Open Tender for Pressure Gauge,Limit Switch for contact device,Oil filter element outer and inner sleeve,Steel wire in KULLU, HIMACHAL PRADESH

Bid Publish Date

21-Jul-2026, 11:24 am

Bid End Date

26-Aug-2026, 11:00 am

EMD

₹20,000

Value

₹9,73,783

Generate Docs

Progress

Issue21-Jul-2026, 11:24 am
Corrigendum14-Aug-2026
AwardPending

Nhpc Limited announces a tender for Pressure Gauge, Limit Switch for contact device, Oil filter element outer and inner sleeve, Steel wire rope point 66 mm dia multiply by 7 wires alongwith pin soldered on both ends, Sealing ring for hydraulic amplifier, O seal ring for opening closing pressure and drain port of MDV, Internal circlips, Spring for deflector position forward slash limiter indicator, External Circlips Six of each type, Main slide valve sleeve and poor assembly 100 mm dia, Emergency closing valve with solenoid coil, Auto forward slash Manual solenoid valve, Balance Indicator, Speed setting indicator, Electric techometer, Output setting indicator, Rotary cam switch assy, Isolating valve 1 forward slash 2 double desh BSP, Shuttle valve, Wire rope 6mm dia, NRV 3 forward slash 4 double desh Air, Pilot needle and sleeve set, Complete Thrust rod in KULLU, HIMACHAL PRADESH. Quantity: 79. Submission Deadline: 26-08-2026 11: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

79

Category

Complete Thrust rod

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Pressure Gauge , Limit Switch for contact device , Oil filter element outer and inner sleeve , Steel wire rope point 66 mm dia multiply by 7 wires alongwith pin soldered on both ends , Sealing ring for hydraulic amplifier , O seal ring for opening closing pressure and drain port of MDV , Internal circlips , Spring for deflector position forward slash limiter indicator , External Circlips Six of each type , Main slide valve sleeve and poor assembly 100 mm dia , Emergency closing valve with solenoid coil , Auto forward slash Manual solenoid valve , Balance Indicator , Speed setting indicator , Electric techometer , Output setting indicator , Rotary cam switch assy , Isolating valve 1 forward slash 2 double desh BSP , Shuttle valve , Wire rope 6mm dia , NRV 3 forward slash 4 double desh Air , Pilot needle and sleeve set , Complete Thrust rod

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

15

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

112

Delivery Locations

1

Delivery Cities

Kullu

Delivery Pincodes

175141

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
ALOK KUMAR175141,Parbati HE Project, Stage-II ,Store Complex, Vill.& P.O. Garsa, Distt. KulluKulluHimachal Pradesh1751414112-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9605865.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Nhpc Limited

Department

NA

Office Name

Parbari Stage-ii Nhpc Limited

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

14-Aug-2026

Extended Deadline

19-Aug-2026, 5:30 am

Opening Date

19-Aug-2026, 6:00 am

Bill of Quantities (BOQ) 23 Items Sign in for GEM prices

#1

Pressure Gauge

Technical Specification of the item as per Sl No 1 of Specification Document of Bid

4 nos Delivery: 112 days
#2

Limit Switch for contact device

Technical Specification of the item as per Sl No 2 of Specification Document of Bid

2 nos Delivery: 112 days
#3

Oil filter element outer and inner sleeve

Technical Specification of the item as per Sl No 3 of Specification Document of Bid.

4 nos Delivery: 112 days
#4

Steel wire rope point 66 mm dia multiply by 7 wires alongwith pin soldered on both ends

Technical Specification of the item as per Sl No 4 of Specification Document of Bid

4 set Delivery: 112 days
#5

Sealing ring for hydraulic amplifier

Technical Specification of the item as per Sl No 5 of Specification Document of Bid

4 nos Delivery: 112 days
#6

O seal ring for opening closing pressure and drain port of MDV

Technical Specification of the item as per Sl No 6 of Specification Document of Bid

2 set Delivery: 112 days
#7

Internal circlips

Technical Specification of the item as per Sl No 7 of Specification Document of Bid

2 set Delivery: 112 days
#8

Spring for deflector position forward slash limiter indicator

Technical Specification of the item as per Sl No 8 of Specification Document of Bid

2 nos Delivery: 112 days
#9

External Circlips Six of each type

Technical Specification of the item as per Sl No 9 of Specification Document of Bid

2 set Delivery: 112 days
#10

Main slide valve sleeve and poor assembly 100 mm dia

Technical Specification of the item as per Sl No 10 of Specification Document of Bid

2 nos Delivery: 112 days
#11

Emergency closing valve with solenoid coil

Technical Specification of the item as per Sl No 11 of Specification Document of Bid

2 set Delivery: 112 days
#12

Auto forward slash Manual solenoid valve

Technical Specification of the item as per Sl No 12 of Specification Document of Bid

2 nos Delivery: 112 days
#13

Balance Indicator

Technical Specification of the item as per Sl No 13 of Specification Document of Bid

2 nos Delivery: 112 days
#14

Speed setting indicator

Technical Specification of the item as per Sl No 14 of Specification Document of Bid

2 nos Delivery: 112 days
#15

Electric techometer

Technical Specification of the item as per Sl No 15 of Specification Document of Bid

2 nos Delivery: 112 days
#16

Output setting indicator

Technical Specification of the item as per Sl No 16 of Specification Document of Bid

2 nos Delivery: 112 days
#17

Rotary cam switch assy

Technical Specification of the item as per Sl No 17 of Specification Document of Bid

1 nos Delivery: 112 days
#18

Isolating valve 1 forward slash 2 double desh BSP

Technical Specification of the item as per Sl No 18 of Specification Document of Bid

1 nos Delivery: 112 days
#19

Shuttle valve

Technical Specification of the item as per Sl No 19 of Specification Document of Bid

2 nos Delivery: 112 days
#20

Wire rope 6mm dia

Technical Specification of the item as per Sl No 20 of Specification Document of Bid

30 mtr Delivery: 112 days
#21

NRV 3 forward slash 4 double desh Air

Technical Specification of the item as per Sl No 21 of Specification Document of Bid

1 nos Delivery: 112 days
#22

Pilot needle and sleeve set

Technical Specification of the item as per Sl No 22 of Specification Document of Bid

2 set Delivery: 112 days
#23

Complete Thrust rod

Technical Specification of the item as per Sl No 23 of Specification Document of Bid

2 nos Delivery: 112 days

Categories 48

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer