Sleepwell Single Bed Mattress 6x3 feet,Double Bed Blanket,Double Bed Sheet,Pillow with Cover,Towels
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
24-Dec-2025, 3:36 pm
Bid End Date
14-Jan-2026, 4:00 pm
Location
Progress
Quantity
263
Category
Geyser
Bid Type
Two Packet Bid
The opportunity is issued by the Indian Army (Department Of Military Affairs) for the procurement of Geyser, Water Dispenser, Mattress Single Bed, Pillow with Cover, Bed Sheet Single in the Central Delhi, Delhi 110002 region. The scope covers Supply, Installation, Testing and Commissioning of the listed goods, with five items in the BOQ. The buyer reserves a +/- 25% quantity flex and a formal extension of delivery time proportional to the change in quantity, with a minimum of 30 days. The contract emphasizes inclusive pricing across components and adherence to delivery schedules tied to the original delivery order. This tender focuses on standard lodging-room essentials, requiring coordinated installation and commissioning for immediate functional readiness. Unique aspects include option-based quantity adjustments and a clear emphasis on end-to-end supply with on-site installation.## Technical Specifications & Requirements
Product names: Geyser, Water Dispenser, Mattress Single Bed, Pillow with Cover, Bed Sheet Single
Scope: Supply, Installation, Testing and Commissioning (SITC) of goods
Quantity/BOQ: 5 items; exact quantities not disclosed
Delivery flexibility: Option clause up to 25% variation
Delivery timing: Minimum 30 days extension for extended quantity scenarios
Option Clause allows +/- 25% quantity change at contract and during currency
Delivery period scales with quantity change; minimum extension of 30 days
SITC scope included in bid price; no separate post-installation terms listed
Not specified in data; bidders should expect standard govt terms, with lump-sum SITC pricing
Delivery period linked to last date of original delivery order; extended period calculations apply per option clause
Not explicitly stated; bidders should anticipate standard government LDs for delays
Experience in SITC of household appliances or bedding goods
Financial capacity to support upfront SITC operations
Compliance with central government procurement norms and delivery to Delhi location
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
RAMGARH, JHARKHAND
Indian Army
WEST KAMENG, ARUNACHAL PRADESH
Indian Army
RAJAURI, JAMMU & KASHMIR
Indian Army
Rangareddi, TELANGANA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Geyser | Geyser | 2 | nos | sadaj | 10 |
| 2 | Water Dispenser | Water Dispenser | 1 | nos | sadaj | 10 |
| 3 | Mattress Single Bed | Mattress Single Bed | 80 | nos | sadaj | 10 |
| 4 | Pillow with Cover | Pillow with Cover | 80 | nos | sadaj | 10 |
| 5 | Bed Sheet Single | Bed Sheet Single | 100 | nos | sadaj | 10 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar SITC achievements
Financial statements showing turnover capacity
EMD/Security deposit submission documents
Technical bid documents and compliance certificates
OEM authorizations or depots for provided brands (if required)
Key insights about DELHI tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD along with technical bids. The scope includes SITC for geysers, dispensers, and bedding; adhere to the option clause and ensure delivery readiness within 30 days minimum for extended quantities.
Required documents include GST certificate, PAN, experience certificates for SITC projects, financial statements, EMD documents, OEM authorizations if applicable, and technical compliance certificates demonstrating ability to install and commission equipment.
Delivery timing is tied to the last date of the original delivery order, with extended time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days, and possible extension up to the original delivery period per the option clause.
No explicit technical specifications are provided in the data; bidders should prepare to meet SITC requirements and comply with any standard operational performance criteria stated in the final contract and suppliers must be able to install and commission these goods.
EMD amount is not specified in the data; bidders should monitor the final tender documents for the exact security deposit and method of payment (online/DD) as per standard government procurement norms.
Bidders must plan for 25% quantity adjustments both at contract placement and during the contract period, with delivery time recalculated using the stated formula and minimum 30 days extension; include contingency delivery plans in bid.
Scope includes Supply, Installation, Testing and Commissioning of the listed goods (geyser, water dispenser, bedding items). The bid price must cover all components, including installation and on-site commissioning.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS