UPRVUNL Lucknow Impeller with Root Stiffener 13 Blades AN25E6 for ID Fan Tender 2026

Bid Publish Date

19-Oct-2026, 6:51 pm

Bid End Date

29-Oct-2026, 7:00 pm

Progress

Issue19-Oct-2026, 6:51 pm
AwardPending

Tender Overview

Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Product/Service: Impeller with root stiffener having 13 blades for ID Fan AN25E6 installed at 200MW units. Location: Sonbhadra, Uttar Pradesh, 231205. Estimated value and EMD are not disclosed in the available data. The tender references a quantity option clause allowing up to 25% increase/decrease at contracted rates. Unique aspect lies in the specific impeller configuration for a high-capacity stage in a thermal power setting. The ATC terms must be respected; BOQ is not provided. Tender is positioned under the Energy Department governance.

Technical Specifications & Requirements

  • Product: Impeller with Root Stiffener, 13 blades, for ID Fan AN25E6.
  • Unit context: Installed at a 200MW unit in Uttar Pradesh.
  • Delivery/quantity dynamics: Option clause permits up to 25% quantity variation during contract; delivery period starts from the last date of the original delivery order; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Standards/Compliance: Not specified in the tender data; bidders should anticipate ATC terms and standard procurement compliance.
  • BOQ status: No items listed; no technical specs beyond blade count and model reference.
  • ATC considerations: Buyer-added terms require bidder compliance with option-quantity and delivery-time rules; verify OEM compatibility for AN25E6 impellers.

Terms, Conditions & Eligibility

  • EMD/Financial terms: Specific EMD amount is not disclosed in the provided data; bidders should seek ATC document for exact figures.
  • Delivery timeline: Not concretely defined; extended delivery time rules are provided via the option clause and original delivery period references.
  • Payment terms: Not specified in the data; ATC may define payment modalities.
  • Documents: Prepare GST certificate, PAN card, experience certificates, financial statements, technical compliance details, OEM authorizations per typical government tenders. Ensure submission aligns with Buyer Added Terms and the ATC document.

Key Specifications

  • Product/service names: Impeller with Root Stiffener for ID Fan, 13 blades; model AN25E6; used in 200MW unit

  • Quantities/estimates: Not disclosed; quantity variation allowed up to 25% as per option clause

  • EMD/Value: Not disclosed in tender data; check ATC for exact amount

  • Delivery/installation: Delivery period starts from last date of original delivery order; extended period uses formula with minimum 30 days

  • Standards/Quality: No specific standards listed; bidders must rely on ATC and standard government procurement compliance

  • OEM/Brand: Specific model AN25E6; ensure compatibility with existing ID Fan configuration

Terms & Conditions

  • Option clause allows ±25% quantity variation at contracted rates

  • Delivery period begins after last date of original order; extended time follows calculated formula

  • No explicit EMD/value or payment terms in data; refer to ATC for exact requirements

Important Clauses

Payment Terms

Not disclosed in the available data; bidders must consult ATC for exact payment schedule and milestones

Delivery Schedule

Delivery timeline anchored to last date of original delivery order; additional time follows ( Increased quantity / Original quantity ) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Details not provided; ATC may specify LD clauses in the final contract

Bidder Eligibility

  • Experience in supplying high-precision impeller components for ID Fans in thermal power plants

  • Demonstrated capability to handle 200MW-class unit assemblies and compatible with AN25E6 configurations

  • Compliance with typical state/central government procurement, GST registration, and financial stability prerequisites

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Impeller (with Root Stiffener having 13 Blades) of ID Fan AN25E6 installed at 200MW units

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shatrughan Singh231219,Obra Thermal Power PlantSonbhadraUttar Pradesh2312191180-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10054315.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Categories 18

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for impeller with root stiffener in Sonbhadra tender?

Bidders should review the ATC terms, prepare OEM authorization, GST, PAN, and financials, and submit technical and commercial bids. The specific model AN25E6 and 13-blade impeller details must be matched with the ID Fan configuration. Ensure adherence to the 25% quantity variation clause and verify delivery timelines per original and extended periods.

What documents are required for Uttar Pradesh power impeller tender in 2026?

Prepare GST certificate, PAN card, experience certificates showing relevant ID Fan impeller supply, financial statements, EMD documentation (as per ATC), technical bid with OEM authorization, and any ISI/ISO certifications specified in the ATC. Submit originals or certified copies as per tender rules.

What are the technical specifications for AN25E6 ID Fan impeller in UP?

Technical data confirms 13-blade impeller with root stiffener for ID Fan AN25E6 used in a 200MW unit. No additional blade geometry, material, or finish specs are disclosed in the current tender data; verify compatibility with existing rotor assembly and ensure OEM conformity during bid submission.

When is the delivery period for the UP impeller procurement?

Delivery starts from the last date of the original delivery order, with possible extension calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days. The final delivery timeline will be defined in the contract and ATC; bidders should plan buffers for 25% quantity variation.

What are the EMD requirements for this UP power tender?

The tender data does not disclose a specific EMD amount. Bidders must refer to the ATC document for the exact EMD requirement, payment mode (DD/online), and whether any bid security is mandated beyond standard government practices.

What standards or certifications are required for the impeller tender in Uttar Pradesh?

No explicit standards are listed in the provided data. Prepare OEM authorizations and common compliance documents; ATC may mandate ISI/ISO credentials or other quality certifications. Ensure the item configuration matches the AN25E6 impeller for a 200MW ID Fan.

How to verify eligibility for the UP government impeller procurement?

Confirm experience in supplying ID Fan components for thermal plants, demonstrate financial stability with statements, and provide GST/PAN. Comply with the option clause for quantity variation and submit technical bids showing OEM alignment to AN25E6 specifications per ATC.

What is the scope of the 25% option clause for this tender?

The purchaser may increase or decrease the quantity up to 25% at bid quantities, and during currency up to 25% more at contracted rates. Delivery time adjusts proportionally to increased quantity with a minimum 30 days added; ensure pricing reflects these flexibilities.