Long Cloth Cotton Khadi as per IS 3771
Northern Railway
LUCKNOW, UTTAR PRADESH
Bid Publish Date
08-Jun-2026, 12:44 pm
Bid End Date
23-Jun-2026, 11:00 am
Location
Progress
Quantity
13170
Bid Type
Single Packet Bid
The opportunity is with Northern Railway (Indian Railways) for Long Cloth Cotton Khadi IS 3771 (Q1) PAC Only. Key requirements include colour fastness to light per IS 2454 (latest) and washing fastness with colour change/staining, plus mandatory NABL/ILAC accredited or Central Government Lab test reports confirming conformity. The supplier must provide advance samples for buyer approval before bulk manufacture and comply with KVIC procurement constraints. Pre-dispatch inspection is required by RITES at the manufacturerโs premises, with KVIC Mumbai coordinating quantity distribution post award. The contract includes a 25% quantity variation option and a phased delivery framework, emphasizing specific quality and approval milestones. This tender emphasizes Khadi fabric standards, NABL testing, and advance sampling to ensure spec compliance and timely delivery.
Product/service: Long Cloth Cotton Khadi IS 3771 (Q1) PAC Only
Color: specified colour with IS 2454 colour fastness to light
Testing: NABL/ILAC accredited or Central Government Lab conformity report
Advance samples: 5 samples within 15 days of award; buyer approval required
Inspection: pre-dispatch by RITES; KVIC coordination for quantity distribution
Option clause: ยฑ25% quantity variation; delivery period adjusted with formula
EMD amount not listed; follow KVIC/Railways guidance for deposit
Delivery schedule governed by option clause; minimum 30 days extension
Sample approvals required before bulk manufacturing; possible contract termination for non-conformance
Not explicitly provided; follow standard KVIC/Railways advance payment and security deposit norms
Delivery period commences from last date of original delivery order; modified by option clause with min 30 days
Deviations from contract specs may lead to rejection, termination, or penalties as per tender conditions
Experience in supplying Khadi long cloth and KVIC-accredited sourcing
Valid GST and PAN; financial stability demonstrated via statements
Ability to provide NABL/ILAC accredited test reports and IS 3771 (Q1) compliance
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Long Cloth Cotton Khadi as per IS 3771 (Q1) ( PAC Only )
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
OTHER
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Northern Railway
LUCKNOW, UTTAR PRADESH
South East Central Railway
Modern Coach Factory Raebareli
Diesel Loco Modernisation Works
PATIALA, PUNJAB
Rail Coach Factory Kapurthala
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| COLOUR | Colour | Bleached |
| COLOUR | Colour Fastness to Light ( as per IS 2454 latest ) | not applicable for bleached |
| COLOUR | Colour fastness to Washing- Change in colour and staining on adjacent fabric | not applicable for bleached |
| TEST REPORT | Availability of Test Report from NABL/ ILAC accredited or Central Government Lab to prove conformity of products to the specification. | Yes, No |
| ADVANCE SAMPLE | Agree to provide Advance Sample(s) for buyer's approval before commencement of supply | Yes, No, Not applicable |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates in Khadi fabric procurement
Financial statements (minimum last 2 financial years)
EMD/Security deposit proof as specified by KVIC/Railways
Technical compliance certificates for IS 3771 (Q1) and NABL test reports
OEM authorizations or KVIC accreditation documents
Advance sample submission documentation and approval records
Bidders must submit GST, PAN, financials, and experience certificates; provide NABL/ILAC lab test reports proving IS 3771 compliance, and advance samples (5 units) within 15 days of award. Ensure RITES pre-dispatch inspection readiness and KVIC coordination for quantity distribution. Follow KVIC procurement rules and option clause for quantity variation, with 25% additional quantities allowed.
Required documents include GST certificate, PAN, two years financials, experience certificates in Khadi/fabric supply, NABL/ILAC test reports, IS 3771 conformity documents, and OEM or KVIC authorizations. Also include advance sample submission records and EMD proof as per buyer terms.
Specifications mandate cotton Khadi long cloth per IS 3771 (Q1) PAC; colour fastness to light per IS 2454 latest; washing fastness tests for colour change and staining; NABL/ILAC or Central Lab proof of conformity; advance sample prior to bulk production.
Exact EMD amount is not stated; bidders should follow the standard KVIC/Railways guidance for security deposits and ensure it is provided as per tender terms alongside GST and PAN details.
Advance samples: 5 units must be submitted within 15 days of contract award. Buyer will approve or request modifications within 15 days; failure to conform may lead to termination or re-sampling.
The purchaser reserves the right to increase/decrease quantity up to 25% of bid quantity at contract placement and during the contract currency at contracted rates; delivery period adjusts accordingly with a minimum 30-day extension.
South East Central Railway
South Central Railway
Kolkata Port Trust
Munitions India Limited
๐ BALANGIR, ODISHA
Border Security Force (bsf)
๐ KAMRUP, ASSAM
Sign up now to access all documents
Main Document
OTHER
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS