Panchayati Raj Department Bihar RO Plant with Genset and Trolley Tender 2026

Bid Publish Date

28-Sep-2026, 8:49 am

Bid End Date

12-Oct-2026, 9:00 am

Location

Generate Docs

Progress

Issue28-Sep-2026, 8:49 am
Corrigendum08-Oct-2026
AwardPending

Key Highlights

  • • Panchayati Raj Department Bihar procurement for RO Plant with Genset and Trolley
  • • 25% quantity flex and prorated extension during contract execution
  • • 3-year OEM warranty and on-site installation/commissioning requirements
  • • Functional in-state service centres with 30-day establishment timeline

Tender Overview

Panchayati Raj Department, Bihar invites bids for the procurement of a RO Plant with Genset and Trolley. The contract covers supply, installation, testing and commissioning at the consignee location with a 3-year OEM warranty. The scope includes on-site setup, training, and post-installation service; bidders must demonstrate functional in-state service centers and toll-free service support. A 25% quantity flex is allowed during contract execution, with delivery timelines linked to the original and extended periods. Unique clauses require escalation matrices and documented evidence of service capability within India. This procurement targets rural water infrastructure enhancement in Bihar under government MIS channels and safeguards quality through mandatory warranty and service commitments.

Key Specifications

  • RO Plant with Genset and trolley as per BOQ (no detailed specs provided)

  • 3-year OEM warranty with post-installation support

  • In-state service centres and toll-free support required

  • Delivery, installation, testing and commissioning included in scope

  • Option to increase quantity up to 25% with adjusted delivery time

Terms & Conditions

  • Delivery period linked to original and extended orders with 30-day minimum extension

  • 25% quantity variation allowed during contract and currency

  • Mandatory service centre presence in Bihar with 30-day establishment window

  • 3-year warranty from final acceptance; OEM certificates required at delivery

  • Dedicated toll-free service support and escalation matrix

Important Clauses

Payment Terms

Payment terms to be detailed in ATC; ensure alignment with delivery/installation milestones and acceptance testing

Delivery Schedule

Delivery commences from last date of original delivery order; additional time calculated with minimum 30 days extension

Penalties/Liquidated Damages

The ATC may include LDs for delays beyond agreed delivery; exact percentages to be confirmed in the contract

Bidder Eligibility

  • Not under liquidation or bankruptcy; upholds financial standing

  • Demonstrated experience in RO plant installations or similar water treatment equipment

  • Must provide evidence of in-state service capability or a plan to establish within 30 days

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

20

Past Performance

50 %

Warranty Period

3 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

RO Plant with Genset and Trolley (Q3)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Purnia

Delivery Pincodes

854330

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sanjay Kumar Arya854330,PANCHAYAT MALHARIYA BLOCK KASBAPurniaBihar854330115-

Authority Records

PANCHAYAT RAJ DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9953711.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Panchyat Malhariya Kasba Purnea

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

08-Oct-2026

Extended Deadline

12-Oct-2026, 3:30 am

Opening Date

13-Oct-2026, 3:30 am

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates of similar RO plant installations

4

Financial statements for last 3 years

5

EMD/Security deposit as per ATC (amount not specified in data)

6

OEM authorization / principal manufacturer certificate (if applicable)

7

Technical bid documents showing compliance with RO plant + Genset configuration

8

Details of functional Service Centre in Bihar (or plan to establish within 30 days)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for the RO plant tender in Bihar 2026 with Genset?

To bid, submit GST, PAN, experience certificates, financials, and EMD as per ATC. Include OEM authorization if required and show a functional service centre in Bihar or plan to establish within 30 days. Ensure installation, testing and commissioning are included in scope and warranty is 3 years.

What documents are required for RO plant procurement in Bihar?

Required documents include GST certificate, PAN card, last 3 years financial statements, experience certificates for similar installations, OEM authorization, technical bid detailing RO plant with genset, service network proof, and EMD submission as per ATC. Ensure installation & commission plan is attached.

What is the warranty period for the RO plant with Genset?

The tender requires a 3-year OEM warranty from final acceptance or after installation, whichever is later. OEM warranty certificates must be submitted at delivery, and the seller must address breakdowns during the warranty period with established service capability in India.

What are the delivery extension rules for quantity changes?

Quantity may be increased/decreased by up to 25% during contract and currency. Delivery time escalates proportionally using the formula (additional quantity/original quantity) × original delivery period, with a minimum extension of 30 days unless the original period is longer.

Are service centers required in Bihar for on-site warranty?

Yes. If carry-in warranty applies, the bidder must have a functional service centre in Bihar; if not in place, establish one within 30 days of award. Payment is contingent on documentary proof of the service centre.

What are the payment and installation requirements in this bid?

Payment terms will be detailed in ATC; scope includes supply, installation, testing and commissioning. Ensure on-site installation and training are included, with acceptance testing performed before final payment. Provide escalation matrix and toll-free service details for after-sales support.

What standards or certifications are required for the RO plant in Bihar?

The tender specifies OEM warranties and in-state service capability; look for IS/ISO standards in ATC. Ensure RO plant and genset meet applicable safety and performance requirements, with installation certificates and technical compliance documents available at delivery.

How to demonstrate eligibility for Bihar RO plant procurement?

Demonstrate financial stability, non-liquidation status, and relevant project experience in water treatment equipment. Provide service network details, in-state presence or a concrete plan to establish a local centre within 30 days, and evidence of prior similar installations with references.