TenderDekho Logo
GEM

Procurement Opportunity: AMC of 33KV HT AVR,Dehydration and filteration of transformer oil,Draining of Oil,Replacing of Oil in SOUTH GOA, GOA

Bid Publish Date

30-May-2025, 5:58 pm

Bid End Date

08-Jul-2025, 9:00 am

EMD

₹39,179

Progress

Issue30-May-2025, 5:58 pm
Technical19-06-2025 18:29:18
Financial
Award25-Sep-2025, 12:31 am
Explore all 5 tabs to view complete tender details

Quantity

410

Categories 39

Airports Authority Of India has released a public tender for AMC of 33KV HT AVR, Dehydration and filteration of transformer oil, Draining of Oil, Replacing of Oil seals and Gaskets, Filling back drained oil, Draining of Oil of CT, Draining of Oil of PT, Hydra for Replacing the Carbon Rollers, Micro switch, Carbon roller, Tag and tail, RC Network, AVR PCB 1002_3 Relay Card, AC Step Synchronous motor, Silica Gel, 24V DC Closing coil, 24V DC Trippling coil, Numeric Type Over current and Earth fault Relay, Power Pack Unit, 33 KV Indoor type CT, 33KV Indoor resin cast PT, 33KV Outdoor PT, 33KV Outdoor CT, 33 KV Indoor type PT fuse, transformer oil, Aux. Contactor - CC, Aux. Contactor - AC, Aux. Contactor - CLS, 33KV 250 Amps HT bushing, 1. 1 KV 2000 Amps Epoxy bushing, 1. 1 KV 630 Amps LT bushing, 33KV 250 Amps Oil seal, 1. 1 KV 630 Amps Oil seal in SOUTH GOA, GOA. Quantity: 410. Submission Deadline: 08-07-2025 09: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

AMC of 33KV HT AVR , Dehydration and filteration of transformer oil , Draining of Oil , Replacing of Oil seals and Gaskets , Filling back drained oil , Draining of Oil of CT , Draining of Oil of PT , Hydra for Replacing the Carbon Rollers , Micro switch , Carbon roller , Tag and tail , RC Network , AVR PCB 1002_3 Relay Card , AC Step Synchronous motor , Silica Gel , 24V DC Closing coil , 24V DC Trippling coil , Numeric Type Over current and Earth fault Relay , Power Pack Unit , 33 KV Indoor type CT , 33KV Indoor resin cast PT , 33KV Outdoor PT , 33KV Outdoor CT , 33 KV Indoor type PT fuse , transformer oil , Aux. Contactor - CC , Aux. Contactor - AC , Aux. Contactor - CLS , 33KV 250 Amps HT bushing , 1.1 KV 2000 Amps Epoxy bushing , 1.1 KV 630 Amps LT bushing , 33KV 250 Amps Oil seal , 1.1 KV 630 Amps Oil seal

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7907510.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 33 Items Sign in for GEM prices

#1

AMC of 33KV HT AVR

As per specification document , Schedule of Quantity , Item No 1 at page-167

8 quarterly Delivery: 730 days
#2

Dehydration and filteration of transformer oil

As per specification document , Schedule of Quantity , Item No 2 at page-167

6 job Delivery: 730 days
#3

Draining of Oil

As per specification document , Schedule of Quantity , Item No 3 at page-167

2 job Delivery: 730 days
#4

Replacing of Oil seals and Gaskets

As per specification document , Schedule of Quantity , Item No 4 at page-167

2 job Delivery: 730 days
#5

Filling back drained oil

As per specification document , Schedule of Quantity , Item No 5 at page-167

2 job Delivery: 730 days
#6

Draining of Oil of CT

As per specification document , Schedule of Quantity , Item No 6 at page-167

1 job Delivery: 730 days
#7

Draining of Oil of PT

As per specification document , Schedule of Quantity , Item No 7 at page-167

1 job Delivery: 730 days
#8

Hydra for Replacing the Carbon Rollers

As per specification document , Schedule of Quantity , Item No 8 at page-167

2 job Delivery: 730 days
#9

Micro switch

As per specification document , Schedule of Quantity , Item No 9.1 at page-168

4 nos Delivery: 730 days
#10

Carbon roller

As per specification document , Schedule of Quantity , Item No 9.2 at page-168

48 nos Delivery: 730 days
#11

Tag and tail

As per specification document , Schedule of Quantity , Item No 9.3 at page-168

48 nos Delivery: 730 days
#12

RC Network

As per specification document , Schedule of Quantity , Item No 9.4 at page-168

1 nos Delivery: 730 days
#13

AVR PCB 1002_3 Relay Card

As per specification document , Schedule of Quantity , Item No 9.5 at page-168

2 nos Delivery: 730 days
#14

AC Step Synchronous motor

As per specification document , Schedule of Quantity , Item No 9.6 at page-168

2 nos Delivery: 730 days
#15

Silica Gel

As per specification document , Schedule of Quantity , Item No 9.7 at page-168

20 nos Delivery: 730 days
#16

24V DC Closing coil

As per specification document , Schedule of Quantity , Item No 9.8 at page-168

4 kg Delivery: 730 days
#17

24V DC Trippling coil

As per specification document , Schedule of Quantity , Item No 9.9 at page-168

4 nos Delivery: 730 days
#18

Numeric Type Over current and Earth fault Relay

As per specification document , Schedule of Quantity , Item No 9.10 at page-168

2 nos Delivery: 730 days
#19

Power Pack Unit

As per specification document , Schedule of Quantity , Item No 9.11 at page-168

2 nos Delivery: 730 days
#20

33 KV Indoor type CT

As per specification document , Schedule of Quantity , Item No 9.12 at page-168

2 each Delivery: 730 days
#21

33KV Indoor resin cast PT

As per specification document , Schedule of Quantity , Item No 9.13 at page-168

2 each Delivery: 730 days
#22

33KV Outdoor PT

As per specification document , Schedule of Quantity , Item No 9.14 at page-168

1 each Delivery: 730 days
#23

33KV Outdoor CT

As per specification document , Schedule of Quantity , Item No 9.15 at page-169

1 each Delivery: 730 days
#24

33 KV Indoor type PT fuse

As per specification document , Schedule of Quantity , Item No 9.16 at page-169

3 each Delivery: 730 days
#25

transformer oil

As per specification document , Schedule of Quantity , Item No 9.17 at page-169

200 ltr Delivery: 730 days
#26

Aux. Contactor - CC

As per specification document , Schedule of Quantity , Item No 9.18 at page-169

1 no Delivery: 730 days
#27

Aux. Contactor - AC

As per specification document , Schedule of Quantity , Item No 9.19 at page-169

1 no Delivery: 730 days
#28

Aux. Contactor - CLS

As per specification document , Schedule of Quantity , Item No 9.20 at page-169

1 no Delivery: 730 days
#29

33KV 250 Amps HT bushing

As per specification document , Schedule of Quantity , Item No 9.21 at page-169

6 nos Delivery: 730 days
#30

1.1 KV 2000 Amps Epoxy bushing

As per specification document , Schedule of Quantity , Item No 9.22 at page-169

2 nos Delivery: 730 days
#31

1.1 KV 630 Amps LT bushing

As per specification document , Schedule of Quantity , Item No 9.23 at page-169

3 nos Delivery: 730 days
#32

33KV 250 Amps Oil seal

As per specification document , Schedule of Quantity , Item No 9.24 at page-169

16 nos Delivery: 730 days
#33

1.1 KV 630 Amps Oil seal

As per specification document , Schedule of Quantity , Item No 9.25 at page-169

10 nos Delivery: 730 days

Corrigendum Updates

1 Update
#1

Update

27-Jun-2025

Technical Results

S.No Seller Item Date Status
1
HLP SOLUTION   Under PMA
-19-06-2025 18:29:18
2
MACH ENTERPRISES   Under PMA
-07-07-2025 21:08:00

Financial Results

Rank Seller Price Item
L1
MACH ENTERPRISES(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : AMC of 33KV HT AVR,Dehydration and filteration of transformer oil,Draining of Oil,Replacing of Oil
L2
HLP SOLUTION (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : AMC of 33KV HT AVR,Dehydration and filteration of transformer oil,Draining of Oil,Replacing of Oil

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about GOA tender market

What are the eligibility requirements for AMC of 2 Nos 33KV HT AVRs at Goa Airport?

The eligibility requirements include being a registered entity with appropriate authorities, compliance with statutory requirements, and demonstrated experience in similar maintenance contracts in the electrical domain. Bidders must also show that they comply with the MSE and startup provisions that encourage diverse participation.

What technical certificates are required for the AMC of 2 Nos 33KV HT AVRs?

Bidders must provide evidence of technical certifications related to the maintenance of high-tension electrical equipment, along with proof of trained personnel. These certifications should demonstrate the bidder's alignment with industry quality standards and compliance with all relevant regulations.

What is the registration process for participating in the AMC of 2 Nos 33KV HT AVRs tender?

To participate in the tender process, bidders must register on the designated government e-procurement portal. This includes completing the necessary forms, uploading required documents, and ensuring all information is accurate to facilitate the evaluation process.

What are the financial and performance security requirements for the AMC of 2 Nos 33KV HT AVRs?

Bidders are required to submit an Earnest Money Deposit (EMD) along with their bid to ensure seriousness in the proposal. Furthermore, a performance security may also be required upon awarding of the contract, which ensures compliance with the delivery and maintenance terms laid out in the tender documentation.

What are the benefits for MSEs participating in the AMC of 2 Nos 33KV HT AVRs?

MSEs are afforded special provisions within this tender, including potential price preferences and relaxations on certain eligibility criteria. Compliance with 'Make in India' policies is encouraged, promoting local content and procurement rules aimed at supporting smaller enterprises in government contracts.