TESTING OF TRANSFORMER TAN DELTA,TESTING OF LT BREAKER_STARTER,TESTING OF HT BREAKERS,TESTING OF RE
Hindustan Petroleum Corporation Ltd
Progress
Quantity
1920
Category
VCB bottles testing
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd has released a public tender for VCB bottles testing, VCB Testing, DCRM_HT VCB, DG_IR_DEA_PI, Motors Winding Test, Transformer Testing, WTI Calib_Transformer, Tan Delta_Transformer, PDT_Transformer, SFRA_Transformer, DFRA_Transformer, VLF Test_HT Cable, PDT_HT Cable, Tan Delta_HT Cable, IR_PI_HT Cable, PI_HT Panels, PF Meter_Calib_Test, Insulation Mat testing, IR_PI_LT Cable, RCCB and ELCB Testing, TOLR_EFR Testing, WM_MFM_EM_Testing, AM_VM_FM_Testing, ACB Testing, Thermography of Panesl, Earth Pit Testing, EF Impedence Testing, IR_Switch Board, CI_IR_Busduct, Gloves testing, VCB Maintenance, ACB Maintenance in ERNAKULAM, KERALA. Quantity: 1920. Submission Deadline: 08-09-2025 19: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
VCB bottles testing , VCB Testing , DCRM_HT VCB , DG_IR_DEA_PI , Motors Winding Test , Transformer Testing , WTI Calib_Transformer , Tan Delta_Transformer , PDT_Transformer , SFRA_Transformer , DFRA_Transformer , VLF Test_HT Cable , PDT_HT Cable , Tan Delta_HT Cable , IR_PI_HT Cable , PI_HT Panels , PF Meter_Calib_Test , Insulation Mat testing , IR_PI_LT Cable , RCCB and ELCB Testing , TOLR_EFR Testing , WM_MFM_EM_Testing , AM_VM_FM_Testing , ACB Testing , Thermography of Panesl , Earth Pit Testing , EF Impedence Testing , IR_Switch Board , CI_IR_Busduct , Gloves testing , VCB Maintenance , ACB Maintenance
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
Hindustan Petroleum Corporation Ltd
PATNA, BIHAR
Hindustan Petroleum Corporation Ltd
DHARMAPURI, TAMIL NADU
Hindustan Petroleum Corporation Ltd
HASSAN, KARNATAKA
Hindustan Petroleum Corporation Ltd
KRISHNA, ANDHRA PRADESH
Tender Results
Loading results...
VCB bottles testing
To assess the healthiness and dielectric strength of Vacuum CircuitBreaker (VCB) interrupters (vacuum bottles) using standard testequipment to ensure reliability, safety, and compliance with electricalsafety standards. Following standards shall be referred for Testing-IEC 62271-100.High-voltage switchgear and controlgear, IS/IEC 60934 .Testing of vacuum interrupters, OEM recommendations. Test Equipmentshall be of Reputed make only. The instrument shall be capable ofmeasuring Leakage Current in Micro Amps only, Instrument measuringcurrent in Milli amps shall not be accepted for Testing. ResultInterpretation- Compare measured values with OEM/IEC permissiblelimits, Categorize each interrupter as Healthy / Weak / Defective,Provide recommendation for replacement if any interrupter fails thetest. Documentation Reporting-Record test results for eachinterrupter (contact resistance, timing, leakage current in microA).Submit acomprehensive test report highlighting condition, trends, andrecommendations.Payment shall be made for testing of 1 set. 1 set of VCB 3 Bottles.
VCB Testing
VCB Testing- IR Testing, Contact Resistance Measurement, Breaker Timing Test, Coil Resistance Test.
DCRM_HT VCB
Dynamic contact resistance measurement(DCRM) Testing of HT VCB
DG_IR_DEA_PI
Insulation Resistance Test, Di-Electric Absorption, Polarization Index Testing for DG.Payment shall be made per DG
Motors Winding Test
Motors Winding Test ( Resistance, Inductance and Insulation Resistance Test, Di Electric Absorption, Polarization Index Testing, Vibration Test).Payment shall be made per motor
Transformer Testing
1500 KVA dry type Transformer Testing Insulation resistance test, Polarization test, Magnetizing current test, Magnetic core balance test, Vector group test, Winding resistance Test using 10A Test kit with all Tappings, Turns Ratio)
WTI Calib_Transformer
WTI calibration of 1500 KVA dry type Transformer
Tan Delta_Transformer
Tan Delta Testing of 1500KVA dry type Transformer
PDT_Transformer
Partial discharge testing of 1500KVA dry type Transformer Online PD Testing Mechanical Electrical both (Acoustic Emission (AE) Testing, Electromagnetic Methods-Transient Earth Voltage (TEV) Detection, Ultra High Frequency (UHF) Method.
SFRA_Transformer
(Sweep Frequency Response Analysis) SFRA Testing of 1500KVA dry type Transformer
DFRA_Transformer
(Di-Electric Frequency Response Analysis) DFRA Testing of 1500KVA dry type Transformer
VLF Test_HT Cable
VLF testing of HT cables, 3 Cores in each cable.
PDT_HT Cable
Partial discharge testing of cable 3 Cores in each cable online.
Tan Delta_HT Cable
Tan Delta Testing of HT Cable
IR_PI_HT Cable
Insulation Resistance, Polarization Index Test for HT Cables
PI_HT Panels
Primary Injection Testing of HT Panels & CT Primary Injection Testing of Panels and CT Testing ( Winding Resistance, Insulation Resistance, Polarity, Core Identification, Ratio for all CT Core, Space Heater)
PF Meter_Calib_Test
Testing and Calibration of PF meter installed at panel using Online and Offline Calibration
Insulation Mat testing
Insulation Mat testing (Insulation Resistance, Leakage Current Measurement nano amper and Micro Amper(IS Standard less than10micro Amper), Thickness Measurement.Payment shall be made per mat.
IR_PI_LT Cable
Insulation Resistance, Polarization Index Test for LT Cables
RCCB and ELCB Testing
RCCB/ELCB Testing RCCB AC and A type (Test Current Injection Method 0.5In, xIn, 5Xin, 0d Phase Shift, 180D Phase Shift, Pulzating DC mode)
TOLR_EFR Testing
Thermal overload Relay/Earth Fault Relay Testing
WM_MFM_EM_Testing
Testing of Watt Meter/Multifunction Meter/Energy Meter-The scope involves carrying out on site calibration of various electrical instruments/devices as per line items. Calibration to be done as per IS 1248 or other relevant applicable standards.
AM_VM_FM_Testing
Testing of Amp Meter/Volt Meter/Frequency meter-The scope involves carrying out on site calibration of various electrical instruments/devices as per line items. Calibration to be done as per IS 1248 or other relevant applicable standards.
ACB Testing
ACB Testing (Insulation Resistance, Contact Resistance, Servicing, Protection Test using Secondary Injection)
Thermography of Panesl
Thermography of Panels/Motors(95 Panels and 35 motors) Level-1 & Level-2 Certified Thermographer with NABL Calibration. Thermography to be done once in 6 months for all these panels. Payment of this line item shall be paid per visit. Thermography of all the panels and motors shall be completed in a single visit once in 6 months.
Earth Pit Testing
Earth Pit Testing ( Individual & Grid) -Testing of all the earth pits inside the terminal twice a year (as per the schedule given by HPCL OIC) & submitting reports in duplicate to HPCL Officer In-charge a)Checking the electrode resistance, i.e., the resistances of the grounding pipe itself, after disconnecting with the grid.b) Checking the resistance of the System in grid. Painting of Result and Use of Salt and Charcoal is excluded from the scope
EF Impedence Testing
Earth fault impedance Test for all Final Socket and All distribution boards (L-PE, L-N, L-L Result and MCB Rating Verification) Certified Testing Preffossional
IR_Switch Board
Switch Board IR Test
CI_IR_Busduct
Busduct Contact resistance test and Insulation Resistance test
Gloves testing
Gloves testing LT & HT.Payment shall be made per gloves
VCB Maintenance
VCB Maintenance.Scope includes General Maintenance of VCB, Cleaning of Fixed and Moving Contacts using CRC, Checking of Breaker Rack in Rack out Operation, Checking of closing & Tripping Circuit and others
ACB Maintenance
ACB Maintenance.Scope includes General Maintenance of ACB, Cleaning of Fixed and Moving Contacts using CRC, Checking of Breaker Rack in Rack out Operation, Checking of closing & Tripping Circuit and others
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | VCB bottles testing | To assess the healthiness and dielectric strength of Vacuum CircuitBreaker (VCB) interrupters (vacuum bottles) using standard testequipment to ensure reliability, safety, and compliance with electricalsafety standards. Following standards shall be referred for Testing-IEC 62271-100.High-voltage switchgear and controlgear, IS/IEC 60934 .Testing of vacuum interrupters, OEM recommendations. Test Equipmentshall be of Reputed make only. The instrument shall be capable ofmeasuring Leakage Current in Micro Amps only, Instrument measuringcurrent in Milli amps shall not be accepted for Testing. ResultInterpretation- Compare measured values with OEM/IEC permissiblelimits, Categorize each interrupter as Healthy / Weak / Defective,Provide recommendation for replacement if any interrupter fails thetest. Documentation Reporting-Record test results for eachinterrupter (contact resistance, timing, leakage current in microA).Submit acomprehensive test report highlighting condition, trends, andrecommendations.Payment shall be made for testing of 1 set. 1 set of VCB 3 Bottles. | 1 | each | con555.hpcl.ka | 730 | |
| 2 | VCB Testing | VCB Testing- IR Testing, Contact Resistance Measurement, Breaker Timing Test, Coil Resistance Test. | 2 | each | con555.hpcl.ka | 730 | |
| 3 | DCRM_HT VCB | Dynamic contact resistance measurement(DCRM) Testing of HT VCB | 2 | each | con555.hpcl.ka | 730 | |
| 4 | DG_IR_DEA_PI | Insulation Resistance Test, Di-Electric Absorption, Polarization Index Testing for DG.Payment shall be made per DG | 6 | each | con555.hpcl.ka | 730 | |
| 5 | Motors Winding Test | Motors Winding Test ( Resistance, Inductance and Insulation Resistance Test, Di Electric Absorption, Polarization Index Testing, Vibration Test).Payment shall be made per motor | 74 | each | con555.hpcl.ka | 730 | |
| 6 | Transformer Testing | 1500 KVA dry type Transformer Testing Insulation resistance test, Polarization test, Magnetizing current test, Magnetic core balance test, Vector group test, Winding resistance Test using 10A Test kit with all Tappings, Turns Ratio) | 2 | each | con555.hpcl.ka | 730 | |
| 7 | WTI Calib_Transformer | WTI calibration of 1500 KVA dry type Transformer | 2 | each | con555.hpcl.ka | 730 | |
| 8 | Tan Delta_Transformer | Tan Delta Testing of 1500KVA dry type Transformer | 1 | each | con555.hpcl.ka | 730 | |
| 9 | PDT_Transformer | Partial discharge testing of 1500KVA dry type Transformer Online PD Testing Mechanical Electrical both (Acoustic Emission (AE) Testing, Electromagnetic Methods-Transient Earth Voltage (TEV) Detection, Ultra High Frequency (UHF) Method. | 2 | each | con555.hpcl.ka | 730 | |
| 10 | SFRA_Transformer | (Sweep Frequency Response Analysis) SFRA Testing of 1500KVA dry type Transformer | 2 | each | con555.hpcl.ka | 730 | |
| 11 | DFRA_Transformer | (Di-Electric Frequency Response Analysis) DFRA Testing of 1500KVA dry type Transformer | 2 | each | con555.hpcl.ka | 730 | |
| 12 | VLF Test_HT Cable | VLF testing of HT cables, 3 Cores in each cable. | 4 | each | con555.hpcl.ka | 730 | |
| 13 | PDT_HT Cable | Partial discharge testing of cable 3 Cores in each cable online. | 4 | each | con555.hpcl.ka | 730 | |
| 14 | Tan Delta_HT Cable | Tan Delta Testing of HT Cable | 4 | each | con555.hpcl.ka | 730 | |
| 15 | IR_PI_HT Cable | Insulation Resistance, Polarization Index Test for HT Cables | 4 | each | con555.hpcl.ka | 730 | |
| 16 | PI_HT Panels | Primary Injection Testing of HT Panels & CT Primary Injection Testing of Panels and CT Testing ( Winding Resistance, Insulation Resistance, Polarity, Core Identification, Ratio for all CT Core, Space Heater) | 2 | each | con555.hpcl.ka | 730 | |
| 17 | PF Meter_Calib_Test | Testing and Calibration of PF meter installed at panel using Online and Offline Calibration | 10 | each | con555.hpcl.ka | 730 | |
| 18 | Insulation Mat testing | Insulation Mat testing (Insulation Resistance, Leakage Current Measurement nano amper and Micro Amper(IS Standard less than10micro Amper), Thickness Measurement.Payment shall be made per mat. | 120 | each | con555.hpcl.ka | 730 | |
| 19 | IR_PI_LT Cable | Insulation Resistance, Polarization Index Test for LT Cables | 130 | each | con555.hpcl.ka | 730 | |
| 20 | RCCB and ELCB Testing | RCCB/ELCB Testing RCCB AC and A type (Test Current Injection Method 0.5In, xIn, 5Xin, 0d Phase Shift, 180D Phase Shift, Pulzating DC mode) | 100 | each | con555.hpcl.ka | 730 | |
| 21 | TOLR_EFR Testing | Thermal overload Relay/Earth Fault Relay Testing | 56 | each | con555.hpcl.ka | 730 | |
| 22 | WM_MFM_EM_Testing | Testing of Watt Meter/Multifunction Meter/Energy Meter-The scope involves carrying out on site calibration of various electrical instruments/devices as per line items. Calibration to be done as per IS 1248 or other relevant applicable standards. | 130 | each | con555.hpcl.ka | 730 | |
| 23 | AM_VM_FM_Testing | Testing of Amp Meter/Volt Meter/Frequency meter-The scope involves carrying out on site calibration of various electrical instruments/devices as per line items. Calibration to be done as per IS 1248 or other relevant applicable standards. | 100 | each | con555.hpcl.ka | 730 | |
| 24 | ACB Testing | ACB Testing (Insulation Resistance, Contact Resistance, Servicing, Protection Test using Secondary Injection) | 24 | each | con555.hpcl.ka | 730 | |
| 25 | Thermography of Panesl | Thermography of Panels/Motors(95 Panels and 35 motors) Level-1 & Level-2 Certified Thermographer with NABL Calibration. Thermography to be done once in 6 months for all these panels. Payment of this line item shall be paid per visit. Thermography of all the panels and motors shall be completed in a single visit once in 6 months. | 4 | each | con555.hpcl.ka | 730 | |
| 26 | Earth Pit Testing | Earth Pit Testing ( Individual & Grid) -Testing of all the earth pits inside the terminal twice a year (as per the schedule given by HPCL OIC) & submitting reports in duplicate to HPCL Officer In-charge a)Checking the electrode resistance, i.e., the resistances of the grounding pipe itself, after disconnecting with the grid.b) Checking the resistance of the System in grid. Painting of Result and Use of Salt and Charcoal is excluded from the scope | 1,000 | each | con555.hpcl.ka | 730 | |
| 27 | EF Impedence Testing | Earth fault impedance Test for all Final Socket and All distribution boards (L-PE, L-N, L-L Result and MCB Rating Verification) Certified Testing Preffossional | 60 | each | con555.hpcl.ka | 730 | |
| 28 | IR_Switch Board | Switch Board IR Test | 40 | each | con555.hpcl.ka | 730 | |
| 29 | CI_IR_Busduct | Busduct Contact resistance test and Insulation Resistance test | 2 | each | con555.hpcl.ka | 730 | |
| 30 | Gloves testing | Gloves testing LT & HT.Payment shall be made per gloves | 4 | each | con555.hpcl.ka | 730 | |
| 31 | VCB Maintenance | VCB Maintenance.Scope includes General Maintenance of VCB, Cleaning of Fixed and Moving Contacts using CRC, Checking of Breaker Rack in Rack out Operation, Checking of closing & Tripping Circuit and others | 2 | each | con555.hpcl.ka | 730 | |
| 32 | ACB Maintenance | ACB Maintenance.Scope includes General Maintenance of ACB, Cleaning of Fixed and Moving Contacts using CRC, Checking of Breaker Rack in Rack out Operation, Checking of closing & Tripping Circuit and others | 24 | each | con555.hpcl.ka | 730 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ES TECHNOLOGY Under PMA | - | 06-09-2025 20:34:32 | |
| 2 | LAXMI ASSOCIATES Under PMA | - | 08-09-2025 17:45:23 | |
| 3 | SAFETYELECTRICAL ENGINEERING SERVICES Under PMA | - | 08-09-2025 15:52:52 | |
| 4 | SURESH ELECTRICAL CONTRACTOR Under PMA | - | 08-09-2025 13:44:23 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ES TECHNOLOGY(MSE)( MSE Social Category:General ) Under PMA | Item Categories : VCB bottles testing,VCB Testing,DCRM_HT VCB,DG_IR_DEA_PI,Motors Winding Test,Transformer Testing,WT | |
| L2 | LAXMI ASSOCIATES (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : VCB bottles testing,VCB Testing,DCRM_HT VCB,DG_IR_DEA_PI,Motors Winding Test,Transformer Testing,WT | |
| L3 | SURESH ELECTRICAL CONTRACTOR (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : VCB bottles testing,VCB Testing,DCRM_HT VCB,DG_IR_DEA_PI,Motors Winding Test,Transformer Testing,WT |
Please sign in or create an account to view contract details and download result documents.
Hindustan Petroleum Corporation Ltd
📍 CUDDAPAH, ANDHRA PRADESH
Mumbai Port Trust
📍 MUMBAI, MAHARASHTRA
N/a
📍 DANTEWADA, CHHATTISGARH
Uttar Pradesh Power Corporation Limited (uppcl)
📍 ETAH, UTTAR PRADESH
Science And Technology Department
📍 SHEIKHPURA, BIHAR
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS