Bid Publish Date
07-Oct-2026, 5:01 pm
Bid End Date
17-Oct-2026, 6:00 pm
Location
Progress
Hindustan Petroleum Corporation Ltd invites bids for the SITC of Bottom Loading, Bottom Vapor Recovery Arm, and ** RMU** equipment at HPCL facilities in Indore, Madhya Pradesh. The tender scope includes installation-type procurement with multiple equipment categories, referenced under the organization’s energy and gas handling portfolio. The estimated quantity is not disclosed, and there is no BOQ item data published. The tender allows quantity variation up to 25% during order placement and during currency, with delivery timelines tied to the original order’s last delivery date. Bidders must align with HPCL GTC terms and vendor-specific ATCs. This opportunity targets suppliers capable of end-to-end SITC execution in a high‑altitude, industrial gas handling context, with adherence to HPCL’s standard contract framework and risk controls.
Product/service names: Bottom Loading equipment, Bottom Vapor Recovery Arm, RMU assemblies
Quantities: Not disclosed in public data; subject to 25% variation
Estimated value: Not specified in tender data
Experience requirements: Prior SITC of gas handling infrastructure recommended
Quality/standards: HPCL GTC compliance; HPCL ATC attachments to be followed
EMD not specified in public data; bidders must verify in procurement docs
Delivery periods linked to original order last delivery date with extensions
Bills raised in consignee name; HPCL GTC controls contract terms
Payments governed by HPCL GTC; ensure GST compliance and appropriate bid security as per ATC.
Delivery period commences from the last date of original delivery order; extended time formula applies with minimum 30 days.
HPCL may terminate or impose remedies for non-performance, delayed delivery, or misrepresentation.
Experience in SITC of gas handling equipment or RMU installations
Demonstrated financial stability and GST compliance
Capability to comply with HPCL GTC and tender attachments
Quantity
7
Category
SITC of Bottom Loading
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
696
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SITC of Bottom Loading , SITC of Bottom Vapor Recovery Arm , SITC of RMU
Advisory Bank
ICICI
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
112
Delivery Locations
1
Delivery Cities
Indore
Delivery Pincodes
453771
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Umesh Chandra Saxena | 453771,HPCL, Indore New IRD, Sanwer Road , Village Manglia , Dist . Indore , MP 453771 | Indore | Madhya Pradesh | 453771 | 2 | 112 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate and GSTIN of supply location
PAN card
Experience certificates in SITC of similar equipment
Financial statements or turnover proof
EMD/Security document as applicable by HPCL
Technical bid documents and compliance certificates
OEM authorizations (if applicable)
HPCL GST declaration and Relatives declarations (as required)
Key insights about MADHYA PRADESH tender market
Bidders should review HPCL GTC and tender attachments, submit GST and PAN, provide financials and experience certificates, and upload OEM authorizations if required. The bid may include ±25% quantity variations and a delivery timeline tied to the original order. Ensure consignee naming and ATC compliance for HPCL.
Required documents include GST registration and GSTIN, PAN card, experience certificates for SITC projects, financial statements, EMD/Security as applicable, technical bid documents, OEM authorizations, and HPCL GST declarations plus Relatives declarations as specified in tender attachments.
Delivery starts from the last date of the original delivery order. If options are exercised, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days and HPCL GTC governing terms.
Compliance with HPCL GTC is mandatory; procurements require HPCL ATC attachments, GST compliance, and vendor declarations. Specific ISI/ISO standards are not listed in public data; refer to tender documents for exact certifications.
Payment terms follow HPCL GTC guidelines; bidders must provide required financial documentation and bid security. Bills are to be raised in the consignee’s name, with payments processed per HPCL contractual terms and applicable GST requirements.
Scope includes installation and commissioning of Bottom Loading equipment, Bottom Vapor Recovery Arm, and RMU assemblies as part of HPCL infrastructure. Exact technical interfaces and performance criteria are in tender attachments and must be followed by bidders.
Eligible bidders should demonstrate experience in similar SITC projects, maintain GST compliance, and provide financial statements. OEM authorizations may be required; consult tender attachments for organization-specific eligibility and declaring related-party information as per HPCL ATC.
Refer to HPCL GTC and tender attachments for delivery timelines, option clause details, and acceptance criteria. The approved supplier must align with consignee details and HPCL’s contract framework; non-compliance may lead to contract termination.