publish Date

14-Aug-2026, 3:15 pm

Bid End Date

25-Aug-2026, 4:00 pm

EMD

₹15,050

Progress

Issue14-Aug-2026, 3:15 pm
Technical20-08-2026 13:24:34
Financial
Award02-Sep-2026, 1:16 am

Public procurement opportunity for Directorate Of Training And Employment, Lucknow SOCKET 6A, COPPER WIRE 1. 5MM 1CORE PER COIL 90MTR, COPPER WIRE 1MM 1CORE PER COIL 90MTR, COPPER WIRE 2. 5MM 1CORE PER COIL 90MTR, COPPER WIRE 4MM 1CORE PER COIL 90MTR, PVC BOARD 8X10, PHENYL 1LTR, MCB 16 AMP 1P, LED TUBLIGHT 20W, SOLDER WIRE 60-40 PER KG, OFFICE CHAIR, SOCKET 16A, COMPUTER REPAIRING WITH ACCESSORIES, PADLOCK 65MM, LATHE MACHINE REAPAIRING AND SERVICE, LIPISTIC ELLE18, MCB 32A 1P, MAKE UP REMOVER LOTUS, WAX CREAM 600GM, GARNIER LIGHT CREAM BIG 50GM, ROSE WATER 200ML DABUR, COTTON 500GM FOR PARLOR, EYE SHADOW IMPORTED, KAJAL LAKME, FACIAL KIT NATURES, MOUSITURIZER JOVEES 100ML, EYEBROW PENCIL LAKME, MASSAGE CREAM AYUR, FACE FOUNDATION CHARM ACY, MOBIL OIL PER LTR, GREAS PER KG, CAT -6 CABLE 305MTR, PENDRIVER 128GB, Servo Stabilizer 5 kva 110 v, Solding flux 15 gm, Bread board, Genral puruse pvc, Connecting wire par mtr, Battery 9 v, Ressistance mix valu 1-2 w, Diode 4007, Capacitor 100 mfd 25 v, IC 7805, IC 7809, IC 78012, IC 7905, IC 7909, IC 7912, IC 555, Paints par ltr, Wooden polish par ltr, Varnish par ltr, POP per kg, Lathe machine belt b 30, LED Bulb 15 w, LED Bulb 20 w, Flood light 100 w, Mani fold gauge charging light, Copper pipe 1- 2PER MTR, Copper pipe1-4 PER mtr, Refrigerant 134 PER can, Refrigerant R22 PER can, Thermostage for freez, Refrigerant R 32 par 8 kg with cylender, Switch 16 amp, relay and olp par set, PVC TAPE 19MM, BRAZING ROD COPPER TO COPPER PER KG, CAPALIRY TUBE 031 PER FIT, CAPALIRY TUBE 064 FOR AC PER FIT, MODULAR BOARD WITH PLATE 6M, MODULAR BOARD WITH PLATE 8M, MODULAR BOARD WITH PLATE 12M, SE WIRE ALL SIZE PER KG, CABLE 6MM 2CORE PER COIL, CABLE 10MM 2CORE PER COIL, HRC FUSE 32A, PENDENT HOLDER 6A, FIRE EXTINGUSAR POWDER TYPE 5KG PER SET, 8 X 4 PLY 18MM, ASBASTER SHEET 8 X 3. 15, PLASTIC TAP TOTI, C PVC PIPE 19MM PER PCS LENTH 10 FIT, C PVC TEE 19MM, C PVC ELBO 19MM, C PVC SOCKET 19MM, C PVC UNION 19MM, GATE VALV, TAP NIPPUL, PLASTIC TANK 500LTR, BATTEN HOLDER 6A, WOODEN BOARD 4 X 4, WOODEN BOARD 7 X 4, WOODEN BOARD 8 X 10, PLUG TOP 16A, RUNNING CAPACITOR FOR AC, STATING CAPACITOR FOR AC, CASING CAPING 25MM PER PCS, INSTRUCTER TABLE 4 X 2. 5 in MAHARAJGANJ, UTTAR PRADESH. Quantity: 7288 issued by. Submission Deadline: 25-08-2026 16: 00: 00. View full details and respond.

Authority & Contact

Organization

Directorate Of Training And Employment, Lucknow

Office Name

Giti Madhonagar Maharajganj

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
M/S SAI SYNDICATE   Under PMA
-20-08-2026 13:24:34
2
MAHIMA ENTERPRISES   Under PMA
-19-08-2026 18:01:50
3
ROYAL ENGINEERS   Under PMA
-25-08-2026 12:54:29

Financial Results

Rank Seller Price Item
L1
MAHIMA ENTERPRISES   Under PMA
Item Categories : SOCKET 6A,COPPER WIRE 1.5MM 1CORE PER COIL 90MTR,COPPER WIRE 1MM 1CORE PER COIL 90MTR,COPPER WIRE 2
L2
ROYAL ENGINEERS   Under PMA
Item Categories : SOCKET 6A,COPPER WIRE 1.5MM 1CORE PER COIL 90MTR,COPPER WIRE 1MM 1CORE PER COIL 90MTR,COPPER WIRE 2
L3
M/S SAI SYNDICATE   Under PMA
Item Categories : SOCKET 6A,COPPER WIRE 1.5MM 1CORE PER COIL 90MTR,COPPER WIRE 1MM 1CORE PER COIL 90MTR,COPPER WIRE 2

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Tender Data

Bid Details

Quantity

7288

Category

SOCKET 6A

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SOCKET 6A , COPPER WIRE 1.5MM 1CORE PER COIL 90MTR , COPPER WIRE 1MM 1CORE PER COIL 90MTR , COPPER WIRE 2.5MM 1CORE PER COIL 90MTR , COPPER WIRE 4MM 1CORE PER COIL 90MTR , PVC BOARD 8X10 , PHENYL 1LTR , MCB 16 AMP 1P , LED TUBLIGHT 20W , SOLDER WIRE 60-40 PER KG , OFFICE CHAIR , SOCKET 16A , COMPUTER REPAIRING WITH ACCESSORIES , PADLOCK 65MM , LATHE MACHINE REAPAIRING AND SERVICE , LIPISTIC ELLE18 , MCB 32A 1P , MAKE UP REMOVER LOTUS , WAX CREAM 600GM , GARNIER LIGHT CREAM BIG 50GM , ROSE WATER 200ML DABUR , COTTON 500GM FOR PARLOR , EYE SHADOW IMPORTED , KAJAL LAKME , FACIAL KIT NATURES , MOUSITURIZER JOVEES 100ML , EYEBROW PENCIL LAKME , MASSAGE CREAM AYUR , FACE FOUNDATION CHARM ACY , MOBIL OIL PER LTR , GREAS PER KG , CAT -6 CABLE 305MTR , PENDRIVER 128GB , Servo Stabilizer 5 kva 110 v , Solding flux 15 gm , Bread board , Genral puruse pvc , Connecting wire par mtr , Battery 9 v , Ressistance mix valu 1-2 w , Diode 4007 , Capacitor 100 mfd 25 v , IC 7805 , IC 7809 , IC 78012 , IC 7905 , IC 7909 , IC 7912 , IC 555 , Paints par ltr , Wooden polish par ltr , Varnish par ltr , POP per kg , Lathe machine belt b 30 , LED Bulb 15 w , LED Bulb 20 w , Flood light 100 w , Mani fold gauge charging light , Copper pipe 1- 2PER MTR , Copper pipe1-4 PER mtr , Refrigerant 134 PER can , Refrigerant R22 PER can , Thermostage for freez , Refrigerant R 32 par 8 kg with cylender , Switch 16 amp , relay and olp par set , PVC TAPE 19MM , BRAZING ROD COPPER TO COPPER PER KG , CAPALIRY TUBE 031 PER FIT , CAPALIRY TUBE 064 FOR AC PER FIT , MODULAR BOARD WITH PLATE 6M , MODULAR BOARD WITH PLATE 8M , MODULAR BOARD WITH PLATE 12M , SE WIRE ALL SIZE PER KG , CABLE 6MM 2CORE PER COIL , CABLE 10MM 2CORE PER COIL , HRC FUSE 32A , PENDENT HOLDER 6A , FIRE EXTINGUSAR POWDER TYPE 5KG PER SET , 8 X 4 PLY 18MM , ASBASTER SHEET 8 X 3.15 , PLASTIC TAP TOTI , C PVC PIPE 19MM PER PCS LENTH 10 FIT , C PVC TEE 19MM , C PVC ELBO 19MM , C PVC SOCKET 19MM , C PVC UNION 19MM , GATE VALV , TAP NIPPUL , PLASTIC TANK 500LTR , BATTEN HOLDER 6A , WOODEN BOARD 4 X 4 , WOODEN BOARD 7 X 4 , WOODEN BOARD 8 X 10 , PLUG TOP 16A , RUNNING CAPACITOR FOR AC , STATING CAPACITOR FOR AC , CASING CAPING 25MM PER PCS , INSTRUCTER TABLE 4 X 2.5

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 25 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

25

Delivery Locations

1

Delivery Cities

Maharajganj

Delivery Pincodes

273303

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shailendra Kumar Agrahari273303,Govt.ITI Mahrajganj Near District Jail Dhanewa Dhanei Mahrajganj-273303MaharajganjUttar Pradesh27330330025-

Authority Records

VOCATIONAL EDUCATION AND SKILL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9758295.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 99 Items Sign in for GEM prices

#1

SOCKET 6A

SOCKET 6A

300 nos Delivery: 25 days
#2

COPPER WIRE 1.5MM 1CORE PER COIL 90MTR

COPPER WIRE 1.5MM 1CORE PER COIL 90MTR

40 nos Delivery: 25 days
#3

COPPER WIRE 1MM 1CORE PER COIL 90MTR

COPPER WIRE 1MM 1CORE PER COIL 90MTR

40 nos Delivery: 25 days
#4

COPPER WIRE 2.5MM 1CORE PER COIL 90MTR

COPPER WIRE 2.5MM 1CORE PER COIL 90MTR

40 nos Delivery: 25 days
#5

COPPER WIRE 4MM 1CORE PER COIL 90MTR

COPPER WIRE 4MM 1CORE PER COIL 90MTR

40 nos Delivery: 25 days
#6

PVC BOARD 8X10

PVC BOARD 8X10

100 nos Delivery: 25 days
#7

PHENYL 1LTR

PHENYL 1LTR

300 nos Delivery: 25 days
#8

MCB 16 AMP 1P

MCB 16 AMP 1P

60 nos Delivery: 25 days
#9

LED TUBLIGHT 20W

LED TUBLIGHT 20W

200 nos Delivery: 25 days
#10

SOLDER WIRE 60-40 PER KG

SOLDER WIRE 60-40 PER KG

4 nos Delivery: 25 days
#11

OFFICE CHAIR

OFFICE CHAIR

20 nos Delivery: 25 days
#12

SOCKET 16A

SOCKET 16A

300 nos Delivery: 25 days
#13

COMPUTER REPAIRING WITH ACCESSORIES

COMPUTER REPAIRING WITH ACCESSORIES

80 nos Delivery: 25 days
#14

PADLOCK 65MM

PADLOCK 65MM

40 nos Delivery: 25 days
#15

LATHE MACHINE REAPAIRING AND SERVICE

LATHE MACHINE REAPAIRING AND SERVICE

10 nos Delivery: 25 days
#16

LIPISTIC ELLE18

LIPISTIC ELLE18

20 nos Delivery: 25 days
#17

MCB 32A 1P

MCB 32A 1P

48 nos Delivery: 25 days
#18

MAKE UP REMOVER LOTUS

MAKE UP REMOVER LOTUS

25 nos Delivery: 25 days
#19

WAX CREAM 600GM

WAX CREAM 600GM

25 nos Delivery: 25 days
#20

GARNIER LIGHT CREAM BIG 50GM

GARNIER LIGHT CREAM BIG 50GM

25 nos Delivery: 25 days
#21

ROSE WATER 200ML DABUR

ROSE WATER 200ML DABUR

25 nos Delivery: 25 days
#22

COTTON 500GM FOR PARLOR

COTTON 500GM FOR PARLOR

25 nos Delivery: 25 days
#23

EYE SHADOW IMPORTED

EYE SHADOW IMPORTED

25 nos Delivery: 25 days
#24

KAJAL LAKME

KAJAL LAKME

25 nos Delivery: 25 days
#25

FACIAL KIT NATURES

FACIAL KIT NATURES

25 nos Delivery: 25 days
#26

MOUSITURIZER JOVEES 100ML

MOUSITURIZER JOVEES 100ML

25 nos Delivery: 25 days
#27

EYEBROW PENCIL LAKME

EYEBROW PENCIL LAKME

25 nos Delivery: 25 days
#28

MASSAGE CREAM AYUR

MASSAGE CREAM AYUR

25 nos Delivery: 25 days
#29

FACE FOUNDATION CHARM ACY

FACE FOUNDATION CHARM ACY

25 nos Delivery: 25 days
#30

MOBIL OIL PER LTR

MOBIL OIL PER LTR

100 nos Delivery: 25 days
#31

GREAS PER KG

GREAS PER KG

50 nos Delivery: 25 days
#32

CAT -6 CABLE 305MTR

CAT -6 CABLE 305MTR

4 nos Delivery: 25 days
#33

PENDRIVER 128GB

PENDRIVER 128GB

15 nos Delivery: 25 days
#34

Servo Stabilizer 5 kva 110 v

Servo Stabilizer 5 kva 110 v

3 nos Delivery: 25 days
#35

Solding flux 15 gm

Solding flux 15 gm

80 nos Delivery: 25 days
#36

Bread board

Bread board

120 nos Delivery: 25 days
#37

Genral puruse pvc

Genral puruse pvc

300 nos Delivery: 25 days
#38

Connecting wire par mtr

Connecting wire par mtr

120 nos Delivery: 25 days
#39

Battery 9 v

Battery 9 v

80 nos Delivery: 25 days
#40

Ressistance mix valu 1-2 w

Ressistance mix valu 1-2 w

100 nos Delivery: 25 days
#41

Diode 4007

Diode 4007

800 nos Delivery: 25 days
#42

Capacitor 100 mfd 25 v

Capacitor 100 mfd 25 v

80 nos Delivery: 25 days
#43

IC 7805

IC 7805

120 nos Delivery: 25 days
#44

IC 7809

IC 7809

120 nos Delivery: 25 days
#45

IC 78012

IC 78012

120 nos Delivery: 25 days
#46

IC 7905

IC 7905

120 nos Delivery: 25 days
#47

IC 7909

IC 7909

120 nos Delivery: 25 days
#48

IC 7912

IC 7912

120 nos Delivery: 25 days
#49

IC 555

IC 555

120 nos Delivery: 25 days
#50

Paints par ltr

Paints par ltr

100 nos Delivery: 25 days
#51

Wooden polish par ltr

Wooden polish par ltr

6 nos Delivery: 25 days
#52

Varnish par ltr

Varnish par ltr

10 nos Delivery: 25 days
#53

POP per kg

POP per kg

80 nos Delivery: 25 days
#54

Lathe machine belt b 30

Lathe machine belt b 30

10 nos Delivery: 25 days
#55

LED Bulb 15 w

LED Bulb 15 w

200 nos Delivery: 25 days
#56

LED Bulb 20 w

LED Bulb 20 w

200 nos Delivery: 25 days
#57

Flood light 100 w

Flood light 100 w

40 nos Delivery: 25 days
#58

Mani fold gauge charging light

Mani fold gauge charging light

6 nos Delivery: 25 days
#59

Copper pipe 1-2PER MTR

Copper pipe 1-2PER MTR

45 nos Delivery: 25 days
#60

Copper pipe1-4 PER mtr

Copper pipe1-4 PER mtr

45 nos Delivery: 25 days
#61

Refrigerant 134 PER can

Refrigerant 134 PER can

30 nos Delivery: 25 days
#62

Refrigerant R22 PER can

Refrigerant R22 PER can

30 nos Delivery: 25 days
#63

Thermostage for freez

Thermostage for freez

40 nos Delivery: 25 days
#64

Refrigerant R 32 par 8 kg with cylender

Refrigerant R 32 par 8 kg with cylender

3 nos Delivery: 25 days
#65

Switch 16 amp

Switch 16 amp

200 nos Delivery: 25 days
#66

relay and olp par set

relay and olp par set

80 nos Delivery: 25 days
#67

PVC TAPE 19MM

PVC TAPE 19MM

120 nos Delivery: 25 days
#68

BRAZING ROD COPPER TO COPPER PER KG

BRAZING ROD COPPER TO COPPER PER KG

3 nos Delivery: 25 days
#69

CAPALIRY TUBE 031 PER FIT

CAPALIRY TUBE 031 PER FIT

100 nos Delivery: 25 days
#70

CAPALIRY TUBE 064 FOR AC PER FIT

CAPALIRY TUBE 064 FOR AC PER FIT

100 nos Delivery: 25 days
#71

MODULAR BOARD WITH PLATE 6M

MODULAR BOARD WITH PLATE 6M

20 nos Delivery: 25 days
#72

MODULAR BOARD WITH PLATE 8M

MODULAR BOARD WITH PLATE 8M

20 nos Delivery: 25 days
#73

MODULAR BOARD WITH PLATE 12M

MODULAR BOARD WITH PLATE 12M

20 nos Delivery: 25 days
#74

SE WIRE ALL SIZE PER KG

SE WIRE ALL SIZE PER KG

20 nos Delivery: 25 days
#75

CABLE 6MM 2CORE PER COIL

CABLE 6MM 2CORE PER COIL

4 nos Delivery: 25 days
#76

CABLE 10MM 2CORE PER COIL

CABLE 10MM 2CORE PER COIL

4 nos Delivery: 25 days
#77

HRC FUSE 32A

HRC FUSE 32A

20 nos Delivery: 25 days
#78

PENDENT HOLDER 6A

PENDENT HOLDER 6A

50 nos Delivery: 25 days
#79

FIRE EXTINGUSAR POWDER TYPE 5KG PER SET

FIRE EXTINGUSAR POWDER TYPE 5KG PER SET

10 nos Delivery: 25 days
#80

8 X 4 PLY 18MM

8 X 4 PLY 18MM

10 nos Delivery: 25 days
#81

ASBASTER SHEET 8 X 3.15

ASBASTER SHEET 8 X 3.15

20 nos Delivery: 25 days
#82

PLASTIC TAP TOTI

PLASTIC TAP TOTI

50 nos Delivery: 25 days
#83

C PVC PIPE 19MM PER PCS LENTH 10 FIT

C PVC PIPE 19MM PER PCS LENTH 10 FIT

50 nos Delivery: 25 days
#84

C PVC TEE 19MM

C PVC TEE 19MM

50 nos Delivery: 25 days
#85

C PVC ELBO 19MM

C PVC ELBO 19MM

50 nos Delivery: 25 days
#86

C PVC SOCKET 19MM

C PVC SOCKET 19MM

50 nos Delivery: 25 days
#87

C PVC UNION 19MM

C PVC UNION 19MM

50 nos Delivery: 25 days
#88

GATE VALV

GATE VALV

15 nos Delivery: 25 days
#89

TAP NIPPUL

TAP NIPPUL

15 nos Delivery: 25 days
#90

PLASTIC TANK 500LTR

PLASTIC TANK 500LTR

4 nos Delivery: 25 days
#91

BATTEN HOLDER 6A

BATTEN HOLDER 6A

200 nos Delivery: 25 days
#92

WOODEN BOARD 4 X 4

WOODEN BOARD 4 X 4

50 nos Delivery: 25 days
#93

WOODEN BOARD 7 X 4

WOODEN BOARD 7 X 4

50 nos Delivery: 25 days
#94

WOODEN BOARD 8 X 10

WOODEN BOARD 8 X 10

50 nos Delivery: 25 days
#95

PLUG TOP 16A

PLUG TOP 16A

80 nos Delivery: 25 days
#96

RUNNING CAPACITOR FOR AC

RUNNING CAPACITOR FOR AC

20 nos Delivery: 25 days
#97

STATING CAPACITOR FOR AC

STATING CAPACITOR FOR AC

20 nos Delivery: 25 days
#98

CASING CAPING 25MM PER PCS

CASING CAPING 25MM PER PCS

200 nos Delivery: 25 days
#99

INSTRUCTER TABLE 4 X 2.5

INSTRUCTER TABLE 4 X 2.5

4 nos Delivery: 25 days

Categories 57