Open Tender for Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - HYDERABAD,Retrofitment of 42

Bid Publish Date

27-Jul-2026, 10:01 am

Bid End Date

27-Aug-2026, 11:00 am

Generate Docs

Progress

Issue27-Jul-2026, 10:01 am
Corrigendum17-Aug-2026
AwardPending

Power Grid Corporation Of India Limited invites bids for Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - HYDERABAD, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - HYDERABAD, Supply of 420KV, 3150A, 63kA Isolator 3- Phase Double Break with two ES - HYDERABAD, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - HYDERABAD, Supply of 40mm MS ROD - HYDERABAD, Associated Work Annex -F - HYDERABAD, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - NAGARJUNASAGAR, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - NAGARJUNASAGAR, Supply of 40mm MS ROD - NAGARJUNASAGAR, Associated Work Annex -G - NAGARJUNASAGAR, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR, Supply of 40mm MS ROD - JYOTHINAGAR, Associated Work Annex -H - JYOTHINAGAR, Supply of 420KV, 3150A, 63kA Isolator 3- Phase Double Break with one ES - KHAMMAM, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - KHAMMAM, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - KHAMMAM, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - KHAMMAM, Supply of 40mm MS ROD - KHAMMAM, Associated Work Annex -I - KHAMMAM, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA, Supply of 40mm MS ROD - VIJAYAWADA, Associated Work Annex -J - VIJAYAWADA, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - VIZAG, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - VIZAG, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - VIZAG, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - VIZAG, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break without ES - VIZAG, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break without ES - VIZAG, Supply of 420KV, 63kA Stand alone ES 3-Phase - VIZAG, Retrofitment of 420KV, 63kA Stand alone ES 3-Phase - VIZAG, Supply of 40mm MS ROD - VIZAG, Associated Work Annex -K - VIZAG, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - NELLORE, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - NELLORE, Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - NELLORE, Retrofitment of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with two ES - NELLORE, Supply of 40mm MS ROD - NELLORE, Associated Work Annex -L - NELLORE, Mandatory Spare- Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - KHAMMAM, Mandatory Spare- Supply of 420KV, 3150A, 63kA Isolator 3- Phase Double Break with one ES - VIZAG, Mandatory Spare- Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - NELLORE, Mandatory Spare- Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA, Mandatory Spare- Supply of 420KV, 3150A, 63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR. Quantity: 6981. Submission Deadline: 27-08-2026 11: 00: 00. Submit your proposal before the deadline.

Tender Data

Bid Details

Quantity

6981

Category

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - HYDERABAD

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - HYDERABAD , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - HYDERABAD , Supply of 420KV,3150A,63kA Isolator 3- Phase Double Break with two ES - HYDERABAD , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - HYDERABAD , Supply of 40mm MS ROD - HYDERABAD , Associated Work Annex -F - HYDERABAD , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NAGARJUNASAGAR , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NAGARJUNASAGAR , Supply of 40mm MS ROD - NAGARJUNASAGAR , Associated Work Annex -G - NAGARJUNASAGAR , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR , Supply of 40mm MS ROD - JYOTHINAGAR , Associated Work Annex -H - JYOTHINAGAR , Supply of 420KV,3150A,63kA Isolator 3- Phase Double Break with one ES - KHAMMAM , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - KHAMMAM , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - KHAMMAM , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - KHAMMAM , Supply of 40mm MS ROD - KHAMMAM , Associated Work Annex -I - KHAMMAM , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA , Supply of 40mm MS ROD - VIJAYAWADA , Associated Work Annex -J - VIJAYAWADA , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIZAG , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIZAG , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - VIZAG , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - VIZAG , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break without ES - VIZAG , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break without ES - VIZAG , Supply of 420KV, 63kA Stand alone ES 3-Phase - VIZAG , Retrofitment of 420KV, 63kA Stand alone ES 3-Phase - VIZAG , Supply of 40mm MS ROD - VIZAG , Associated Work Annex -K - VIZAG , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NELLORE , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NELLORE , Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - NELLORE , Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - NELLORE , Supply of 40mm MS ROD - NELLORE , Associated Work Annex -L - NELLORE , Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - KHAMMAM , Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3- Phase Double Break with one ES - VIZAG , Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NELLORE , Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA , Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

38

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

03-08-2026 11:00:00

Pre-Bid Venue

Pre-Bid Meeting shall be conducted as per scheduled date indicated in GeM Bid (In Online Mode). Request for providing link for participation in online Pre-Bid Meeting shall be sent by bidder through e-mail at [email protected]. The Bidder's designated representatives are invited to attend a pre-bid meeting, which will take place through Video Conferencing. The web link to join the meeting shall be shared before the scheduled date of the meeting.

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Medchal Malkajgiri

Delivery Pincodes

501301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Azmeera Prem Kumar501301,Power Grid Corporation of India Limited, Post Box No.2, Hyderabad 400 kV substation, Ghanapur Village, Ghakesar- Post, R.R District Hydraba- 501301Medchal MalkajgiriTelangana5013015730-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9622847.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

17-Aug-2026

Extended Deadline

27-Aug-2026, 5:30 am

Opening Date

27-Aug-2026, 6:00 am

Bill of Quantities (BOQ) 45 Items Sign in for GEM prices

#1

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - HYDERABAD

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

5 set Delivery: 730 days
#2

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - HYDERABAD

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

5 set Delivery: 730 days
#3

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - HYDERABAD

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#4

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - HYDERABAD

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#5

Supply of 40mm MS ROD - HYDERABAD

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

520 meter Delivery: 730 days
#6

Associated Work Annex -F - HYDERABAD

Associated Work Annex -F

1 lot Delivery: 730 days
#7

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NAGARJUNASAGAR

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

9 set Delivery: 730 days
#8

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NAGARJUNASAGAR

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

9 set Delivery: 730 days
#9

Supply of 40mm MS ROD - NAGARJUNASAGAR

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

853 meter Delivery: 730 days
#10

Associated Work Annex -G - NAGARJUNASAGAR

Associated Work Annex -G

1 lot Delivery: 730 days
#11

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

10 set Delivery: 730 days
#12

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

10 set Delivery: 730 days
#13

Supply of 40mm MS ROD - JYOTHINAGAR

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

561 meter Delivery: 730 days
#14

Associated Work Annex -H - JYOTHINAGAR

Associated Work Annex -H

1 lot Delivery: 730 days
#15

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - KHAMMAM

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

10 set Delivery: 730 days
#16

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - KHAMMAM

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

10 set Delivery: 730 days
#17

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - KHAMMAM

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#18

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - KHAMMAM

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#19

Supply of 40mm MS ROD - KHAMMAM

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

772 meter Delivery: 730 days
#20

Associated Work Annex -I - KHAMMAM

Associated Work Annex -I

1 lot Delivery: 730 days
#21

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

6 set Delivery: 730 days
#22

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

6 set Delivery: 730 days
#23

Supply of 40mm MS ROD - VIJAYAWADA

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

450 meter Delivery: 730 days
#24

Associated Work Annex -J - VIJAYAWADA

Associated Work Annex -J

1 lot Delivery: 730 days
#25

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIZAG

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

25 set Delivery: 730 days
#26

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIZAG

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation .

25 set Delivery: 730 days
#27

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - VIZAG

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

6 set Delivery: 730 days
#28

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - VIZAG

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

6 set Delivery: 730 days
#29

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break without ES - VIZAG

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) without E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

2 set Delivery: 730 days
#30

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break without ES - VIZAG

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) without E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

2 set Delivery: 730 days
#31

Supply of 420KV, 63kA Stand alone ES 3-Phase - VIZAG

Supply of 420KV, 63kA Stand alone E/S (3-Phase) as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation

7 set Delivery: 730 days
#32

Retrofitment of 420KV, 63kA Stand alone ES 3-Phase - VIZAG

Retrofitment of 420KV, 63kA Stand alone E/S (3-Phase) as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation

7 set Delivery: 730 days
#33

Supply of 40mm MS ROD - VIZAG

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

2,350 meter Delivery: 730 days
#34

Associated Work Annex -K - VIZAG

Associated Work Annex -K

1 lot Delivery: 730 days
#35

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NELLORE

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

16 set Delivery: 730 days
#36

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NELLORE

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

16 set Delivery: 730 days
#37

Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - NELLORE

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

2 set Delivery: 730 days
#38

Retrofitment of 420KV,3150A,63kA Isolator 3-Phase Double Break with two ES - NELLORE

Retrofitment of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with two E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

2 set Delivery: 730 days
#39

Supply of 40mm MS ROD - NELLORE

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD

1,263 meter Delivery: 730 days
#40

Associated Work Annex -L - NELLORE

Associated Work Annex -L

1 lot Delivery: 730 days
#41

Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - KHAMMAM

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#42

Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIZAG

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#43

Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - NELLORE

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation. include of F&I Charges.

1 set Delivery: 730 days
#44

Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - VIJAYAWADA

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as perTS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days
#45

Mandatory Spare- Supply of 420KV,3150A,63kA Isolator 3-Phase Double Break with one ES - JYOTHINAGAR

Supply of 420KV,3150A,63kA Isolator (3-Phase) (Double Break) with one E/S as per TS including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation.

1 set Delivery: 730 days

Categories 11

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer