ER6150B-00531,ER6150B-00513,ER6150B-03304,ER6150B-05051,ER6150B-09033,ER6150B-101022,ER6150B-101101
Indian Navy
MUMBAI, MAHARASHTRA
Bid Publish Date
30-Oct-2025, 12:36 pm
Bid End Date
03-Jan-2026, 11:00 am
Location
Progress
Quantity
2353
Category
EB6220B 06 3910
The Indian Navy, Department Of Military Affairs, invites bids for IT equipment under multiple EB603x series codes, aligning with IPv6 readiness and OEM authorization requirements. The procurement scope references 31 BOQ items with unspecified quantitative details, emphasizing product data sheet alignment and end-user certification. Key differentiators include mandatory IPv6 readiness, data sheet verification, and hazardous-material handling provisions, ensuring compliant, up-to-date hardware. The tender stresses non-obsolescence (minimum 2 years residual market life) and OEM-backed installation/commissioning. Location and exact end-use context are tied to Indian Navy IT assets, with a focus on secure, standards-compliant hardware.
EMD and financial integrity proof required; no liquidation proceedings
Bid must include data sheet alignment and End User Certificate in buyer format when requested
Products must have minimum 2-year residual market life and IPv6 readiness
GST as actual or applicable rate; payment terms linked to delivery and acceptance per Navy's standard.
Installation/commissioning to be performed by OEM-certified personnel; delivery timelines to be specified in bid.
Not explicitly stated; contract may include standard penalties for non-compliance or late delivery.
No corporate liquidation, court receivership, or bankruptcy
Products must have at least 2 years residual market life and not be end-of-life
Ability to provide OEM authorization and, if required, End User Certificate in buyer format
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Navy
MUMBAI, MAHARASHTRA
Indian Navy
MUMBAI, MAHARASHTRA
Indian Navy
MUMBAI, MAHARASHTRA
Indian Navy
MUMBAI, MAHARASHTRA
Indian Navy
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | EB6220B 06 3910 | ROLLER SOLID TAPPER 2 3 4X243 281 | 56 | pieces | jcwhespii | 365 |
| 2 | EB622B 01 8665 | SPRING | 17 | pieces | jcwhespii | 365 |
| 3 | EB622B 02 8085 | RATCHET 3 5 8 SG IN ALL SETS | 14 | pieces | jcwhespii | 365 |
| 4 | EB622B 07 3901 | EXPANDER COMPLETE | 100 | pieces | jcwhespii | 365 |
| 5 | EB622B 10 12309 53 | NUT 5 8 BSF CAP | 225 | pieces | jcwhespii | 365 |
| 6 | EB622B 13 6935 6 | MANDREL 13 35 6 | 17 | pieces | jcwhespii | 365 |
| 7 | EB622B 13 6935 4 | MANDREL 13 6935 4 | 130 | pieces | jcwhespii | 365 |
| 8 | EB622B 24 6935 2 | MANDREL 24 35 2 | 74 | pieces | jcwhespii | 365 |
| 9 | EB622B 331 7517 | NUT CAP 1 BSF NO 9 | 100 | pieces | jcwhespii | 365 |
| 10 | EB622B 38 6935 | MANDREL 38 35 1 | 161 | pieces | jcwhespii | 365 |
| 11 | EB622B 570 4017 | SPINDLE VALVE RETAINING NUTS | 13 | pieces | jcwhespii | 365 |
| 12 | EB622B 7075 207 027 | STUD 1.3 8 BSFX1 1 4 BSFX10 L DIA NUT STANDARD MAND | 82 | pieces | jcwhespii | 365 |
| 13 | EB622B 7075 209 210 12 | NUT CAP 5 8 BSF WITH SPIGOT | 48 | pieces | jcwhespii | 365 |
| 14 | EB622B 7075 207 74 | NUT CAP 5 8 BSF | 55 | pieces | jcwhespii | 365 |
| 15 | EB622B 7075 465 08 | SCREW HRS 1 2 X 13UNCX7 8 LONGT | 100 | pieces | jcwhespii | 365 |
| 16 | EB622B 7075 303 060 | SCREW HEX HD 1 2 X 13 UNC 2A 1 LONG 7075 501 502 600 | 81 | pieces | jcwhespii | 365 |
| 17 | EB622B 7075 501 502 1 | BOLT BODY SHADDER WITH 1 4 THICK 5 8 UNCX7 8 DIA 1.3 16 | 222 | pieces | jcwhespii | 365 |
| 18 | EB622B 7075 466 8 | SCREW 5 8 LONG 1 2 X 13 UNC 2A HEX HEAD | 131 | pieces | jcwhespii | 365 |
| 19 | EB622B DRGBO 100 | RING DISTANCE | 20 | pieces | jcwhespii | 365 |
| 20 | EB622B DRGNO 14AND15 | BOLT WITH NUT AND WASHER 1 2 | 50 | pieces | jcwhespii | 365 |
| 21 | EB622B DRGNO 109320 | BAFFLE BRIDGE | 67 | pieces | jcwhespii | 365 |
| 22 | EB622B DRGNO 3 1 | BOLT AND NUT 7 8 DIA 10 LONG | 209 | pieces | jcwhespii | 365 |
| 23 | EB622B DRGNO 6950 260 | COUPLING SOOT BLOWER FLEXIBLE | 70 | pieces | jcwhespii | 365 |
| 24 | EB622B DRGNO 6951 247 1 | ROLLER SPLITS TAPPER 2 11 16X24 278 | 20 | pieces | jcwhespii | 365 |
| 25 | EB622B DRGNO 6951 247 4 | ROLLER SPARE CUP TAPPER 09 | 20 | pieces | jcwhespii | 365 |
| 26 | EB622B DRGNO 6951 247 5 | ROLLER BELLING TAPER 7 8 38 456 | 20 | pieces | jcwhespii | 365 |
| 27 | EB622B ILMS M 0654 | BOLT 1 1 4 LONG X 1 2 BSF | 141 | pieces | jcwhespii | 365 |
| 28 | EB622B ILMS M 0711 | PLUG TUBE 2 OD 2 X 10 11G | 8 | pieces | jcwhespii | 365 |
| 29 | EB622B P06 3901 | EXPANDER COMPLETE MOD 1 X 13G | 50 | pieces | jcwhespii | 365 |
| 30 | EB622B R 613068 | BOLT 1 2 BSF 3 1 2 L | 50 | pieces | jcwhespii | 365 |
| 31 | EB622B 3485 3 9 | JOINT | 2 | pieces | jcwhespii | 365 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered products
End User Certificate (if required in buyer format)
OEM Manufacturer Authorization (where applicable)
Extended Deadline
03-Jan-2026, 11:00 am
Opening Date
03-Jan-2026, 11:30 am
Extended Deadline
31-Dec-2025, 11:00 am
Opening Date
31-Dec-2025, 11:30 am
Extended Deadline
29-Nov-2025, 11:00 am
Opening Date
29-Nov-2025, 11:30 am
Key insights about MAHARASHTRA tender market
Prepare data sheet aligned with bid; ensure OEM authorization is in place; upload PAN, GSTIN, cancelled cheque, and EFT mandate; confirm IPv6 readiness and 2-year residual market life; include End User Certificate if requested by buyer.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, data sheet of offered products, End User Certificate (buyer format if requested), and OEM Manufacturer Authorization where applicable; ensure data sheet matches bid precisely.
Equipment must be IPv6 ready from day one; data sheet must align with specifications; may require Malicious Code Certificate and OEM authorization; hazardous-material handling must follow safety regulations with MSDS labeling.
EMD amount is not specified publicly here; GST will be charged at actuals or applicable rate, whichever is lower, up to quoted GST percentage; ensure GSTIN validity and timely submission with bid.
Installation, commissioning, and training must be performed by OEM-certified resources or OEM-authorized resellers; ensure training schedule and warranty terms are clearly defined in the bid.
Bidder must offer products not declared end-of-life by OEM; ensure minimum 2 years residual market life; provide product data sheet proving current market availability and support.
Upload product data sheets that precisely reflect bid specifications; cross-check with CTO/IT standards; any mismatch may lead to bid rejection during evaluation.
If requested by the Buyer, End User Certificate must be provided in the Buyer’s standard format; verify requirements in tender terms and prepare in advance to avoid bid rejection.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS