Rural Development Department Bihar Drinking Water ATM Tender Samastipur 2026 - ISI/AAA/TRTL Compliant Water Vending Machine Year 2026
Rural Development Department
SAMASTIPUR, BIHAR
Madhepura District Panchayats, under the Department of Panchayati Raj, seeks supply and commissioning of a Drinking Water ATM / Water Vending Machine (Version 2). Estimated value is ₹500,000 with no published EMD amount. The project targets a single location in Bihar’s rural administration, requiring a comprehensive water vending system capable of coin, card, RFID/NFC, and mobile wallet payments. Key differentiators include integrated purification with RO/UV, in-built chiller to maintain ~15°C, and a robust enclosure with anti-skid flooring. The tender emphasizes on-site trial, installation, and training, with mandatory test reports from NABL/ILAC-recognized labs. This project aligns with rural drinking water initiatives and aims for safe, traceable dispense at municipal or panchayat-level kiosks. Unique aspects include real-time water quality display, multiple filtration stages, and a vendor’s ability to demonstrate a turnkey solution from raw water intake through treated water storage to dispenser. bidders should assess site suitability and ensure compliance with stated enclosure and power requirements.
Water ATM with multi-payment acceptance: coin, card, RFID/NFC, and mobile wallet
Purification system: RO + UV with anti-scalant dosing and pH correction dosing pumps
Chiller capacity enabling ~15°C output water
Raw and treated water storage with specified material construction and capacity
In-built CIP tank and UV system with specified lamp count and total UV power
Display: backlit touch screen showing TDS, pH, temperature; 20+ character x 2+ line display
Option to increase/decrease quantity up to 25% during contract
Payment terms aligned to delivery milestones; e-payment via bank mandate
Trial run and training included; NABL/ILAC test reports on demand
Government terms likely apply; provide bank mandate for e-payment and milestone-based payments.
Delivery period extends from last date of original delivery order; minimum 30 days extension if option exercised.
Penalties for non-conformance or delayed delivery; performance bonds may apply per contract terms.
Local service capability and prior experience with drinking water kiosks
Compliance with IS/ISO standards; ISO 9001 if specified
Evidence of NABL/ILAC test report availability or ability to procure
Rural Development Department
SAMASTIPUR, BIHAR
Rural Development Department
SAMASTIPUR, BIHAR
Rural Development Department
SAMASTIPUR, BIHAR
Panchayati Raj Department
BEGUSARAI, BIHAR
Indian Army
JALANDHAR, PUNJAB
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Coin / Card Acceptor / Quantity of Dispensing Water | Number of Dispensing points | 3, 4, 5, 6 Or higher |
| Coin / Card Acceptor / Quantity of Dispensing Water | Water Dispensing using coin acceptor | Yes |
| Coin / Card Acceptor / Quantity of Dispensing Water | Coins accepted for payment | Re.1, Rs. 2, Rs. 5, Rs.10 |
| Coin / Card Acceptor / Quantity of Dispensing Water | Water Dispensing using RFID/NFC card | No |
| Coin / Card Acceptor / Quantity of Dispensing Water | Mobile Wallet accepted for payment | Yes |
| CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY | Purification Capacity of Water ATM (LPH) | 100, 150, 200, 250, 300, 500, 1000, 2000 Or higher |
| CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY | Type of Operation | Automatic with Multi-Processor Integrated Control System and remotely conrolled web based Server system Or higher |
| CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY | Water Source | Surface Water |
| TECHNOLOGY | Technology | Reverse Osmosis (RO) |
| TECHNOLOGY | Anti scalant dosing pump | No |
| TECHNOLOGY | pH Correction Dosing Pump | No |
| CONSTRUCTIONAL | Raw water Storage capacity (Indicate '0' for direct connection to continuous Tap Water source) | 200, 500, 1000, 2000, 3000, 5000, 8000, 10000 Or higher |
| CONSTRUCTIONAL | Raw water Storage Tank Material of Construction | HDPE |
| CONSTRUCTIONAL | Location of the Raw Water Storage Tank | Inside the ATM Enclosure |
| CONSTRUCTIONAL | Treated water Storage capacity | 201-250, 251-300, 301-350, 351-400, 401-500, 501-600, 601-700, 701-800, 801-1000 Or higher |
| CONSTRUCTIONAL | Treated water Storage Tank Material of Construction | Stainless Steel 316 Gr, Stainless Steel 304 Gr, HDPE Or higher |
| CONSTRUCTIONAL | Equipped with an in-built chiller unit for providing continuous cold water of temperature around 15 degree Celcius | Yes |
| CONSTRUCTIONAL | In-built Chiller Tank Capacity (Liter) | 21-50, 51-100, 101-150, 151-200, 201-250, 251-300, 301-350, 351-400, 401-500, 501-600, 601-700, 701-800, 801-1000 Or higher |
| CONSTRUCTIONAL | Chiller Tank Material of Construction | Stainless Steel 316 Gr, Stainless Steel 304 Gr Or higher |
| CONSTRUCTIONAL | Number of Filtration steps | 5 |
| CONSTRUCTIONAL | Provided with suitable vending place for filling container of 20 liters capacity | No |
| DISPLAY | Display of water purity parameters | Yes, No |
| DISPLAY | Display Type | LED, LCD, TFT, NA Or higher |
| DISPLAY | Backlit Display | Yes, No |
| DISPLAY | Touch Screen Display | Yes, No |
| DISPLAY | Display Size (Characters x Lines) | 4 x 2 (4 Ch x 2 lines), 8 x 2 (8 Ch x 2 lines), 16 x 2 (16 Ch x 2 lines), 20 x 2 (20 Ch x 2 lines), 7" Tablet, NA |
| DISPLAY | Display of oulet water TDS level | Yes, No |
| DISPLAY | Display of outlet water pH level | Yes, No |
| DISPLAY | Display of outlet water Temperature | Yes, No |
| Inlet / Feed Pump to feed water from raw water storage tank to filter | Inlet / Feed Pump Type | Horizontal Centrifugal |
| Inlet / Feed Pump to feed water from raw water storage tank to filter | Number of Inlet / Feed Pumps | 1 |
| Multi Media Filter Vessels for First stage filtration for suspended particles | Material Of Construction for Multi Media Filter Vessels | FRP, Steel Or higher |
| Multi Media Filter Vessels for First stage filtration for suspended particles | Number of Multi Media Filter Vessels | 2, 1 Or higher |
| Multi-Port Valve to control filtration and backwash for media filter having sand & carbon | Type of Multi-Port Valve | Automatic |
| Multi-Port Valve to control filtration and backwash for media filter having sand & carbon | Multi-Port Valve Material of Construction | ABS |
| Multi-Port Valve to control filtration and backwash for media filter having sand & carbon | Number of Multi-Port Valves | 2 |
| Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality | Type of Anti scalent Dosing Pump | NA |
| Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality | Material Of Construction for Anti scalent Dosing Pump | NA |
| Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality | Number of Anti scalent Dosing Pumps | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Type of pH Correction Pump | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Material Of Construction for pH Correction Dosing Pump | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Number of pH Correction Dosing Pumps | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Dosing Tank Material of Construction | NA |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Type of High Pressure Pump | NA |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Material Of Construction for High Pressure Pump | NA |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Number of High Pressure Pumps | NA Or higher |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Low pressure switch for Protection of HP pump from burn-out | NA |
| RO Pressure Vessel | Type of RO Pressure Vessel | Membrane housing mounted on skid - End port type |
| RO Pressure Vessel | Material Of Construction for RO Pressure Vessel | FRP |
| RO Pressure Vessel | Number of RO Pressure Vessels | 4 Or higher |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Material Of Construction for UV System | SS |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Number of UV Systems | 1, 2 Or higher |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Number of UV Lights | 1, 2, 3, 4, 5, 6 Or higher |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Total UV Power | 16 Watts |
| CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash | CIP Tank | No |
| CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash | CIP Tank Material of Construction | NA |
| CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash | Number of CIP Tanks | NA Or higher |
| Power Source | Power Source | AC & DC (for dispensing only) Power Supply |
| Power Source | Power Supply | 230 ±10 V AC |
| Power Source | Battery back-up time (Hours) | 6, 8, 10, 12, 14, 16, 18, 20, 22, 24 Or higher |
| Water ATM - Enclosure | Structure | Rigid structure made of SS frame(3), Or higher |
| Water ATM - Enclosure | Thickness of the frame of structure (mm) | 2.5, 2 Or higher |
| Water ATM - Enclosure | Material of Construction of Side Panels of Water ATM | Stainless Steel Sheet Or higher |
| Water ATM - Enclosure | Side Panel Sheet Thickness (mm) | 1, 1.2 Or higher |
| Water ATM - Enclosure | PUF insulation of Side Panels of Water ATM | With, Without Or higher |
| Water ATM - Enclosure | PUF insulation of the door of Water ATM | With, Without Or higher |
| Water ATM - Enclosure | Provision for in-built litter space | Yes |
| Water ATM - Enclosure | Covered area of treatment plant enclosure (Square Foot) | 5.1-10, 10.1-15, 15.1-20, 20.1-30, 30.1-40, 40.1-50, 50.1-60, 60.1-70, 70.1-80, 80.1-90, 90.1-100, 100.1-110, 110.1-120 Or higher |
| Water ATM - Enclosure | Shape of the Water ATM housing | Cuboidal |
| Water ATM - Enclosure | Top Canopy of the Water ATM housing | Sloped |
| Water ATM - Enclosure | Headroom for the Water ATM enclosure (Foot) | 7.1-8.0, 8.1-9.0, 9.1-10.0 Or higher |
| Water ATM - Enclosure | Floor area around the Water ATM enclosure covered with anti-skid tiles | Yes |
| Water ATM - Enclosure | Water ATM enclosure protected with enclosed MS grill / mesh | No |
| Installation & Commissioning / Warranty | Trial Run and Training provided (inclusive in the Scope of Supply) (Days) | 5, 10 Or higher |
| Installation & Commissioning / Warranty | Warranty for storage Tanks (Year) | 3, 4, 5 Or higher |
| Installation & Commissioning / Warranty | Warranty for electrical motors (Year) | 1, 2, 3 Or higher |
| Installation & Commissioning / Warranty | Warranty for the filters (Year) | 1, 2, 3 Or higher |
| Installation & Commissioning / Warranty | Warranty for the system (Year) | 1, 2, 3 Or higher |
| Test Reports | Availability of Test Report from Central Govt /NABL/ILAC accredited lab to prove confirmity to specification | No |
| Test Reports | All the test reports and certificates shall furnish by the supplier to the buyer/consignee on demand | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experienced certificates for similar Drinking Water ATM installations
Financial statements (last 2 years) or turnover certificate
EMD/Security deposit documents (as per policy)
ISO/NABL/ILAC test reports (if available)
OEM authorization or authorized dealership certificate
Bank mandate for e-payment
Notarized affidavit confirming not blacklisted
GSTR-3B filing status and GST return
Locally stationed service address proof
Key insights about BIHAR tender market
Bidders must submit GST, PAN, turnover certificates, and experience proofs along with a bank mandate for e-payment. Include ISO/NABL/ILAC test reports if available, OEM authorizations, and a sample demonstration before the bid closing date. Ensure compliance with IS/ISO standards and provide turnkey installation details.
Required documents include GST certificate, PAN, turnover certificates, last 2 years financial statements, NABL/ILAC test reports, OEM authorization, e-payment mandate, experience certificates, and affidavit of non-blacklisting. Also provide site suitability and service capability proof.
Specifications cover coin/card/RFID/mobile payments, purification capacity, RO+UV system with anti-scalant and pH dosing, in-built chiller around 15°C, multi-filtration, CIP tank, UV power, and a backlit touch display showing TDS, pH, and temp. Enclosure must be MS-framed with PUf insulation and anti-skid flooring.
Expect milestone-based payments aligned to delivery and commissioning; e-payment supported via bank mandate. Delivery window is 30-45 days from order, with possible 25% quantity variation and proportional extension per the option clause.
Supply must include NABL/ILAC-accredited test reports on demand; ISO 9001 (where specified); and OEM/IS I certifications if mandated. On-site demonstration and vulnerability checks are expected before final selection.
The bidder must provide complete turnkey installation, commissioning, and a trial run with training included in the scope. The training period should be defined in the contract, ensuring operators are proficient in coin/card/RFID operations and maintenance.
Rural Development Department
📍 SAMASTIPUR, BIHAR
Indo Tibetan Border Police (itbp)
📍 SHIVPURI, MADHYA PRADESH
Chhattisgarh Swami Vivekananda Technical University (csvtu)
📍 DURG, CHHATTISGARH
Uttar Pradesh Power Corporation Limited (uppcl)
📍 LUCKNOW, UTTAR PRADESH
Indian Army
📍 SRINAGAR, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS