Invitation to Bid - Works Related to Semikestner 1000 mSq Pipeline,Works Related to Semikestner 1000 mSq Pipeline,Works in BIJNOR, UTTAR PRADESH

Bid Publish Date

11-Jul-2026, 12:05 pm

Bid End Date

27-Jul-2026, 1:00 pm

Value

₹2,00,000

Progress

Issue11-Jul-2026, 12:05 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3551

Category

Works Related to Semikestner 1000 mSq Pipeline

Bid Type

Two Packet Bid

Categories 113

ACID STORAGE TANK AGITATORS SCRAP PVC PIPE APPARELS ANGLE ANVIL HOUSEHOLD ITEM STRUCTURE FABRICATION WOODEN TROLLEY WATER TREATMENT PLANT FABRICATION OF PIPE CARBON STEEL PIPE SEAMLESS PIPE TUBE AND FITTING AIR COOLED ENGINE BEARINGS TURBINE BLOWER MIXERS PARTS AND ACCESSORIES IRON ALMIRAH BEARINGS BUSHINGS AND GEARS STRUCTURAL STEEL FURNITURE DISTILLATION HARDWARE AND FASTENERS SPHERICAL BEARING FERROUS ALLOY SUPPLY STRIP WOODEN PRODUCT FABRICATION WORK CLEANING WORK STEEL TUBE FABRICATED PIPE ROLLERS PUMP SPARE PARTS CNG CASCADES CLOTHING FIXING ALIGNMENT FLANGE MEDICAL GAS SYSTEM HEATER LOGIC ANALYZER PINS ART METALS WATER PIPE LINE MILITARY VEHICLE BED FIRE WATER LINE STOMACHERS TANK CONSTRUCTION ALUMINIUM ALLOY WATER TANK CENTRIFUGAL MACHINE AC PIPES SLURRY PUMP GALVANISED PIPE FITMENT BARE METAL BEARING HOLDERS TROUGHING ROLLER ROLLER BEARING PNEUMATIC STEEL PIPE SHEAR PUMPS PILLOW BLOCK ALLOY ROTARY LOBE PUMPS WHEEL BEARING WATER SUPPLY PROJECT RETURN ROLLER FLAT AXLE BOX BOX VALVE WATER LEVEL RECORDER WATER SUPPLY MATERIAL GEAR BEAM TROLLEY SNATCH BLOCK BEARING NUTS ERECTION OF STRUCTURAL WORM GEAR TURBINE PUMPS PINION GEAR BEARING BLOCK EXHAUST SYSTEM OVER HEAD TANK FIBERS THREADS AND YARNS TUBES AND PIPES BEARING BRACKET TRANSITION METALS BIOLOGICAL BATH PIPES AND TUBES FABRICATOR LIFT IRRIGATION MS PIPE LINE VALVE PARTS AND ACCESSORIES ESCRAP ARMATURE SHAFT PINION WHEEL CPVC PIPE PEB SUPPLY OF BEARING UPVC PIPE FAN METAL PRODUCTS BAR METALLURGY TEE POLYMERASE CHAIN REACTION PCR PIPELINE WORK MANUFACTURING SERVICES SLEEVE BEARING

N/a has released a public tender for Works Related to Semikestner 1000 mSq Pipeline, Wash Out Pipeline Header to New Quad Body No 1, Raw Juice Pump Pipeline, Syrup Pipeline Cleaning Work, Syrup Sulphiter Pipeline, New Quad No 4 Extension Catcher Vapour Body, Bagassilo Fan Repair, Big Filter Mud Tray Repair, Vacuum Air Line Work, Pipe Fabrication, Clear Juice Tank Repair, Pump and Motor Alignment, Juice Heater Repair, Condensate Bottle Fabrication, Clarifier Repair, Cane Carrier Repair, Secondary Rack Carrier Repair, Rack Carrier Repair, Cane Carrier Runner Replacement, Secondary Rack Carrier Runner Replacement, Rack Carrier Runner Replacement, Cane Carrier Structural Repair, Rack Carrier Structural Repair, Cane Carrier Chain Beam Repair, Inter Rack Carrier Trough Repair, Mill Trough Repair, TRPF Lower Plate Repair, Mill Roller Repair, Leveler Repair, Fiberizer Repair, Secondary Rack Carrier Trough Repair, Tail Shaft Bed Repair, Mill Pinion Repair, Cane Carrier Angle Replacement, Secondary Rack Carrier Angle Replacement, TRPF Roller Juice Plate Repair, Cold Water Pipeline Work, Bearing Cooling Line Replacement, Pipe Fittings, Mill Juice Pipeline Work, Hot Water Pipeline Work, Screen Juice Pipeline Work, Flange Work, Nipple Work, Mill Fabrication Work, Header Fabrication, Delivery Header Fabrication, TRPF Tank Repair, Transmission Gear Repair, Juice Pump Pipeline Work, Reducer Fabrication, Flange Fabrication, Band Fabrication, TRPF Cover Fabrication, TRPL Chute Repair, Crane Unloader Rail Replacement, Bearing Housing Repair, Juice Distribution Tray Fabrication, TRPF Roller Repair, Rack Repair Work, Crown Pinion Guard Repair, Tail Bar Repair, TRPF Water Cover Repair, Mill Roller Grooving, Chain Link Forging Work in BIJNOR, UTTAR PRADESH. Quantity: 3551. Submission Deadline: 27-07-2026 13: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Works Related to Semikestner 1000 mSq Pipeline , Wash Out Pipeline Header to New Quad Body No 1 , Raw Juice Pump Pipeline , Syrup Pipeline Cleaning Work , Syrup Sulphiter Pipeline , New Quad No 4 Extension Catcher Vapour Body , Bagassilo Fan Repair , Big Filter Mud Tray Repair , Vacuum Air Line Work , Pipe Fabrication , Clear Juice Tank Repair , Pump and Motor Alignment , Juice Heater Repair , Condensate Bottle Fabrication , Clarifier Repair , Cane Carrier Repair , Secondary Rack Carrier Repair , Rack Carrier Repair , Cane Carrier Runner Replacement , Secondary Rack Carrier Runner Replacement , Rack Carrier Runner Replacement , Cane Carrier Structural Repair , Rack Carrier Structural Repair , Cane Carrier Chain Beam Repair , Inter Rack Carrier Trough Repair , Mill Trough Repair , TRPF Lower Plate Repair , Mill Roller Repair , Leveler Repair , Fiberizer Repair , Secondary Rack Carrier Trough Repair , Tail Shaft Bed Repair , Mill Pinion Repair , Cane Carrier Angle Replacement , Secondary Rack Carrier Angle Replacement , TRPF Roller Juice Plate Repair , Cold Water Pipeline Work , Bearing Cooling Line Replacement , Pipe Fittings , Mill Juice Pipeline Work , Hot Water Pipeline Work , Screen Juice Pipeline Work , Flange Work , Nipple Work , Mill Fabrication Work , Header Fabrication , Delivery Header Fabrication , TRPF Tank Repair , Transmission Gear Repair , Juice Pump Pipeline Work , Reducer Fabrication , Flange Fabrication , Band Fabrication , TRPF Cover Fabrication , TRPL Chute Repair , Crane Unloader Rail Replacement , Bearing Housing Repair , Juice Distribution Tray Fabrication , TRPF Roller Repair , Rack Repair Work , Crown Pinion Guard Repair , Tail Bar Repair , TRPF Water Cover Repair , Mill Roller Grooving , Chain Link Forging Work

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Bijnor

Delivery Pincodes

246763

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612BijnorUttar Pradesh246763990-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9590206.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 102 Items Sign in for GEM prices

#1

Works Related to Semikestner 1000 mSq Pipeline

Fabrication and installation of 6 inch Tee in the pipeline complete as required

9 pcdn Delivery: 90 days
#2

Works Related to Semikestner 1000 mSq Pipeline

Dismantling of existing 8 inch MS pipeline complete

8 pcdm Delivery: 90 days
#3

Works Related to Semikestner 1000 mSq Pipeline

Reinstallation of 8 inch MS pipeline at the designated position including alignment welding testing and successful trial run

8 pcdm Delivery: 90 days
#4

Works Related to Semikestner 1000 mSq Pipeline

Opening/removal of existing 8 inch valve

2 pcdn Delivery: 90 days
#5

Works Related to Semikestner 1000 mSq Pipeline

Installation of 8 inch valve at the designated location complete

2 pcdn Delivery: 90 days
#6

Works Related to Semikestner 1000 mSq Pipeline

Supply fabrication and installation of 8 inch flange complete

4 pcdn Delivery: 90 days
#7

Wash Out Pipeline Header to New Quad Body No 1

Supply and installation of 8 inch nipple complete

2 pcdn Delivery: 90 days
#8

Wash Out Pipeline Header to New Quad Body No 1

Dismantling of existing 8 inch and 6 inch pipelines including removal from site

20 per meter Delivery: 90 days
#9

Wash Out Pipeline Header to New Quad Body No 1

Reinstallation of 8 inch and 6 inch pipelines at the designated position including alignment welding testing and successful trial run

20 per meter Delivery: 90 days
#10

Raw Juice Pump Pipeline

Dismantling of existing 8 inch raw juice pump pipeline and disposal of dismantled material at the designated scrap yard

12 pcdm Delivery: 90 days
#11

Raw Juice Pump Pipeline

Reinstallation of 8 inch MS pipeline including alignment welding testing and successful trial run

12 pcdm Delivery: 90 days
#12

Raw Juice Pump Pipeline

Fabrication and installation of 8 inch X 6 inch reducer complete

2 pcdn Delivery: 90 days
#13

Raw Juice Pump Pipeline

Fabrication and installation of 8 inch flange complete

4 pcdn Delivery: 90 days
#14

Raw Juice Pump Pipeline

Removal and reinstallation of 8 inch valve at the designated location complete

2 pcdn Delivery: 90 days
#15

Syrup Pipeline Cleaning Work

Fabrication and installation of 8 inch nipple complete

3 pcdn Delivery: 90 days
#16

Syrup Pipeline Cleaning Work

Dismantling of existing 6 inch syrup pipeline from syrup pump to syrup tank complete

80 pcdm Delivery: 90 days
#17

Syrup Pipeline Cleaning Work

Fabrication and installation of 6 inch X 3 inch reducer complete

2 pcdn Delivery: 90 days
#18

Syrup Pipeline Cleaning Work

Fabrication and installation of 2 inch flange complete

3 pcdn Delivery: 90 days
#19

Syrup Pipeline Cleaning Work

Fabrication of 6 inch nipple complete

8 pcdn Delivery: 90 days
#20

Syrup Pipeline Cleaning Work

Opening/removal of existing 6 inch valve

2 pcdn Delivery: 90 days
#21

Syrup Pipeline Cleaning Work

Refitting and fastening of 6 inch valve after maintenance complete

2 pcdn Delivery: 90 days
#22

Syrup Sulphiter Pipeline

Fabrication and installation of 6 inch Tee complete

1 pcdn Delivery: 90 days
#23

Syrup Sulphiter Pipeline

Fabrication and installation of 8 inch bend complete

2 pcdn Delivery: 90 days
#24

Syrup Sulphiter Pipeline

Fabrication and installation of 800 mm diameter nipple complete

1 pcdn Delivery: 90 days
#25

Syrup Sulphiter Pipeline

Dismantling of existing 8 inch pipeline complete

18 pcdm Delivery: 90 days
#26

Syrup Sulphiter Pipeline

Reinstallation of 8 inch pipeline at the designated position including alignment welding testing and successful trial run

18 pcdm Delivery: 90 days
#27

Syrup Sulphiter Pipeline

Fabrication and installation of 8 inch flange complete

5 pcdn Delivery: 90 days
#28

Syrup Sulphiter Pipeline

Fabrication and installation of 8 inch Tee complete

4 pcdn Delivery: 90 days
#29

Syrup Sulphiter Pipeline

Fabrication and installation of 8 inch bend complete

4 pcdn Delivery: 90 days
#30

New Quad No 4 Extension Catcher Vapour Body

Dismantling of damaged extension catcher vapour body of New Quad No 4 removal of corroded angle channels disposal of scrap at the designated scrap yard fabrication of a new catcher from 10 mm thick MS plate by bending installation at site completion of all necessary connections and successful trial run Approximate size Diameter 160 m X Length 620 m

1 per piece Delivery: 90 days
#31

Bagassilo Fan Repair

Cutting and removing damaged casing of Bagassilo fan fabrication using supplied 8/10 mm MS plate installation and satisfactory trial

1 each Delivery: 90 days
#32

Big Filter Mud Tray Repair

Cutting and removing damaged mud tray of big filter disposal of scrap fabrication using supplied 8/10 mm MS plate installation and satisfactory trial (Approx Dia 375 m X Length 860 m)

1 job Delivery: 90 days
#33

Vacuum Air Line Work

Dismantling of 6 inch vacuum air line with filter

18 meter Delivery: 90 days
#34

Vacuum Air Line Work

Fixing of 6 inch vacuum air line in position including alignment and satisfactory trial

18 meter Delivery: 90 days
#35

Pipe Fabrication

Fabrication and installation of 6 inch MS flange

2 no Delivery: 90 days
#36

Pipe Fabrication

Fabrication and installation of 6 inch MS tee

2 no Delivery: 90 days
#37

Pipe Fabrication

Fabrication and installation of 6 inch MS nipple

2 no Delivery: 90 days
#38

Clear Juice Tank Repair

Cutting and removing corroded box of clear juice liquidation tank door fabrication using 8 mm MS plate installation all connections and satisfactory trial (Approx Size 10 m X 10 m)

1 each Delivery: 90 days
#39

Pump and Motor Alignment

Fitting fixing alignment of MS band for 120 HP clear juice pump and motor including satisfactory trial

1 job Delivery: 90 days
#40

Juice Heater Repair

Replacement of strip and flat iron for top and bottom header rubber packing fixing new rubber packing and satisfactory trial

4 each Delivery: 90 days
#41

Condensate Bottle Fabrication

Removal of condensate bottle of juice heater/quad semicaser/vapor cell fabrication of new bottle using supplied 8/10 mm MS plate and installation

1 each Delivery: 90 days
#42

Clarifier Repair

Removal of corroded distributor from clarifier compartment disposal of scrap fabrication of new distributor using 6/8 mm MS plate installation and satisfactory trial

2 job Delivery: 90 days
#43

Cane Carrier Repair

Replacement of damaged side and bottom plates of cane carrier using supplied 6 mm MS plate

70 sq m Delivery: 90 days
#44

Secondary Rack Carrier Repair

Replacement of damaged side and bottom plates using supplied 6 mm MS plate

30 sq m Delivery: 90 days
#45

Rack Carrier Repair

Replacement of damaged side and bottom plates of Rack Carrier No1 2 & 3 using supplied 6 mm MS plate

50 sq m Delivery: 90 days
#46

Cane Carrier Runner Replacement

Cutting and removing old runner and fixing new runner for cane carrier

180 meter Delivery: 90 days
#47

Secondary Rack Carrier Runner Replacement

Cutting and removing old runner and fixing new runner

75 meter Delivery: 90 days
#48

Rack Carrier Runner Replacement

Cutting and removing old runner and fixing new runner for Rack Carrier No1 2 & 3

75 meter Delivery: 90 days
#49

Cane Carrier Structural Repair

Removal of corroded supporting angles/channels and installation of new supporting angle

60 meter Delivery: 90 days
#50

Rack Carrier Structural Repair

Removal of corroded angles/channels and installation of new angle

70 meter Delivery: 90 days
#51

Cane Carrier Chain Beam Repair

Replacement of 150 mm chain beam

20 meter Delivery: 90 days
#52

Inter Rack Carrier Trough Repair

Removal of old trough of Inter Rack Carrier No1 2 & 3 fabrication using supplied 8/10 mm MS plate and installation

2 each Delivery: 90 days
#53

Mill Trough Repair

Cutting and replacing damaged trough of Mill No3 & 4 including satisfactory trial

2 each Delivery: 90 days
#54

TRPF Lower Plate Repair

Removal of damaged lower plate under TRPF of Mill No2 & 3 fabrication using supplied 10/12 mm MS plate and installation

1 each Delivery: 90 days
#55

Mill Roller Repair

Fabrication of new juice rings for mill rollers using supplied 6/8 mm MS plate as per sample

6 no Delivery: 90 days
#56

Leveler Repair

Dismantling damaged side plates of leveler disposal of scrap fabrication and installation of new 8/10 mm MS side plates

10 sq m Delivery: 90 days
#57

Fiberizer Repair

Dismantling damaged side plate of fiberizer disposal of scrap fabrication and installation of new 8/10 mm MS side plate

1 meter Delivery: 90 days
#58

Secondary Rack Carrier Trough Repair

Removal of old trough fabrication using supplied 8/10/12 mm MS plate and installation

1 each Delivery: 90 days
#59

Tail Shaft Bed Repair

Cutting and removing worn tail shaft bed of secondary rack carrier fabrication using supplied 200 mm beam and installation

1 each Delivery: 90 days
#60

Mill Pinion Repair

Fabrication and installation of new pinion gear for Mill No3 removal of old gear and disposal to scrap yard

1 each Delivery: 90 days
#61

Cane Carrier Angle Replacement

Removal of damaged angles from cane carrier side plate/inter rack carrier 2 & 3 and installation of new angles

40 meter Delivery: 90 days
#62

Secondary Rack Carrier Angle Replacement

Removal of damaged angles from secondary rack carrier/inter rack carrier 2 & 3 fabrication and installation of new angles

25 meter Delivery: 90 days
#63

TRPF Roller Juice Plate Repair

Removal of damaged juice plate of TRPF rollers fabrication using supplied 8/10 mm MS plate and installation

2 each Delivery: 90 days
#64

Cold Water Pipeline Work

Dismantling of existing 4 inch cold water pipeline from Mill No1 to Mill No3 and installation of new pipeline

40 meter Delivery: 90 days
#65

Bearing Cooling Line Replacement

Removal of worn bearing cooling line from Mill No1 to 4 and installation of new 3 inch pipeline complete with flange and nipple

25 meter Delivery: 90 days
#66

Pipe Fittings

Supply/Fabrication and installation of 3 inch flange

12 no Delivery: 90 days
#67

Pipe Fittings

Supply/Fabrication and installation of 1 inch nipple

18 no Delivery: 90 days
#68

Mill Juice Pipeline Work

Cutting and removing old 6 inch mill juice pipeline from Mill Juice Pump No 3 to Mill No 1 and installing new 6 inch MS pipeline complete with fitting and testing

30 meter Delivery: 90 days
#69

Hot Water Pipeline Work

Dismantling existing 4 inch dia hot water pipeline from Mill No 3 to Mill No 4 and installing new pipeline complete with fittings and testing

20 meter Delivery: 90 days
#70

Mill Juice Pipeline Work

Cutting and removing old pipeline from Mill Juice Pump No 4 to Mill No 2 and installing new 6 inch MS pipeline complete with fittings and testing

30 meter Delivery: 90 days
#71

Screen Juice Pipeline Work

Cutting and removing old pipeline from Mill Screen Juice Pump to Raw Juice Tank and installing new 6 inch & 8 inch pipeline complete with fittings and testing

30 meter Delivery: 90 days
#72

Flange Work

Dismantling and installation of 6 inch flange

2 no Delivery: 90 days
#73

Flange Work

Dismantling and installation of 8 inch flange

6 no Delivery: 90 days
#74

Flange Work

Dismantling and installation of 10 inch flange

8 no Delivery: 90 days
#75

Nipple Work

Dismantling and installation of 4 inch nipple

10 no Delivery: 90 days
#76

Nipple Work

Dismantling and installation of 6 inch nipple

4 no Delivery: 90 days
#77

Nipple Work

Dismantling and installation of 8 inch nipple

6 no Delivery: 90 days
#78

Mill Fabrication Work

Fabrication and preparation of mill beds complete as required

4 job Delivery: 90 days
#79

Header Fabrication

Removing existing 12 inch screen juice header fabricating new header as per sample erection reconnection and satisfactory trial

1 each Delivery: 90 days
#80

Delivery Header Fabrication

Fabrication and installation of new 10 inch delivery header (21 m long) for Screen Juice Tank including 8 inch & 10 inch nipples erection and testing

1 each Delivery: 90 days
#81

TRPF Tank Repair

Cutting damaged top cover of TRPF tank fabrication using supplied 8/10 mm MS plate installation and satisfactory trial

1 each Delivery: 90 days
#82

Transmission Gear Repair

Inspection and repair/checking of bottom cover of transmission gear of Mill No 4 as per sample

1 each Delivery: 90 days
#83

Juice Pump Pipeline Work

Installation of 6 inch juice pump pipeline complete with fitting and testing

20 meter Delivery: 90 days
#84

Reducer Fabrication

Fabrication and installation of 6 inch reducer in the pipeline

2 no Delivery: 90 days
#85

Reducer Fabrication

Fabrication and installation of 8 inch reducer in the pipeline

2 no Delivery: 90 days
#86

Flange Fabrication

Fabrication and installation of 6 inch flange in the pipeline

2 no Delivery: 90 days
#87

Flange Fabrication

Fabrication and installation of 4 inch flange in the pipeline

2 no Delivery: 90 days
#88

Band Fabrication

Fabrication and installation of 6 inch pipe band/support

2 no Delivery: 90 days
#89

TRPF Cover Fabrication

Fabrication of top cover for TRPF sluice installed in mill house

2 each Delivery: 90 days
#90

Cane Carrier Structural Repair

Removing damaged angles of cane carrier side plate and Inter Rack Carrier No 2 & 3 and installing new angles

20 meter Delivery: 90 days
#91

Rack Carrier Structural Repair

Removing damaged angles of Secondary Rack Carrier and Inter Rack Carrier No 2 & 3 and installing new angles

40 meter Delivery: 90 days
#92

TRPL Chute Repair

Dismantling damaged side and back plates of TRPL chute of Mill No 2 fabrication using supplied 10/12 mm MS plate installation and satisfactory trial

1 each Delivery: 90 days
#93

Crane Unloader Rail Replacement

Removing damaged rail of crane unloader trolley installing new 40 X 40 mm rail strengthening and testing

36 meter Delivery: 90 days
#94

Bearing Housing Repair

Fabrication and installation of new cover for mill bearing housing

1 each Delivery: 90 days
#95

Juice Distribution Tray Fabrication

Fabrication and installation of juice distribution trays in mill juice pipeline at designated locations

2 each Delivery: 90 days
#96

TRPF Roller Repair

Welding and repair of TRPF rollers including welding and correction of damaged side plates

2 each Delivery: 90 days
#97

Rack Repair Work

Repair of secondary rack carrier and inter rack carrier racks

20 rack Delivery: 90 days
#98

Crown Pinion Guard Repair

Removing damaged water guard of crown pinion of Mill No 3 fabrication of new guard from supplied 2/3 mm plate and installation

1 each Delivery: 90 days
#99

Tail Bar Repair

Welding and fabrication of cut tail bars of Mill No 1 & 3 as per required dimensions

2 each Delivery: 90 days
#100

TRPF Water Cover Repair

Dismantling damaged TRPF water cover of Mill No 2 fabrication using supplied 8/10 mm MS plate installation and satisfactory trial

1 each Delivery: 90 days
#101

Mill Roller Grooving

Carrying out pineapple (chevron) grooving/cutting work on mill rollers

8 each Delivery: 90 days
#102

Chain Link Forging Work

Forging of side links of cane carrier bagasse carrier elevator and RBC chain including fitting of pins and bushes profiling and finishing to required size

2,100 link Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer