Bid Publish Date
21-Nov-2025, 5:49 pm
Bid End Date
03-Dec-2025, 7:00 pm
Location
Progress
RAQuantity
56
Category
HEADER ASSEMBLY IBR INLET FOR ECONOMISER OF BOILERS
Bid Type
Two Packet Bid
Organization: Alloy Steel Plant, Steel Authority of India Limited (SAIL) – sourcing IBR boiler components forEconomiser header and superheater manifold caps, plus associated header assemblies for boilers. Location: Bardhaman, West Bengal 713101. Procurement scope includes 5 items described in the BOQ (JT 6A, JT 6B, IBR inlet/outlet headers for economiser boilers). No explicit quantity or estimated value published. Tender emphasizes compliance with Indian Boiler Regulation and IBR certificates, with third-party inspection requirements. Unique aspect: stringent IBR-based eligibility and documentary verification, indicating high technical risk and compliance focus for component manufacturers.
The tender enforces strong IBR-based prerequisites rather than product-level dimensions due to missing specifications. Key requirements include:
Product/service names: IBR boiler components, economiser header assemblies, superheater manifold caps, and related headers
Quantities/BOQ: 5 items listed; exact quantities not disclosed
Estimated value: Not published
Eligibility: IBR Component Manufacturer recognition (18 kg/cm2) and IBR certificates
Quality/standards: IBR Form III E (4F), Form III B (4F) certification; stamping by Director of Boilers
IBR-based eligibility with government/PSU collaboration in last 3 years
Submission must include Annexure-S with issuing authority contact details
Third-party IBR inspection and stamped certification required
Not specified in available data; verify in official tender documents
Not specified in available data; refer to purchase order terms during bid submission
Not specified in available data; check bidder terms for LD or penalties upon non-compliance
Valid IBR Component Manufacturer recognition for 18 kg/cm2 or higher
IBR boiler tubes/pressure parts certificates within the last 3 years
Evidence of purchase orders with IBR certificates and Annexure-S details
Government/PSU partner presence in last 3 years (as applicable)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD , HAND HOLE DOG FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6A , HAND HOLE DOG FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6B , HEADER ASSEMBLY IBR INLET FOR ECONOMISER OF BOILERS , HEADER ASSEMBLY IBR OUTLET FOR ECONOMISER OF BOILERS
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD
INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD AS PER ITEM NO JT 6 BY 1 OF DRG NO 6115037290 ALONG WITH ITEMS MARKED D AND E FOR EACH CAP
HAND HOLE DOG FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6A
DOG HAND HOLE FOR CAP OF ECONOMISER HEADER AS PER ITEM NO JT 6A OF DRG NO 6115037290
HAND HOLE DOG FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6B
DOG HAND HOLE FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6B OF DRG NO 6115037290
HEADER ASSEMBLY IBR INLET FOR ECONOMISER OF BOILERS
HEADER ASSEMBLY EIM 1 IBR INLET FOR ECONOMISER OF BOILER COMPLETE WITH EIM 2 TO EIM 11 EIM 4F EIM 5F EIM 6F AND J T 6 BY 1 ALONG WITH PARTS D E AND J T 6A 041290 REV A
HEADER ASSEMBLY IBR OUTLET FOR ECONOMISER OF BOILERS
HEADER ASSEMBLY EOM1 IBR OUTLET FOR ECONOMISER OF BOILERS COMPLETE WITH EOM 2 TO EOM 10 EOM 4F EOM 5F AND J T 6 BY 1 ALONG WITH PARTSD E AND J T 6A DRAWING NO 6115041290 REV A
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD | INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD AS PER ITEM NO JT 6 BY 1 OF DRG NO 6115037290 ALONG WITH ITEMS MARKED D AND E FOR EACH CAP | 24 | set | aspstores | 70 | |
| 2 | HAND HOLE DOG FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6A | DOG HAND HOLE FOR CAP OF ECONOMISER HEADER AS PER ITEM NO JT 6A OF DRG NO 6115037290 | 16 | nos | aspstores | 70 | |
| 3 | HAND HOLE DOG FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6B | DOG HAND HOLE FOR CAP OF SUPERHEATER MANIFOLD AS PER ITEM NO JT 6B OF DRG NO 6115037290 | 12 | nos | aspstores | 70 | |
| 4 | HEADER ASSEMBLY IBR INLET FOR ECONOMISER OF BOILERS | HEADER ASSEMBLY EIM 1 IBR INLET FOR ECONOMISER OF BOILER COMPLETE WITH EIM 2 TO EIM 11 EIM 4F EIM 5F EIM 6F AND J T 6 BY 1 ALONG WITH PARTS D E AND J T 6A 041290 REV A | 2 | set | aspstores | 70 | |
| 5 | HEADER ASSEMBLY IBR OUTLET FOR ECONOMISER OF BOILERS | HEADER ASSEMBLY EOM1 IBR OUTLET FOR ECONOMISER OF BOILERS COMPLETE WITH EOM 2 TO EOM 10 EOM 4F EOM 5F AND J T 6 BY 1 ALONG WITH PARTSD E AND J T 6A DRAWING NO 6115041290 REV A | 2 | set | aspstores | 70 |
Copy of Recognition under Indian Boiler Regulation (IBR) 1950 for Component Manufacturer (18 kg/cm2 or higher)
Copy of IBR certificates for boiler tubes/pressure parts (18 kg/cm2 or higher) for last 3 years ending 30/09/2025
Purchase Orders/Work Orders (POs) for relevant items
IBR certificates corresponding to submitted POs
Annexure-S list with issuing authority contact details (postal, email, phone)
Certificate forms III E (4F) and III B (4F) from IBR on manufacturer & test
Two copies of IBR-approved drawings for each item
Material Test Certificates (MTC) for all items
Documents showing stamping by Director of Boilers (encircled watermark visibility)
Any other supporting documents as requested for eligibility verification
Start
18-Feb-2026, 11:00 am
End
19-Feb-2026, 11:00 am
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M.S.R. IRON FOUNDRY & STEEL WORKS Under PMA | - | 03-12-2025 18:01:57 | |
| 2 | THE BOILER COMPONENTS MFG.CO Under PMA | - | 02-12-2025 16:25:18 | |
| 3 | UMA ENGINEERING ENTERPRISES Under PMA | - | 03-12-2025 17:35:32 | |
| 4 | ZION ENGINEERING WORKS (UNIT-2) Under PMA | - | 29-11-2025 12:49:12 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | THE BOILER COMPONENTS MFG.CO(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD,HAND HOLE DOG FOR CAP OF SUPERHEATER M | |
| L2 | ZION ENGINEERING WORKS (UNIT-2) (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : INTERNAL CAP FOR ECONOMISER HEADER AND SUPER HEATER MANIFOLD,HAND HOLE DOG FOR CAP OF SUPERHEATER M |
Key insights about WEST BENGAL tender market
Bidders must possess IBR Component Manufacturer recognition for 18 kg/cm2, submit IBR certificates for boilers, provide PO copies and Annexure-S with issuing authorities. Prepare MTCs, IBR drawings, and director-of-boilers stamping documents. Ensure third-party IBR inspection forms III E and III B are completed and included with submission.
Required documents include IBR recognition certificate, IBR certificates for relevant boiler parts over last 3 years, POs/WO copies, Annexure-S contact details, IBR drawings (two copies), MTCs for all items, and stamping proof by the Director of Boilers. Submissions must align with tender terms and verification protocols.
Submit under Indian Boiler Regulation 1950 with Form III E (4F) and Form III B (4F). Ensure boiler tubes/pressure parts meet 18 kg/cm2 working pressure requirements, with IBR-approved drawings and document authentication from issuing authorities for validation.
Third-party IBR inspection is mandatory with Form III E (4F) and III B (4F) certifications, plus two copies of IBR-approved drawings and material test certificates. Inspection outcomes will influence eligibility; ensure Annexure-S contact details are accurate for verification.
Annexure-S requires listing each supporting document on letterhead, including issuing authority contact details (postal, email, landline/mobile). This accelerates verification by SAIL and reduces delays in eligibility determination for Bardhaman bids.
PO copies and IBR certificates are essential; however, SAIL may verify all documents via issuing authorities. Ensure you provide two copies of each IBR drawing and complete MTCs to substantiate compliance with 18 kg/cm2 requirements and regulatory approvals.
All boiler items must be stamped by the Director of Boilers; the stamp should be encircled with white waterproof paint and protected by a suitable arrangement to ensure visibility and tamper protection at the point of inspection and acceptance.
No explicit quantities or estimated value are published in the data provided. Bidders should await official tender documentation for item-wise quantities, unit rates, and total estimated value prior to bid submission.