24 port layer 2 Gigabit managed switch,Networking IO Box,UTP patch cord 2 mtrs,24 port UTP Patch pa
Assam University
Progress
Quantity
3621
Category
Layer 3 Core Switch
Bid Type
Two Packet Bid
Translational Health Science And Technology Institute (thsti) has released a public tender for Layer 3 Core Switch, Layer 2 Access Switch, 40G SM LR SFP, 10G SM LR SFP, UPS, 15 U Rack, Jack panel, Cable Manager, Copper patch cord, Fiber, Fiber Patch Cord, LIU, Installation and Commissioning in FARIDABAD, HARYANA. Quantity: 3621. Submission Deadline: 11-03-2026 16: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Assam University
Indian Army
Indian Army
BHOPAL, MADHYA PRADESH
Indian Institute Of Engineering Science And Technology
HOWRAH, WEST BENGAL
Indian Navy
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Layer 3 Core Switch | Layer 3 Core Switch | 2 | pieces | thsti.procurement | 30 |
| 2 | Layer 2 Access Switch | Layer 2 Access Switch | 25 | pieces | thsti.procurement | 30 |
| 3 | 40G SM LR SFP | 40G SM LR SFP | 8 | pieces | thsti.procurement | 30 |
| 4 | 10G SM LR SFP | 10G SM LR SFP | 138 | pieces | thsti.procurement | 30 |
| 5 | UPS | UPS | 2 | pieces | thsti.procurement | 30 |
| 6 | 15 U Rack | 15 U Rack | 10 | pieces | thsti.procurement | 30 |
| 7 | Jack panel | Jack panel | 42 | pieces | thsti.procurement | 30 |
| 8 | Cable Manager | Cable Manager | 42 | pieces | thsti.procurement | 30 |
| 9 | Copper patch cord | Copper patch cord | 1,000 | pieces | thsti.procurement | 30 |
| 10 | Fiber | Fiber | 2,200 | mtr | thsti.procurement | 30 |
| 11 | Fiber Patch Cord | Fiber Patch Cord | 138 | pieces | thsti.procurement | 30 |
| 12 | LIU | LIU | 13 | pieces | thsti.procurement | 30 |
| 13 | Installation and Commissioning | Installation and Commissioning | 1 | lot | thsti.procurement | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS