Brahmaputra Valley Fertilizer Corporation Limited (BVFCL) invites limited enquiry bids for the supply of a shaft along with 13 keys as per drawings and returnable sample. The scope is strictly supply of goods, with a sample shaft to be mailed/returned to BVFCL site. The process mandates Material Test Certificate (MTC) from a government-approved test house and a TPI report for dimensional accuracy, runout, and related checks. Bid terms allow a quantity variation of up to 25% during contract execution. A guarantee certificate for supplied items is required upon delivery, and sampling is tied to specific supplier options listed in the ATC.
Keywords: tender in BVFCL, Shaft with keys procurement, limited enquiry, 13 keys, government-approved MTC, TPI reporting, sample shaft delivery, BVFCL site testing
Shaft with 13 keys as per drawing and sample
Delivery scope: supply of goods only
Dimensional verification: TPI with runout < 0.04 mm
MTC from government-approved test house
TPI by government-approved party with documentary evidence
Returnable sample shaft to BVFCL site
Quantity variation up to 25% during contract
Delivery schedule linked to original DO date with extension rules
MTC and TPI reports mandatory with supply
Guarantee certificate required on delivered items
Purchaser may adjust quantity by ±25% during allocation and currency; delivery time recalculated with minimum 30 days extension
Delivery period starts from last date of original delivery order; extended duration follows the option clause rules
MTC from Govt.-approved test house; TPI by Govt.-approved agency; runout < 0.04 mm; documentary evidence required
Participation restricted to listed bidders per ATC; others rejected on technical grounds
Demonstrated experience in shaft fabrication or similar precision components
Ability to provide government-approved MTC and TPI documentation
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
OEM Avg. Turnover
6
Past Performance
20 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Shaft along with keys
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Dibrugarh
Delivery Pincodes
786623
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pinaki Chakraborty | 786623,BRAHMAPUTRA VALLEY FERTILIZER CORPORATION LIMITED GROUND, 1, BVFCL, DHUDRA ALI, DILLIGHAT | Dibrugarh | Assam | 786623 | 2 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
21-Oct-2026, 12:30 pm
Opening Date
22-Oct-2026, 12:30 pm
Extended Deadline
14-Oct-2026, 12:30 pm
Opening Date
15-Oct-2026, 12:30 pm
Extended Deadline
07-Oct-2026, 12:30 pm
Opening Date
08-Oct-2026, 12:30 pm
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar shaftSupply
Financial statements (latest)
EMD documents (if applicable; amount not specified in tender)
Technical bid documents and drawings
OEM authorizations (if applicable)
Material Test Certificate (MTC) from Govt. approved test house
TPI reports from Govt.-approved agency
Guarantee certificate for supplied items
Delivery and installation plan (if requested)
Key insights about ASSAM tender market
Bidders must meet the limited enquiry eligibility, submit drawings, a returnable sample shaft to the BVFCL site, and provide MTC from a Govt-approved test house plus a TPI report from a Govt-approved agency. Ensure 13 keys are included per the drawing, with a guarantee certificate on delivery.
Submit GST registration, PAN, experience certificates for shaft fabrication, latest financial statements, technical bid documents, OEM authorizations if applicable, MTC from a government-approved lab, TPI reports, and a guarantee certificate for supplied shafts.
The runout target is less than 0.04 mm, with a detailed runout report required. TPI should confirm dimensional accuracy and is to be performed by a government-approved agency, with documentary evidence provided.
The purchaser may increase or decrease the quantity by up to 25% of the bid quantity at contract placement and during currency at contracted rates; delivery time adjusts proportionally with a minimum of 30 days extension.
Submit the sample shaft to the BVFCL site per drawing; the item must be returnable. This includes the shaft with 13 keys and compliance with latest engineering standards as per ATC clauses.
TPI must be from a Govt.-approved party with documentary evidence; MTC must come from a government-approved test house. Approved vendors include listed suppliers; ensure all reports accompany the supply.
Delivery starts after the last date of the original delivery order. If the option clause is exercised, the extended period applies and is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Mandatory Material Test Certificate (MTC) from a govt.-approved lab, TPI reports from a government-approved party, and a guarantee certificate for the supplied shaft. Ensure compliance with the drawings and 13-key configuration.