TenderDekho Logo
Active GEM

Indian Army Grocery Display Steel Rack Tender Alwar Rajasthan 5x3 ft 20 racks 2026

Bid Publish Date

07-Oct-2026, 8:46 pm

Bid End Date

17-Oct-2026, 9:00 pm

Progress

Issue07-Oct-2026, 8:46 pm
AwardPending

Tender Overview

Organization: Indian Army (Department Of Military Affairs) in Alwar, Rajasthan. Procures grocery display steel racks 5x3 ft with installation for a bulk quantity of 20 racks. Scope includes supply, delivery, and on-site installation, with site survey by an authorised representative prior to bulk supply. Main differentiators include MS/steel construction with powder-coated finish, and adherence to BOQ/technical specifications. The tender allows quantity variation up to 25% during contract and extended delivery time under the option clause, with delivery timing linked to the last date of the original/delivered order. Unique ATC emphasizes pre-installation site verification and robust loading capability.

Technical Specifications & Requirements

  • Product category: Grocery display steel racks, dimensions 5x3 ft per unit.
  • Quantity: 20 racks to be supplied, installed and tested on site.
  • Material: New MS/steel with robust construction for continuous commercial use; no refurbished material.
  • Finish: Powder coating, rust/abrasion resistant, uniform finish, no sharp edges.
  • Structure: Uprights, beams, shelves conform to minimum thickness; load-bearing capacity per shelf defined in BOQ; ensure no sagging or deformation.
  • Quality & Safety: Proper bracing, level installation, stability for specified loads; site survey before bulk supply.
  • Inspection: Material thickness verification during inspection; deviations require authorised approval.
  • Other: Dimensional/configuration compliance with BOQ/technical specs; deviations require approval.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% during contract; extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, with minimum 30 days.
  • Delivery & Installation: Supply, delivery, and installation/assembly of 20 racks; site survey by authorised representative prior to bulk supply.
  • Materials: New MS/steel; powder-coated finish; no used materials.
  • Documentation: Compliance with site measurement and quality checks; alteration requires authorised approval.
  • Warranty/Penalties: Not explicitly mentioned in data; penalties would align with standard supply contracts under ATC.

Key Specifications

    • Product: Grocery display steel racks (5x3 ft)
    • Quantity: 20 racks
    • Material: New MS/steel with powder coating
    • Finish: Powder coated, rust/abrasion resistant
    • Structure: Uprights, beams, shelves with minimum thickness; load-bearing per shelf per BOQ
    • Site: Pre-installation site survey by authorised representative

Terms & Conditions

  • Option to vary quantity up to 25% during contract

  • Delivery period linked to original/extended orders with minimum 30 days

  • Site survey required before bulk supply

  • Material to be new MS/steel with powder coating

  • Compliance with BOQ/technical specs and approvals for deviations

Important Clauses

Payment Terms

Not explicitly detailed in data; typical terms imply milestone-based payments post-delivery and installation per ATC.

Delivery Schedule

Delivery period begins from last date of original delivery order; option-based extension uses calculated time with minimum 30 days.

Penalties/Liquidated Damages

Not specified; implied under standard supply contracts with ATC; confirm during bid submission.

Bidder Eligibility

  • Experience in supplying and installing metal display racks or equivalent fixtures

  • Demonstrated capability to perform on-site installation and site survey

  • Financial stability evidenced by audited statements and GST conformity

Advertisement

Tender Data

Bid Details

Quantity

20

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Grocery display steel rack 5x3 ft

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Alwar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AlwarAlwar--2015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10001288.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (similar rack/display projects)

4

Financial statements (audited) / Turnover documentation

5

EMD/Security deposit documents (if applicable per ATC)

6

Technical bid documents confirming MS/steel rack specs

7

OEM authorization (if applicable for brand/specification)

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for grocery display rack tender in Alwar Rajasthan 2026?

To bid, ensure supply of 20 racks of 5x3 ft MS steel with powder coating, provide site survey capability, confirm adherence to BOQ specs, and submit GST, PAN, turnover, and experience certificates. Adhere to option clause allowing up to 25% quantity variation and confirm delivery timelines per ATC terms.

What documents are required for the Indian Army rack tender in Rajasthan?

Submit GST certificate, PAN card, experience certificates of similar display rack projects, audited financial statements, and OEM authorizations if applicable. Include technical bid detailing MS/steel rack specs and powder coating finish as per BOQ.

What are the technical specifications for the 5x3 ft racks in this bid?

Racks must be new MS/steel, powder-coated, with uprights, shelves and beams meeting minimum thickness; each shelf must support designated load per BOQ without deformation; site survey required before bulk supply; installation must be level and stable.

What is the delivery window and extension rule for this tender?

Delivery begins after the original order date and may extend by up to 25% of contracted quantity; if extended, the time is calculated as (additional/ original) × original period, minimum 30 days. Ensure alignment with site survey findings.

What are the EMD and payment terms for the rack procurement?

EMD amount is not specified in the data; payment terms are not detailed here; bidders should await ATC clarifications and prepare standard bid security and compliance documents per procurement rules.

How is site survey integrated into the rack installation process?

An authorised representative must perform a site survey to confirm area measurements and final rack placement before bulk supply; deviations from the approved configuration require prior authorisation.

What brand or OEM requirements exist for the display racks?

Brand/OEM requirements are not explicitly stated; if applicable, provide OEM authorization and ensure material and finish meet specified MS/steel and powder coating standards.

Which standards apply to the rack finish and safety features?

Finish must be powder-coated for rust and abrasion resistance; structural stability requires proper bracing and level installation; load-bearing per shelf must meet BOQ values to prevent sagging.

Advertisement