TenderDekho Logo
Closed GEM

HPCL AMC for Pre-owned FITECH Rim Seal Systems Tender India 2026

Bid Publish Date

24-Sep-2026, 9:58 am

Bid End Date

03-Oct-2026, 10:00 am

Generate Docs

Progress

Issue24-Sep-2026, 9:58 am
Corrigendum29-Sep-2026
AwardPending

Tender Overview

Hindustan Petroleum Corporation Ltd seeks an Annual Maintenance Contract (AMC) and CMC for pre-owned FITECH Rim Seal Systems. The scope includes monthly AMC payments and per diem charges for engineers. The tender lacks published start/end dates and exact estimated value, but indicates ongoing service for pre-owned equipment maintenance. The ATC document is uploaded by the buyer, signaling specific terms to bidders. This opportunity targets suppliers with proven capability in maintaining pre-owned rim seal systems and providing on-site engineering support under a monthly servicing arrangement.

Technical Specifications & Requirements

  • Product/service: Customized AMC/CMC for Pre-owned FITECH Rim Seal Systems
  • Service type: Monthly maintenance contract with per diem charges for engineers
  • Scope: On-site engineering support; annual maintenance cadence; no BOQ items published
  • Documentation: ATC file referenced by buyer; no explicit BOQ quantities available
  • KEY standards or specs: Not published; bidders should review the ATC for mandatory compliance and any OEM service requirements (FITECH Rim Seal systems) to ensure compatibility and warranty protection
  • Expected deliverables: Regular maintenance visits, replacement of wear components, reactive service; availability of engineer per diem rates
  • Location: Tender in India; precise geographic coverage not disclosed in available data

Terms & Eligibility

  • EMD: Not published in provided data; verify in ATC terms and conditions
  • Payment terms: Monthly AMC settlements; per diem engineer charges applicable as per contract
  • Documents: GST registration, PAN, OEM authorizations (if required), technical compliance documents, financial statements, prior AMC experience certificates
  • Delivery/timeframe: Service cadence implied as ongoing monthly contract; response times to service requests should be defined in ATC
  • Penalties/Warranty: Not specified in data; bidders must consult ATC for LD and warranty conditions
  • Experience: Vendors with capability to service pre-owned Rim Seal systems and provide engineer-per-diem arrangements

Key Specifications

  • Product/service names: Customized AMC/CMC for Pre-owned FITECH Rim Seal Systems

  • Quantities/values: Not published; contract-based monthly servicing

  • EMD/estimated value: Not disclosed in provided data

  • Experience: Required capability to maintain pre-owned rim seal systems

  • Quality/standards: Specific standards not published; refer to ATC for OEM/quality requirements

  • Warranty/AMC terms: Not specified; ATC will define warranty/maintenance terms

  • Delivery/installation: On-site engineering visits under per diem and monthly AMC terms

Terms & Conditions

  • EMD amount and payment milestones to be confirmed in ATC

  • Monthly AMC with per diem engineer charges; delivery is ongoing service

  • Review OEM authorizations and service capabilities for FITECH Rim Seal Systems

Important Clauses

Payment Terms

Monthly AMC payments with per diem charges for on-site engineers; exact percentages and schedule to be defined in ATC

Delivery Schedule

Ongoing on-site maintenance visits; response times and visit cadence to be specified in ATC

Penalties/Liquidated Damages

LD terms, if any, to be detailed in ATC; bidders should verify service level penalties

Bidder Eligibility

  • Experience maintaining pre-owned Rim Seal or equivalent systems

  • Compliance with OEM service requirements for FITECH Rim Seal Systems

  • Ability to provide engineer-per-diem and monthly AMC servicing

Advertisement

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Customized AMC/CMC for Pre-owned Products - AMC OF FITECH RIM SEAL SYSTEMS; Per diem charges for Engineer; Annual Maintenance Contract (AMC); Monthly; Yes

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Visakhapatanam

Delivery Pincodes

530011

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Milind Barman530011,HPCL, Visakh Refinery, PB No. 15, Malkapuram, Visakhapatnam-530011VisakhapatanamAndhra Pradesh5300111-Number of months within the contract period for which service is required : 36

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9902388.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 6

Advertisement

Corrigendum Updates

1 Update
#1

Update

29-Sep-2026

Extended Deadline

03-Oct-2026, 4:30 am

Opening Date

04-Oct-2026, 4:30 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar AMC/CMC of rim seal or related systems

4

Financial statements (latest) demonstrating financial stability

5

EMD/Security deposit documents (as applicable per ATC)

6

Technical bid documents detailing service capabilities and engineer-per-diem rates

7

OEM authorizations or proof of service eligibility for FITECH Rim Seal Systems

8

Any other documents mandated in the uploaded ATC

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for HPCL AMC for pre-owned Rim Seal systems in India 2026

Bidders should review the uploaded ATC, prepare documentation as per terms, and submit GST, PAN, experience certificates, OEM authorizations, and financial statements. Include proposed monthly AMC rates and per diem engineer charges, ensuring compliance with FITECH Rim Seal system service requirements.

What documents are required for HPCL Rim Seal AMC tender submission

Required documents include GST registration, PAN card, current and past experience certificates for similar AMC work, latest financial statements, EMD documentation as per ATC, technical compliance details, and OEM authorization proving service capability for FITECH Rim Seal systems.

What are the technical specifications for FITECH Rim Seal AMC services

No explicit technical specs are published; bidders must refer to the ATC for OEM service standards, required maintenance activities, and any warranty conditions. Ensure on-site engineer availability and compliance with Rim Seal system maintenance protocols.

When is the delivery and service start date for HPCL Rim Seal AMC

The tender indicates ongoing monthly service but does not publish a fixed start date. Respondents should align with ATC-defined kickoff and schedule fixture, and ensure resources are ready for immediate deployment after award.

What are the payment terms for HPCL Rim Seal AMC contract

Payments are on a monthly AMC basis, with additional per diem charges for on-site engineers. Exact payment schedule, invoicing milestones, and any advance/retention terms will be defined in the ATC.

What experience is required for bidding on HPCL Rim Seal AMC

Bidders must demonstrate experience in maintaining pre-owned Rim Seal or comparable systems, provide OEM authorization if required, and show capability to supply on-site engineer-per-diem and monthly maintenance services as per ATC.

What standards or certifications are needed for HPCL Rim Seal AMC

The ATC will specify applicable OEM service standards and any certification requirements. At minimum, bidders should confirm capability to comply with Rim Seal system maintenance guidelines and any ISO/quality expectations stated by the ATC.

Advertisement