TenderDekho Logo
GEM

South East Central Railway Handloom Towels Tender Raipur Chhattisgarh 2026 IS 854 Q2

Bid Publish Date

12-May-2026, 12:29 pm

Bid End Date

06-Jun-2026, 10:00 am

Generate Docs

Progress

Issue12-May-2026, 12:29 pm
Corrigendum03-Jun-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2981

Bid Type

Single Packet Bid

Tender Overview

The South East Central Railway (Raipur, Chhattisgarh) seeks supply of handloom cotton towels—Turkish, Honeycomb and Huckaback—conforming to IS 854 (Q2) with BIS certification. The procurement scope is a pure supply contract for bulk goods, with note of advance sample submission prior to bulk production and buyer-driven sample approvals. The option clause allows quantity variations up to ±25% during contract execution, with delivery timing tied to the original or extended delivery periods. The tender emphasizes brand-new towels and conformity verification via NABL/ILAC or Central Government labs on demand, and requires Handloom Mark branding and BIS-compliant standards.

Technical Specifications & Requirements

Critical technical details include: IS 854 (Q2) towel category; ground-to-pile considerations excluded for Turkish towels; exact Size (cm x cm), Weight (gm/m2), and Color specifications; weave type; presence of Handloom Mark and Logo/Totem; Logo/Marking requirements; NABL/ILAC or Central Lab test reports (availability and on-demand provision); advance sample submission within 15 days of award and 7-day modification window; BIS certification; Towel Type and material quality compliance; and clear acceptance criteria at buyer inspection (post-receipt).

Terms, Conditions & Eligibility

Key terms include: quantity variation up to 25% during/after award; scope restricted to “Only supply of Goods”; post-receipt inspection by the consignee; advance sample submission before bulk manufacture with 2 samples within 15 days of contract award; approvals or modifications within 7 days; failure to approve may trigger contract termination; and pre-shipment/inspection modalities defined. Ensure BIS certification, NABL/ILAC lab conformity, brand markings, and compliance with tender terms.

Key Specifications

    • Product category: Handloom Cotton Towels (Turkish, Honeycomb, Huckaback) conforming to IS 854 (Q2)
    • Standards: BIS Certification required; NABL/ILAC accredited or Central Government Lab test reports for conformity
    • Size: exact Length x Width (cm) to be specified in BOQ; ensure compliant format
    • Mass/GRAMSM2: specified variety by Mass (e.g., g/m2) for each towel type
    • Color: specified color(s) per tender
    • Weave: weave type per towel category; Turkish towels may exclude ground-to-pile ratio
    • Logo/Marking: required Logo/Totem and Handloom Mark stamping
    • Advance sample: 2 samples within 15 days of award; approval within 7 days; modifications if required
    • Testing: on-demand test reports; provide NABL/ILAC or Central Lab conformity

Terms & Conditions

  • Option to increase/decrease quantity by up to 25% at contract placement and during currency

  • Supply scope limited to goods; no installation services

  • Advance samples required; delays in approval adjust delivery timeline without LD

Important Clauses

Payment Terms

Not specified in tender data; ensure clarification during bid submission and align with contract terms.

Delivery Schedule

Delivery period linked to original delivery order; extended time calculated by formula and minimum 30 days; option-quantity extension may impact timeline.

Penalties/Liquidated Damages

Not detailed in provided terms; bidders should seek explicit LD/penalty clauses during ATC finalization.

Bidder Eligibility

  • Experience in supplying handloom textiles or towels to government entities

  • Demonstrated BIS certification and NABL/ILAC-compliant testing proof

  • Financial capability per tender norms (statements and turnover expectations)

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854 (Q2)

Authority Records

MINISTRY OF RAILWAYS
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9309323.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

South East Central Railway

RAIPUR, CHHATTISGARH

Posted: 30 January 2025
Closed: 11 February 2025
GEM

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

National Aluminium Company Limited, Bhubaneswar

KORAPUT, ODISHA

Posted: 5 August 2025
Closed: 27 August 2025
GEM

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

South Eastern Railway

Posted: 30 July 2025
Closed: 9 September 2025
GEM

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

North Eastern Railway

GORAKHPUR, UTTAR PRADESH

Posted: 25 August 2025
Closed: 15 September 2025
GEM

South Eastern Railway Handloom Cotton Turkish Towels Procurement IS 854 Q2 2025

South Eastern Railway

Posted: 21 November 2025
Closed: 20 December 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Certification BIS Certification No
Manufacturing/Material Towel Type Honeycomb Towel
Manufacturing/Material Variety No, Mass (gram per square meter) Variety No-3, 220g
Size Size (Length x Width) (cm x cm) 155 x 80
Color Color White
Weave Weave 4-End Honeycomb
Other Requirement Ground to Pile Ratio ( Not Applicable for towel other than Turkish Towel) Not Applicable
Logo and Marking Logo/ Totem Size, Design, Type and Location of Logo(s) as per buyer's requirement
Logo and Marking Handloom Mark Yes
Test Report Availability of Test Report from NABL/ ILAC accredited or Central Government Lab to prove conformity of products to the specification Yes
Test Report Test reports to be furnished to buyer on demand, if claimed to be available (hint: Not applicable if Test Report is not available) Yes
Advance Sample Agree to provide Advance Sample(s) for buyer's approval before commencement of bulk manufacture and supply ( Applicable in case of orders placed against bid and not applicable in case of Direct Buying) Yes

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates (similar towel supply/projects)

4

Financial statements (last 3 years or as specified)

5

EMD documents (if applicable) or exempt clause

6

Technical bid documents showing BIS certification and NABL/ILAC test proof

7

OEM authorization/copy of manufacturer authorization (if bidding as reseller)

8

Advance sample submission plan (2 samples within 15 days of award)

Corrigendum Updates

2 Updates
#1

Update

03-Jun-2026

Extended Deadline

06-Jun-2026, 10:00 am

Opening Date

06-Jun-2026, 10:30 am

#2

Update

25-May-2026

Extended Deadline

29-May-2026, 10:00 am

Opening Date

29-May-2026, 10:30 am

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for handloom towels tender in Raipur 2026?

Bidders must submit GST, PAN, financials, experience certificates, and technical bid with BIS certification plus NABL/ILAC test proof. Ensure advance samples (2 units) within 15 days of award and obtain buyer approval within 7 days. Follow option clause for quantity changes up to 25% and provide post-delivery inspection readiness.

What documents are required for IS 854 towel tender in Chhattisgarh?

Required documents include GST registration, PAN, 3-year financial statements, experience certificates for towel supply, BIS certification, NABL/ILAC conformity reports, OEM authorization, and samples plan for advance approval within 15 days of award.

What are the essential standards for Towels tender in Raipur?

Tenders require IS 854 (Q2) compliance, BIS certification, and test reports from NABL/ILAC accredited labs or Central Government labs. Advance samples must be submitted, and logo/handloom markings plus Handloom Mark must be present on products.

When is sample submission and approval required for the towel order?

Within 15 days of contract award, submit two advance samples. Buyer will approve or specify modifications within 7 days; bulk supply must align with approved sample, else delivery timeline may be adjusted without LD.

What is the delivery framework for quantity variation in this towel tender?

The buyer may increase or decrease quantity by up to 25% at contract placement and during currency. Delivery timing follows the original period or extended period; additional time is calculated by (increased quantity / original quantity) × original delivery days, minimum 30 days.

What are the logo and handloom marking requirements for towels?

Products must bear a Logo/Totem and the Handloom Mark as specified. Ensure branding aligns with buyer guidelines and that marks are visible on the final delivered towels.

What happens if NABL/ILAC test reports are not available?

If reports are not available, bidders should indicate alternatives or status. Buyer may request conformity evidence; failure to provide acceptable test results could affect bid evaluation and contract award.

Which organization conducts inspection before acceptance of towel stores?

Post-receipt inspection is conducted at the consignee site by the buyer. Pre-dispatch inspection at seller premises is not indicated; ensure readiness for post-receipt checks and conformity per IS 854 standards.

Similar Tenders

5 found
Urgent

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

Oil And Natural Gas Corporation Limited

📍 GANDHI NAGAR, GUJARAT

EMD: ₹44,920
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

Southern Railway

📍 ERODE, TAMIL NADU

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

Diesel Loco Modernisation Works

📍 PATIALA, PUNJAB

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854

Nuclear Power Corporation Of India Limited

📍 CHITTORGARH, RAJASTHAN

EMD: ₹19,000
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Handloom Cotton Turkish, Honeycomb and Huckaback Towels (V2) as per IS 854,Handloom Cotton Bed Shee

Indian Army

📍 JHANSI, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us