Progress
Quantity
272
Bid Type
Two Packet Bid
Mormugao Port Trust has released a public tender for Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pipes drain pipes powe supply cables insulating foam wrapping tape, InstallationTesting and commissioning of above AC, Extra Copper pipes for above AC TOTAL 40 mtrs, Extra Insulation foam suitable for above copper pipes TOTAL 40 mtrs, Extra Drain pipes for above AC TOTAL 40 mtrs, Extra Power supply cables for above AC TOTAL 40 mtrs, Extra Wrapping tape for above AC TOTAL 100 mtrs, Metal mounting brackets powder coated suitable for floor mounting of outdoor unit in SOUTH GOA, GOA. Quantity: 272. Submission Deadline: 25-03-2025 13: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pipes drain pipes powe supply cables insulating foam wrapping tape , InstallationTesting and commissioning of above AC , Extra Copper pipes for above AC TOTAL 40 mtrs , Extra Insulation foam suitable for above copper pipes TOTAL 40 mtrs , Extra Drain pipes for above AC TOTAL 40 mtrs , Extra Power supply cables for above AC TOTAL 40 mtrs , Extra Wrapping tape for above AC TOTAL 100 mtrs , Metal mounting brackets powder coated suitable for floor mounting of outdoor unit
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pipes drain pipes powe supply cables insulating foam wrapping tape
3 star rated single phase 2TR invetor tower AC
InstallationTesting and commissioning of above AC
InstallationTesting and commissioning of above AC
Extra Copper pipes for above AC TOTAL 40 mtrs
Copper pipes for above AC TOTAL 40 MTRS
Extra Insulation foam suitable for above copper pipes TOTAL 40 mtrs
Extra Insulation foam suitable for above copper pipes TOTAL 40 mtrs
Extra Drain pipes for above AC TOTAL 40 mtrs
Drain pipes for above AC TOTAL 40 mtrs
Extra Power supply cables for above AC TOTAL 40 mtrs
Power supply cables for above AC TOTAL 40 mtrs
Extra Wrapping tape for above AC TOTAL 100 mtrs
Wrapping tape for above AC TOTAL 100 mtrs
Metal mounting brackets powder coated suitable for floor mounting of outdoor unit
Metal mounting brackets powder coated suitable for floor mounting of outdoor unit
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pipes drain pipes powe supply cables insulating foam wrapping tape | 3 star rated single phase 2TR invetor tower AC | 4 | nos | suraj.dessain | 30 | |
| 2 | InstallationTesting and commissioning of above AC | InstallationTesting and commissioning of above AC | 4 | nos | suraj.dessain | 30 | |
| 3 | Extra Copper pipes for above AC TOTAL 40 mtrs | Copper pipes for above AC TOTAL 40 MTRS | 40 | mtrs | suraj.dessain | 30 | |
| 4 | Extra Insulation foam suitable for above copper pipes TOTAL 40 mtrs | Extra Insulation foam suitable for above copper pipes TOTAL 40 mtrs | 40 | mtrs | suraj.dessain | 30 | |
| 5 | Extra Drain pipes for above AC TOTAL 40 mtrs | Drain pipes for above AC TOTAL 40 mtrs | 40 | mtrs | suraj.dessain | 30 | |
| 6 | Extra Power supply cables for above AC TOTAL 40 mtrs | Power supply cables for above AC TOTAL 40 mtrs | 40 | mtrs | suraj.dessain | 30 | |
| 7 | Extra Wrapping tape for above AC TOTAL 100 mtrs | Wrapping tape for above AC TOTAL 100 mtrs | 100 | mtrs | suraj.dessain | 30 | |
| 8 | Metal mounting brackets powder coated suitable for floor mounting of outdoor unit | Metal mounting brackets powder coated suitable for floor mounting of outdoor unit | 4 | nos | suraj.dessain | 30 |
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | COMCAT Under PMA | - | 25-03-2025 11:08:14 | |
| 2 | M/S UNIK RAJDHANI ELECTRONICS & SERVICE CENTRE Under PMA | - | 21-03-2025 15:59:25 | |
| 3 | RANE TRADING COMPANY Under PMA | - | 12-03-2025 18:14:03 | |
| 4 | SN MARINE SERVICES Under PMA | - | 25-03-2025 09:50:57 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | COMCAT(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pip | |
| L2 | SN MARINE SERVICES (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pip | |
| L3 | RANE TRADING COMPANY (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Supply of 2 TR invertor type 3 star Tower AC with metal mounting brackets 3 mtrs each of copper pip |
Key insights about GOA tender market
The eligibility requirements include being a registered entity, demonstrating relevant experience in supplying air conditioning systems, and complying with the regulatory standards in the HVAC industry. Bidders should provide proof of registration and any relevant documentation that highlights their prior engagements in similar projects.
The technical specifications require that the AC units are rated as 2 TR Invertor Type 3 Star for energy efficiency. Additional components include metal mounting brackets, 40 meters of copper pipes, insulation foam, drain pipes, extra power supply cables, and wrapping tape. Each component is vital for the installation and operational efficiency of the units.
The Earnest Money Deposit (EMD) details specify that bidders must submit a financial guarantee reflecting their commitment to the tender. The amount is usually determined based on the bid value, which will be returned upon completion of the tender execution or if the bidder fails to comply with the requirements.
Bids should be submitted electronically through the designated portal or in the physical format as outlined in the tender documentation. Ensure that the complete set of required documents is included, and follow any key timelines and deadlines highlighted in the tender for an effective submission.
MSEs are granted specific advantages, such as relaxed eligibility criteria and potential price preference during the evaluation process. Compliance with 'Make in India' initiatives also encourages local content and procurement support for startups and small enterprises aiming to promote domestic manufacturing and services.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS