Customized AMC/CMC for Pre-owned Products - Providing Installing And Testing Off Grid Solar Power
Kolhapur District Panchayats
KOLHAPUR, MAHARASHTRA
Bid Publish Date
20-Feb-2026, 9:58 pm
Bid End Date
03-Mar-2026, 9:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Sangli District Panchayats, Department of Panchayati Raj, Maharashtra. Procurement: Customized AMC/CMC for pre-owned solar PV on-grid system with net metering at 18 kW capacity, including installation and commissioning. Location: Sangli, Maharashtra (PIN 415301). Warranty: One-year maintenance service warranty. Scope: Provision, installation, and commissioning of the 18kW solar PV net metering setup on grid, with maintenance support. Key differentiator: Focus on pre-owned equipment with full on-site commissioning. Unique aspect: Net metering compliance and integrated maintenance within a single contract.
Solar PV system: 18 kW on-grid with net metering
Scope: supply, installation, commissioning, and 1-year maintenance
Warranty: 1-year maintenance warranty post-commissioning
Equipment condition: pre-owned products
Delivery site: Sangli, Maharashtra
25% flex on quantity or duration at contract issue
EMD amount not disclosed; confirm per local rules
Completion and commissioning to align with net metering interconnection
Documentation package includes GST, PAN, and experience certificates
Exact payment terms not disclosed; bidders should seek confirmation of schedule tied to milestones and commissioning.
No explicit delivery date provided; bidders should propose a detailed installation and commissioning timeline post-award.
Penalty clauses not specified; bidders should inquire about LD rates for delayed commissioning and performance shortfalls.
Experience in installing and commissioning on-grid solar PV systems with net metering
Ability to handle pre-owned equipment supply and AMC/CMC
Financial viability demonstrated by recent financial statements
Main Document
SCOPE_OF_WORK
PAYMENT
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Kolhapur District Panchayats
KOLHAPUR, MAHARASHTRA
Kolhapur District Panchayats
KOLHAPUR, MAHARASHTRA
Sangli District Panchayats
SANGLI, MAHARASHTRA
Sindhudurg Zilla Parishad
SINDHUDURG, MAHARASHTRA
Sangli District Panchayats
SANGLI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar solar PV AMC/CMC projects
Financial statements (last 2-3 years)
EMD/Security deposit proof (as per local norms)
Technical bid documents and proposed AMC/CMC schedule
OEM authorizations or approvals for pre-owned equipment
Key insights about MAHARASHTRA tender market
To bid, bidders must secure the project’s scope of 18 kW on-grid solar with net metering, provide AMC/CMC for pre-owned equipment, and submit GST, PAN, and experience certificates. Confirm OEM authorizations and ensure 1-year maintenance warranty compliance post-commissioning.
Submit GST certificate, PAN card, up-to-date financial statements, prior project experience certificates for solar AMC/CMC, EMD proof, technical bid, and OEM authorizations for pre-owned equipment to validate eligibility and technical capability.
System must be on-grid with net metering, deliver 18 kW capacity, include installation and commissioning, and provide a 1-year maintenance warranty. Specific standards are not listed; verify interconnection and local net metering regulations before submission.
There is a 1-year maintenance warranty included post-commissioning. AMC/CMC covers ongoing service, maintenance, and potential minor repairs within the first year following successful grid connection and commissioning.
The buyer allows up to 25% increase or decrease in contract quantity or duration at the time of contract issue, and up to 25% adjustment after award. Bidders must be prepared to adjust accordingly.
Bidders should propose a detailed installation and commissioning plan post-award, aligning with net metering interconnection norms. Exact dates are not provided; ensure readiness for rapid deployment and grid integration.
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
PAYMENT
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS