DING DONG BELL,FRLS PVC INSULATED COPPER WIRE 1 POINT 5 SQ MM MAKE POLYCAB OR ITS EQUIVALENT,FRLS P
N/a
Bid Publish Date
29-Jan-2026, 5:07 pm
Bid End Date
28-Feb-2026, 3:00 pm
Value
₹4,40,694
Location
Progress
Quantity
4
Category
PUMP MEDANA CH1 LC-603-5/E/E/10T-07 or Equivalent
Bid Type
Single Packet Bid
SPMCIL (Security Printing And Minting Corporation Of India Limited) invites bids for pump procurement in Dewas, Madhya Pradesh (455001). The scope covers multiple PUMP MEDANA variants: CH1 LC-603-5/E/E/10T-07 or Equivalent, CH1 LC-206-5/E/E/10T/M111 or Equivalent, and CH1 LC-606-5/E/E/10T/M111 or Equivalent. The estimated value is ₹440,694 with a flexible quantity option of ±25% at contract and during the currency of the contract. A delivery timeline will be calculated from the last date of the original delivery order, with a minimum extension of 30 days. The response requires adherence to GeM/GIT and GCC, and RTGS payment on completion of user verification. A unique differentiator is the explicit option clause for quantity variation and contract extension.
Product family: MEDANA CH1 pumps (LC-603-5/E/E/10T-07, LC-206-5/E/E/10T/M111, LC-606-5/E/E/10T/M111) or equivalent
Estimated contract value: ₹440,694
Delivery flexibility: 25% quantity variation during contract
Payment method: RTGS post-satisfactory user verification
LD penalties: 0.5% per week up to 10% of contract value
GST compliance: timely GST returns required; non-compliance may delay payments
GIT & GCC undertakings required; GIT/GCC terms prevail over GeM terms
Qty variation up to 25% at contract signing and during currency
100% RTGS payment after user department's satisfactory report
LD penalties capped at 10% for delayed delivery
100% payment via RTGS after satisfactory report and submission of required documents
Delivery period calculated from last date of original delivery order; extended delivery time follows a formula with a minimum 30 days
LD at 0.5% of delayed goods' price per week, max 10% of contract price
Experience in supplying pumping equipment or equivalent mechanical devices
Demonstrable turnover suitable to support contract value
Compliance with GST, PAN, and necessary tax documentation
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for prior pump supply
Financial statements / turnover proof
EMD documentation (amount not disclosed in data)
Technical bid documents demonstrating pump model compatibility
OEM authorization / authorization letters for the specified MEDANA CH1 variants
Bank details for RTGS payments (Beneficiary name, Account number, IFSC, Branch)
Key insights about MADHYA PRADESH tender market
Bidders should prepare GST registration, PAN, and financial statements, plus OEM authorizations for CH1 MEDANA models. Submit RTGS-ready invoices and bank details. Ensure compliance with GIT/GCC, review LD and quantity variation terms, and deliver proof of prior pump experience to qualify.
Required submissions include GST certificate, PAN, experience certificates for pumping equipment, financial statements, and OEM authorization for CH1 variants. Include RTGS-friendly bank details, and technical bid documents demonstrating model compatibility with CH1 LC-603-5/LC-206-5/LC-606-5.
Specific performance specs are not provided; bidders must align with standard pump capabilities and OEM specifications for CH1 MEDANA variants. Provide model equivalence to CH1 LC-603-5/E/E/10T-07, LC-206-5/E/E/10T/M111, or LC-606-5/E/E/10T/M111 with equivalent performance ratings.
Payment is released through RTGS after the user department's satisfactory report and submission of all required documents. Ensure your invoice includes beneficiary name, account number, IFSC, and branch details for seamless processing.
Delayed delivery incurs LD at 0.5% per week of the delivered price, with a maximum deduction of 10% of the contract price. Ensure timely delivery and provide contingency plans for extension scenarios under the option clause.
The purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during currency. Delivery time adjusts using the specified formula with a minimum of 30 days extension, ensuring continuity of supply.
Yes. Timely GST returns are required; non-compliance may lead to payment withholding. Prepare GST compliance documents and maintain ongoing filings to avoid disruptions in payments for outward supplies.
Bidders must undertake GIT & GCC undertakings and accept the prevailing SPMCIL terms. Review the linked GIT and GCC documents and ensure alignment with the tender’s terms, including payment, delivery, and performance obligations.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS