TenderDekho Logo
Active GEM

Indian Army PVC Thermal Insulated Panel for CMD Post Flooring Tender Ambala Haryana 2026

Bid Publish Date

12-Oct-2026, 6:49 pm

Bid End Date

22-Oct-2026, 7:00 pm

Progress

Issue12-Oct-2026, 6:49 pm
AwardPending

Tender Overview

The opportunity is issued by the Indian Army (Department of Military Affairs) for supplying and installing PVC THERMAL INSULATED PANEL FOR CMD POST FLOORING WITH LABOUR CHARGES at Ambala, Haryana 133001. The tender contemplates a supply and labor package, with an option to adjust quantities up to 25% during and after contracting, and a delivery framework tied to original delivery timelines. Bidders must provide evidence of non-blacklisted status and non-suspension by GEM, along with a sample lot post-L1 evaluation. The BOQ currently shows 0 items, signaling a potentially non-standard or project-level procurement with emphasis on material and labor integration.

Technical Specifications & Requirements

  • Product: PVC thermal insulated panel for CMD post flooring, including labour charges
  • Location: Ambala, Haryana
  • Quantity/Scope: 25% quantity option on both initial contract and during currency; actual quantities TBD at order placement
  • Delivery terms: Delivery period linked to the original delivery order date; extended-period calculations apply with a minimum 30 days
  • Documentation: Include non-blacklisted certificate, GEM suspension status certificate, and item sample after L-1 evaluation
  • Clauses: Supplier must comply with option-clause delivery timing and related calculations; bid evaluation to consider 25% quantity flex

Terms, Conditions & Eligibility

  • EMD: Not disclosed in available data; ensure readiness to meet agency requirements when published
  • Eligibility: Provide certificates confirming non-blacklisted status and non-suspension by GEM
  • Sample submission: Item sample to be provided post-L1 evaluation
  • Delivery: Adhere to original delivery date; extended delivery time computed as (additional quantity / original quantity) × original delivery period, minimum 30 days
  • Documentation: Submit GST, PAN, financial statements, and technical compliance as part of bid package when requested
  • Rights: Purchaser reserves quantity variation rights up to 25% and staged extension under contract terms

Key Specifications

  • Product/service names: PVC thermal insulated panel for CMD post flooring with labour charges

  • Location/Scope: Ambala, Haryana; labour-inclusive flooring solution

  • Estimated value: Not disclosed in available data

  • Delivery terms: Original delivery period; option-based extension with 30-day minimum

  • Experience/Compliance: Non-blacklisted status and GEM suspension status

Terms & Conditions

  • Quantity variation up to 25% at contract placement and during currency

  • Delivery period adjustments based on option clause with minimum 30 days

  • Submission of non-blacklist and GEM suspension certificates along with L-1 sample

Important Clauses

Option Clause

Purchaser may increase/decrease bid quantity up to 25% at contract placement and during currency, with adjusted delivery time calculations.

Sample Submission

Bidder must submit item samples after L-1 evaluation as part of bid acceptance process.

Delivery Time Calculation

Additional delivery time = (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.

Bidder Eligibility

  • Evidence of non-blacklisted status from the bidder

  • Certification of non-suspension by GEM

  • Ability to provide PVC thermal insulated panel flooring with labour under a single contract

  • Compliance with standard procurement documentation (GST, PAN, financials)

Advertisement

Tender Data

Bid Details

Quantity

150

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

PVC THERMAL INSULATED PANEL FOR COMD POST FLOORING WITH LABOUR CHARGES

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Ambala

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AmbalaAmbala--15015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10024019.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing relevant supply/installations

4

Financial statements (audited if available)

5

EMD/Security deposit documents (as applicable by tender terms)

6

Technical bid documents and compliance certificates

7

OEM authorization or manufacturer certifications (if applicable)

8

Certificate regarding non-blacklisted firm

9

Certificate regarding non suspended by GEM

10

Sample of items after L-1 evaluation

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid on the PVC panel flooring tender in Ambala?

Submit non-blacklisted and GEM suspension certificates, along with item samples after L-1 evaluation. Include GST, PAN, financials, and technical compliance. Ensure labour charges are included and confirm PVC thermal insulated panel specs for CMD post flooring.

What documents are required for the Indian Army PVC panel bid in Ambala?

Provide GST registration, PAN card, experience certificates, financial statements, EMD documents, technical bid, OEM authorizations if required, and the non-blacklisted plus non-suspension certificates from GEM, plus sample after L-1.

What are the delivery terms for quantity variation in this tender?

The Purchaser may increase/decrease quantity up to 25% at contract placement and during currency. Delivery timing is recalculated using (additional quantity ÷ original quantity) × original delivery period, with a minimum 30 days.

What standards or certifications are demanded for PVC panel flooring?

Tender requires PVC thermal insulated panel with labour; bidders should confirm compliance with project-specific quality controls and provide applicable certifications as part of technical bid and OEM authorizations if applicable.

When is the sample submission required for the CMD post flooring bid?

Samples must be provided after L-1 evaluation as part of the bid acceptance process; ensure the sample matches PVC insulated panel specifications for CMD post flooring with labour.

What is the scope of labour charges in this Ambala tender?

The contract scope explicitly includes labour charges for CMD post flooring using PVC thermal insulated panels, requiring seamless integration of material supply and skilled labor in a single bid package.

What eligibility criteria must bidders meet for this Army tender?

Bidders must be non-blacklisted, not suspended by GEM, and capable of supplying PVC insulated flooring panels with labour; provide GST, PAN, experience certificates, financials, and technical compliance with the bid.

What are the key delivery-related terms bidders should plan for?

Plan to deliver by the original delivery date with potential extensions under the option clause; extended delivery time is calculated and minimum 30 days; ensure readiness for quantity adjustments up to 25%.

Advertisement