Overhauling of Rotary pump assy tata,Overhauling of Fuel Injection pump of ALS,Repair of Drive shaf
Indian Army
KUPWARA, JAMMU & KASHMIR
Progress
Quantity
23
Category
Complete Overhauling of Eng Assy
Bid Type
Single Packet Bid
Organization: Indian Army, Department Of Military Affairs. procure a comprehensive overhaul package encompassing complete engine overhauling, replacement of rocker arm, timing belt cam oil seal, overhaul of overflow pipe vacuum pump packing and coolant hose, rectification of oil leakage from crank shaft, repair/overhauling of the AC system, evaporator cleaning, and front wheel disc skimming. Location unspecified; estimated value and EMD are not disclosed. The scope consolidates multiple mechanical and HVAC tasks into a single contract, with a single set of terms. The option clause permits quantity adjustments up to ±25% and extended delivery timelines at contracted rates, with delivery time calculation rules. A unique capability here is integrating both powertrain and climate-control refurbishments under one procurement, reducing fragmentation for the Indian Army. This tender emphasizes mechanical reliability and road-ready performance for frontline equipment.
Scope: complete engine overhaul
Scope: rocker arm replacement
Scope: timing belt cam oil seal replacement
Scope: overflow pipe vacuum pump packing and coolant hose replacement
Scope: rectification of oil leakage from crank shaft
Scope: repair/overhaul of AC system and evaporator breezing
Scope: front wheel disc skimming
BOQ: 7 items with unspecified quantities
Delivery: option clause allows ±25% quantity adjustment
Quantity may be increased or decreased by up to 25% at contract time
Delivery period starts after the last date of the original delivery order
Extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
Please refer to final tender; no explicit payment terms were stated in the provided data.
Delivery period commencement from the last date of the original delivery order; extended period rules apply with a minimum 30 days.
No LD details provided in the supplied data; bidders should check final tender for penalties or warranty terms.
Experience in complete mechanical overhaul of engines and HVAC systems
Demonstrated capability to handle front wheel disc skimming services
Compliance with GST, PAN and OEM authorization requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
HYDERABAD, TELANGANA
Indian Army
MUMBAI, MAHARASHTRA
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Complete Overhauling of Eng Assy | Complete Overhauling of Eng Assy | 1 | nos | tssbuyer@844 | 20 |
| 2 | Replacement of Rocker Arm and Bullets | Replacement of Rocker Arm and Bullets | 16 | nos | tssbuyer@844 | 20 |
| 3 | Replacement of Timming Belt Cam Oil Seal Over Flow Pipe Vaccume Pump Packing and Coolent Hose | Replacement of Timming Belt Cam Oil Seal Over Flow Pipe Vaccume Pump Packing and Coolent Hose | 1 | nos | tssbuyer@844 | 20 |
| 4 | Rectification of Oil leakage from Crank Shaft | Rectification of Oil leakage from Crank Shaft | 1 | nos | tssbuyer@844 | 20 |
| 5 | Repair and Overhauling of AC System | Repair and Overhauling of AC System | 1 | nos | tssbuyer@844 | 20 |
| 6 | Breezing of AC evaporator | Breezing of AC evaporator | 1 | nos | tssbuyer@844 | 20 |
| 7 | Front Wheel Disc Skimming | Front Wheel Disc Skimming | 2 | nos | tssbuyer@844 | 20 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar overhaul projects
Financial statements / bank statements
EMD payment proof
Technical bid submission documents
OEM authorization / dealership certificates (if applicable)
Any prior maintenance/repair certifications relevant to engine and HVAC work
Key insights about TELANGANA tender market
Bidders must submit GST registration, PAN card, experience certificates for similar overhaul work, financial statements, EMD proof, technical bid documents, and OEM authorizations. Additional documents may include project details and warranty terms. Ensure all documents align with the buyer's terms and are valid during the bid period.
The purchaser may increase or decrease ordered quantity by up to 25% at contract placement and during the currency of the contract at contracted rates. The delivery extension uses a formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
Delivery starts from the last date of the original delivery order. If the option clause is exercised, the new delivery period follows the calculated extension formula, with a guaranteed minimum of 30 days extra time. Ensure capability to scale production and scheduling accordingly.
Scope includes complete engine overhaul, rocker arm replacement, timing belt cam oil seal replacement, overflow pipe vacuum pump packing, coolant hose replacement, crank shaft oil leakage rectification, AC system repair/overhaul, evaporator breezing, and front wheel disc skimming. Quantities are not detailed in the provided data.
The tender data mentions ISI/ISO-type standards in general language but does not specify exact standards. Vendors should verify final tender documents for mandatory certifications and ensure ISO 9001 and any OEM-specific approvals are in place if required by the awarding authority.
The provided data does not include a bid submission deadline. Bidders must obtain the official tender documentation to confirm the final submission date, format, and any pre-bid meeting requirements, along with exact EMD and technical bid deadlines.
Specific payment terms are not disclosed in the data. Prepare to align with standard government practices: submit invoices post-delivery, provide compliant tax certificates, and anticipate milestone-based payments or sequential payments upon acceptance, subject to final terms in the awarded contract.
Eligibility includes demonstrated capability in heavy mechanical overhaul and HVAC repairs, GST and PAN compliance, financial stability, and OEM authorization if OEM-specific parts are required. Ensure experience certificates cover similar engine and climate-control refurbishments.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS