Procurement Opportunity: Excavation of earth,Backfilling of earth,Sup,lay of cable 3X300 SQ mm 11KV UG ARM,Sup and lay of200 in MADURAI, TAMIL NADU

Bid Publish Date

12-Aug-2026, 10:38 am

Bid End Date

02-Sep-2026, 11:00 am

EMD

₹2,37,412

Progress

Issue12-Aug-2026, 10:38 am
Corrigendum26-Aug-2026
AwardPending

Hindustan Petroleum Corporation Ltd has released a public tender for Excavation of earth, Backfilling of earth, Sup, lay of cable 3X300 SQ mm 11KV UG ARM, Sup and lay of200mm, NP4, RCC Hume Pipe, Termination Kit, Sup and Lay GI pipe, 160 mm, Sup, Inst Danger Board, S_I_T_C Double Pole Structure, RCC M 25, Shifting of Material, Liasioning with TNEB, S_I_T_C 100KVA 1Kv _433volts energy Effi, S_I_T_C Single Pole Structure, Supervision Charges TNEB, Sup and Lay Cable 19 _ 14 CTS, 50 Sq mm in MADURAI, TAMIL NADU. Quantity: 151054. Submission Deadline: 02-09-2026 11: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

151054

Category

Sup,lay of cable 3X300 SQ mm 11KV UG ARM

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Excavation of earth , Backfilling of earth , Sup,lay of cable 3X300 SQ mm 11KV UG ARM , Sup and lay of200mm, NP4, RCC Hume Pipe , Termination Kit , Sup and Lay GI pipe, 160 mm , Sup, Inst Danger Board , S_I_T_C Double Pole Structure , RCC M 25 , Shifting of Material , Liasioning with TNEB , S_I_T_C 100KVA 1Kv _433volts energy Effi , S_I_T_C Single Pole Structure , Supervision Charges TNEB , Sup and Lay Cable 19 _ 14 _CTS_, 50 Sq mm

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

28

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Madurai

Delivery Pincodes

625008

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vetsa Vivek625008,HPCL, Madurai-IRD PLOT 167-172, SOUTH PHASE SIDCO INDUSTRIAL ESTATE KAPPALUR MADURAI - 625008MaduraiTamil Nadu62500810060-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9743302.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

26-Aug-2026

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Excavation of earth

Excavation of earth

100 m3 Delivery: 60 days
#2

Backfilling of earth

Backfilling of earth

150 m3 Delivery: 60 days
#3

Sup,lay of cable 3X300 SQ mm 11KV UG ARM

Sup,lay of cable 3X300 SQ mm 11KV UG ARM

360 m Delivery: 60 days
#4

Sup and lay of200mm, NP4, RCC Hume Pipe

Sup and lay of200mm, NP4, RCC Hume Pipe

160 m Delivery: 60 days
#5

Termination Kit

Termination Kit

8 each Delivery: 60 days
#6

Sup and Lay GI pipe, 160 mm

Sup and Lay GI pipe, 160 mm

80 m Delivery: 60 days
#7

Sup, Inst Danger Board

Sup, Inst Danger Board

4 each Delivery: 60 days
#8

S_I_T_C Double Pole Structure

S_I_T_C Double Pole Structure

4 each Delivery: 60 days
#9

RCC M 25

RCC M 25

15 m3 Delivery: 60 days
#10

Shifting of Material

Shifting of Material

6 lumpsum Delivery: 60 days
#11

Liasioning with TNEB

Liasioning with TNEB

5 lumpsum Delivery: 60 days
#12

S_I_T_C 100KVA 1Kv _433volts energy Effi

S_I_T_C 100KVA 1Kv _433volts energy Effi

1 each Delivery: 60 days
#13

S_I_T_C Single Pole Structure

S_I_T_C Single Pole Structure

1 lumpsum Delivery: 60 days
#14

Supervision Charges TNEB

Supervision Charges TNEB

150,000 each Delivery: 60 days
#15

Sup and Lay Cable 19 _ 14 _CTS_, 50 Sq mm

Sup and Lay Cable 19 _ 14 _CTS_, 50 Sq mm

160 m Delivery: 60 days

Categories 20

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer