Progress
The opportunity is issued by the Indian Army (Department Of Military Affairs) for the procurement of an Assembly Kit, Packing Box, Double Sided Adhesive Tape, Heat Shrink Tubing and Connector Cover in Sonitpur, Assam 784001. The BoQ lists 5 items with unspecified quantities and units, signaling flexible scope across multiple components. The contract accommodates a potential quantity variation of up to 50% at bid and during the currency of the contract, at contracted rates. Inspection is designated as post-receipt at the consignee site by the BOO (Bureau/Authorized Officer). Bidders should align with the ATC terms uploaded by the buyer. This procurement emphasis on modular packaging components suggests a modular, scalable supply chain for military stores.
Product names: Assembly Kit, Packing Box, Double Sided Adhesive Tape, Heat Shrink Tubing, Connector Cover
BoQ: 5 items with no published quantities or units
Delivery terms: quantity variation up to 50% at bid and during currency of contract
Inspection: post-receipt at consignee site by BOO; pre-dispatch inspection not required unless ATC states
ATC governs final technical/spec compliance
50% quantity adjustment right at contract placement and during currency
Post-receipt inspection by BOO at consignee site
Mandatory submission of PAN, GSTIN, cancelled cheque, and EFT mandate
Not specified in data; bidders should refer to ATC for payment schedule and milestones
Delivery period extension rules tied to quantity adjustments; default minimum extension of 30 days when applicable
Not specified in data; ATC may include LD terms; bidders must confirm in bid response
Onboard with required PAN and GST registrations
Compliance with EFT payment mandate via bank certification
Ability to meet ATC-specified technical standards for assembly components
Quantity
61
Category
Assembly Kit
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
10
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Assembly Kit , Packing Box , Double Sided Adhesive Tape , Heat Shrink Tubing , Connector Cover
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
SONITPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SONITPUR | SONITPUR | - | - | 13 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Assembly Kit
Assembly Kit
Packing Box
Packing Box
Double Sided Adhesive Tape
Double Sided Adhesive Tape
Heat Shrink Tubing
Heat Shrink Tubing
Connector Cover
Connector Cover
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Assembly Kit | Assembly Kit | 13 | nos | [email protected] | 30 | |
| 2 | Packing Box | Packing Box | 12 | nos | [email protected] | 30 | |
| 3 | Double Sided Adhesive Tape | Double Sided Adhesive Tape | 12 | roll | [email protected] | 30 | |
| 4 | Heat Shrink Tubing | Heat Shrink Tubing | 12 | mtr | [email protected] | 30 | |
| 5 | Connector Cover | Connector Cover | 12 | nos | [email protected] | 30 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Any OEM authorization or technical compliance certificates as per ATC
Experience certificates and financial statements may be required per ATC
Technical bid documents as specified in ATC
Key insights about ASSAM tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate along with the bid. Refer to the ATC for product-specific standards and the 50% quantity flex clause. Ensure post-receipt inspection readiness by BOO and align delivery timelines with the extended period rules.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate, and any OEM authorizations or technical compliance certificates as per ATC. Also provide financial statements and experience certificates if requested in ATC.
Technical specifics are governed by the uploaded ATC. The tender lists items as Assembly Kit, Packing Box, Double Sided Adhesive Tape, Heat Shrink Tubing, and Connector Cover; quantities are not disclosed in BoQ data, so ATC must state dimensions, materials, and standard conformance.
Delivery extensions follow the option clause: increased quantity ÷ original quantity × original delivery period, with a minimum of 30 days. If original period < 30 days, extension equals original period; extension can reach up to the original period during option exercise.
Post-receipt inspection at the consignee site is conducted by BOO. Pre-dispatch inspection is not required unless ATC specifies otherwise. This ensures conformity before acceptance of stores.
Eligibility includes valid PAN and GST registrations, bank-authenticated EFT mandate, and willingness to comply with ATC-specified standards for assembly components. Demonstrated capability to supply varied items (kit, box, tape, tubing, cover) is expected.
Download and study the ATC document uploaded by the buyer. Align product specifications with IS/BS/NABL equivalents if referenced, ensure required certifications and OEM authorizations are in place, and prepare to demonstrate post-receipt inspection readiness.
Key risk factors include profitability impact from 50% quantity variation, need for scalable logistics, and alignment of delivery commitments with extended periods. Prepare price breakups and contingency stock planning to mitigate fluctuations.