Bid Publish Date
05-Sep-2026, 11:04 am
Bid End Date
15-Sep-2026, 12:00 pm
Value
₹62,800
Location
Progress
The Indian Army, Department of Military Affairs, seeks supply of multiple mechanical components including ARMATURE, PINION, MAIN BEARING, COMBINARION SWITCH, ASSY FIRST PIPE, HOSE HUMP and DOOR INNER COVER in SRINAGAR, JAMMU & KASHMIR (190001). Estimated value is ₹62,800.00 with scope limited to the supply of goods. The contract allows a flexible quantity increase of up to 25% at contracted rates, and delivery timelines adjust proportionally to the extended quantity. Unique terms include advance sample approval and potential contract termination if samples deviate from specifications. This procurement emphasizes strict adherence to approved samples and timely supply to meet military readiness.
Product names: ARMATURE, PINION, MAIN BEARING, COMBINARION SWITCH, ASSY FIRST PIPE, HOSE HUMP, DOOR INNER COVER
Quantity/estimates: ₹62,800 total estimated value; quantity flexibility up to 25%
EMD: Not specified in the provided terms
Standards/certifications: Not specified; emphasis on approved samples and contract adherence
Delivery: Proportional extension based on additional quantity; minimum 30 days implied in general option clause
Option to increase quantity by 25% at contracted rates
Advance sample submission and buyer-approved modifications within 5 days
Supply scope limited to goods; no bulk manufacturing without sample conformity
Not specified; bulk payment terms tied to delivery orders and sample approvals
Delivery starts after award and sample approval; extended periods allowed if option clause exercised
Not clearly stated; potential for contract termination if samples deviate significantly
Submit PAN and GSTIN with bid
Provide EFT mandate and cancelled cheque
Capability to supply GOODS (armature, bearings, switches, assemblies) in specified category
Quantity
26
Category
ARMATURE
Bid Type
Two Packet Bid
Bid Validity
15 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
2 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ARMATURE , PINION , MAIN BEARING , COMBINARION SWITCH , ASSY FIRST PIPE , HOSE HUMP , DOOR INNER COVER
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Srinagar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Srinagar | Srinagar | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
ARMATURE
ARMATURE
PINION
PINION
MAIN BEARING
MAIN BEARING
COMBINARION SWITCH
COMBINARION SWITCH
ASSY FIRST PIPE
ASSY FIRST PIPE
HOSE HUMP
HOSE HUMP
DOOR INNER COVER
DOOR INNER COVER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ARMATURE | ARMATURE | 1 | nos | ksantosh1111 | 15 | |
| 2 | PINION | PINION | 1 | nos | ksantosh1111 | 15 | |
| 3 | MAIN BEARING | MAIN BEARING | 3 | nos | ksantosh1111 | 15 | |
| 4 | COMBINARION SWITCH | COMBINARION SWITCH | 3 | nos | ksantosh1111 | 15 | |
| 5 | ASSY FIRST PIPE | ASSY FIRST PIPE | 4 | nos | ksantosh1111 | 15 | |
| 6 | HOSE HUMP | HOSE HUMP | 4 | nos | ksantosh1111 | 15 | |
| 7 | DOOR INNER COVER | DOOR INNER COVER | 10 | nos | ksantosh1111 | 15 |
Discover companies most likely to bid on this tender
PAN card
GSTIN certificate
Cancelled cheque
EFT mandate certificate certified by bank
Any vendor code creation documents as requested
Industry-specific certifications not explicitly stated in terms
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid. The procurement allows a 25% quantity increase and requires advance sample submission within 5 days of award. Ensure supply of GOODS and comply with approved sample specifications to avoid contract termination.
Required documents include PAN card, GSTIN, cancelled cheque, and EFT mandate certified by bank. Ensure supplier code creation if applicable. These documents accompany the bid for vendor registration and eligibility, with no explicit EMD details provided in the data.
Specific technical specs are not listed in the data; emphasis is on supply of GOODS with approved advance samples. Submit 1 advance sample within 5 days; if the buyer approves or requests modifications within 5 days, bulk supply follows per approved sample.
Delivery is governed by delivery orders; the purchaser may increase quantity by up to 25% at contracted rates, with a proportional extension of delivery time. If extended, time calculation follows (additional quantity/original quantity) × original delivery period, minimum 30 days.
An advance sample must be submitted within 5 days of contract award. The buyer will approve or list modifications within 5 days; bulk supply must align with approved sample or contract may be terminated for major deviations.
Scope explicitly states: Only supply of Goods for ARMATURE, PINION, MAIN BEARING and related assemblies; no manufacturing or services are included unless specified otherwise in the contract framework.
The data does not specify LD terms; potential contract termination is noted if samples show major deviations. Delays due to buyer approval may shift delivery without LD implications; exact penalties would be defined in the final contract.
Ensure registration with PAN and GSTIN, provide Cancelled Cheque and EFT Mandate, and demonstrate ability to supply the listed GOODS. Adhere to sample approval timelines and be prepared for quantity adjustments up to 25% during the contract period.