Supply of at least 20 TR capacity Package type Air conditioners,Installation Testing Commissioning
Power Grid Corporation Of India Limited
CUDDAPAH, ANDHRA PRADESH
Bid Publish Date
26-Dec-2024, 5:21 pm
Bid End Date
16-Jan-2025, 12:00 pm
EMD
₹1,20,126
Location
Progress
RAQuantity
78
Category
Sub Head I Supply of Equipments
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) has released a public tender for Sub Head I Supply of Equipments, Sub Head II ITC of EA set with acoustic enclosure and AMF control panel, Sub Head II SITC of extra exhaust pipe, Sub Head III AMC During 1st Year of warranty period, Sub Head III AMC During 2nd Year of warranty period, Sub Head III AMC During 1st Year of AMC after warranty period, Sub Head III AMC During 2nd Year of AMC after warranty period. , Sub Head III AMC During 3rd Year of AMC after warranty period, Sub Head III AMC During 4th year of AMC after warranty period, Sub Head III AMC During 5th year of AMC after warranty period in CENTRAL DELHI, DELHI. Quantity: 78. Submission Deadline: 16-01-2025 12: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Sub Head I Supply of Equipments , Sub Head II ITC of EA set with acoustic enclosure and AMF control panel , Sub Head II SITC of extra exhaust pipe , Sub Head III AMC During 1st Year of warranty period , Sub Head III AMC During 2nd Year of warranty period , Sub Head III AMC During 1st Year of AMC after warranty period , Sub Head III AMC During 2nd Year of AMC after warranty period. , Sub Head III AMC During 3rd Year of AMC after warranty period , Sub Head III AMC During 4th year of AMC after warranty period , Sub Head III AMC During 5th year of AMC after warranty period
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Power Grid Corporation Of India Limited
CUDDAPAH, ANDHRA PRADESH
Indian Space Research Organization
AHMEDABAD, GUJARAT
Indian Army
MEERUT, UTTAR PRADESH
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
Sub Head I Supply of Equipments
Sub Head I Supply of Equipments Supply of multi cylinder water cooled electric start Ready to Use directly coupled type DEA set confirming to CPCB IV norms in an acoustic enclosure along with AMF control panel capable of generating three phase 415 V 50 HZ full load capacity of 160KVA 128 KW at site conditions with diesel engine Diesel Engine 4 stroke electric start of minimum 200 BHP at 1500 RPM . a. Manufacturer Model No. BHP Cummins QSB67G21 206.8 Kirloskar 6K1080ETA4G1 200 The make of Engine Alternator shall be BSNL approved as per product list attached. B. ENGINE SAFETY DEVICES i. Engine stop solenoid. ii. PROTECTIVE FEATURES LED indications Alarm Acknowledge reset and Trip for the following iii. LLOP iv. HCT HWT High Engine temp and High canopy temp v. Low fuel level vi. Over under spee vii. Battery High Low Weak Volt viii. Emergency STOP Features Manual stop through push buttons ix. Fail to Crank Start C. Microprocessor based Digital DG set controller unit i. AMF Functionality ii. Electronic Governing iii. Engine run hour iv. Engine oil pressure v. Water Cylinder vi. Battery voltage vii. Alternator voltage viii. Alternator current D. Starting System12 V DC starting system consisting of i. Self-starter with 02 number batteries ii.Battery charging alternator E. Exhaust System i. Exhaust aftertreatment ii. Dry exhaust manifold with residential grade silencer iii. DEF Tank of suitable capacity F. Alternator 3 Phase i. Synchronous alternator The winding shall be star connected and neutral shall be brought out to the terminal box for earth with two independent earths. G. Base Frame H. Fuel Tank i. Daily service fuel tank with 385 Ltr I. Company fitted AMF Control Panel. J. Acoustic and weather proof enclosure housing Engine Alternator battery fuel tank and control panel complete as per specifications. Items are as per schedule of work item no. 1 of Sub Head I
Sub Head II ITC of EA set with acoustic enclosure and AMF control panel
SUB HEAD II ITC ITC of the above EA set with acoustic enclosure and AMF control panel Item No.1 with all equipments, accessories and associated items on the existing elevated plinth elevated structure foundation, connections of existing Body and Neutral earth cable termination including supplying consumables like lube oil fuel and providing artificial resistive load with cabling switching arrangements. etc. for pre acceptance testing i.e. 12 hours full load 1 hour 10 Percent overload and 1 hour at no load and final Acceptance Testing of EA set i.e. running of EA set on full load for 6 hours and running on 10Percent overload for 1 hour including topping up of lube oil up to full mark and filling of extra fuel up to a level suitable for 2 hours full load working etc. as per specifications as required Note Minor civil works such as cutting of floor or breaking of wall for laying of fuel pipes making supports to exhaust pipes shall be within the scope of the contractor without any extra cost Items are as per schedule of work item no. 2 of Sub Head II
Sub Head II SITC of extra exhaust pipe
SITC of extra exhaust pipe as per the CPCB norms with insulation and cladding, fabrication of suitable support made of MS structure clamping with nut and bolts, vibration isolators complete as required. Items are as per schedule of work item no. 3 of Sub Head II
Sub Head III AMC During 1st Year of warranty period
Sub Head III AMC Comprehensive Preventive Breakdown Maintenance of above 2x160 KVA EA set with all its associated items by deploying specialized man power supplying and fixing required spares tools and plant etc. to keep all the equipments healthy and operational including scheduled maintenance as per manufacturer recommendations as per the specification attached. Note The Rate Quoted shall be for 2Nos 160KVA sets together During 1st Year of warranty period for consumables only under warranty Items are as per schedule of work item no. 4 a of Sub Head III
Sub Head III AMC During 2nd Year of warranty period
During 2nd Year of warranty period for consumables only under warranty Items are as per schedule of work item no. 4 b of Sub Head III
Sub Head III AMC During 1st Year of AMC after warranty period
During 1st Year of AMC after warranty period. Items are as per schedule of work item no. 4 c of Sub Head III
Sub Head III AMC During 2nd Year of AMC after warranty period.
During 2nd Year of AMC after warranty period. Items are as per schedule of work item no. 4 d of Sub Head III
Sub Head III AMC During 3rd Year of AMC after warranty period
During 3rd Year of AMC after warranty period. Items are as per schedule of work item no. 4 e of Sub Head III
Sub Head III AMC During 4th year of AMC after warranty period
During 4th year of AMC after warranty period. Items are as per schedule of work item no. 4 f of Sub Head III
Sub Head III AMC During 5th year of AMC after warranty period
During 5th year of AMC after warranty period. Items are as per schedule of work item no. 4 g of Sub Head III
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Sub Head I Supply of Equipments | Sub Head I Supply of Equipments Supply of multi cylinder water cooled electric start Ready to Use directly coupled type DEA set confirming to CPCB IV norms in an acoustic enclosure along with AMF control panel capable of generating three phase 415 V 50 HZ full load capacity of 160KVA 128 KW at site conditions with diesel engine Diesel Engine 4 stroke electric start of minimum 200 BHP at 1500 RPM . a. Manufacturer Model No. BHP Cummins QSB67G21 206.8 Kirloskar 6K1080ETA4G1 200 The make of Engine Alternator shall be BSNL approved as per product list attached. B. ENGINE SAFETY DEVICES i. Engine stop solenoid. ii. PROTECTIVE FEATURES LED indications Alarm Acknowledge reset and Trip for the following iii. LLOP iv. HCT HWT High Engine temp and High canopy temp v. Low fuel level vi. Over under spee vii. Battery High Low Weak Volt viii. Emergency STOP Features Manual stop through push buttons ix. Fail to Crank Start C. Microprocessor based Digital DG set controller unit i. AMF Functionality ii. Electronic Governing iii. Engine run hour iv. Engine oil pressure v. Water Cylinder vi. Battery voltage vii. Alternator voltage viii. Alternator current D. Starting System12 V DC starting system consisting of i. Self-starter with 02 number batteries ii.Battery charging alternator E. Exhaust System i. Exhaust aftertreatment ii. Dry exhaust manifold with residential grade silencer iii. DEF Tank of suitable capacity F. Alternator 3 Phase i. Synchronous alternator The winding shall be star connected and neutral shall be brought out to the terminal box for earth with two independent earths. G. Base Frame H. Fuel Tank i. Daily service fuel tank with 385 Ltr I. Company fitted AMF Control Panel. J. Acoustic and weather proof enclosure housing Engine Alternator battery fuel tank and control panel complete as per specifications. Items are as per schedule of work item no. 1 of Sub Head I | 2 | nos | [email protected] | 90 | |
| 2 | Sub Head II ITC of EA set with acoustic enclosure and AMF control panel | SUB HEAD II ITC ITC of the above EA set with acoustic enclosure and AMF control panel Item No.1 with all equipments, accessories and associated items on the existing elevated plinth elevated structure foundation, connections of existing Body and Neutral earth cable termination including supplying consumables like lube oil fuel and providing artificial resistive load with cabling switching arrangements. etc. for pre acceptance testing i.e. 12 hours full load 1 hour 10 Percent overload and 1 hour at no load and final Acceptance Testing of EA set i.e. running of EA set on full load for 6 hours and running on 10Percent overload for 1 hour including topping up of lube oil up to full mark and filling of extra fuel up to a level suitable for 2 hours full load working etc. as per specifications as required Note Minor civil works such as cutting of floor or breaking of wall for laying of fuel pipes making supports to exhaust pipes shall be within the scope of the contractor without any extra cost Items are as per schedule of work item no. 2 of Sub Head II | 2 | job | [email protected] | 90 | |
| 3 | Sub Head II SITC of extra exhaust pipe | SITC of extra exhaust pipe as per the CPCB norms with insulation and cladding, fabrication of suitable support made of MS structure clamping with nut and bolts, vibration isolators complete as required. Items are as per schedule of work item no. 3 of Sub Head II | 12 | metre | [email protected] | 90 | |
| 4 | Sub Head III AMC During 1st Year of warranty period | Sub Head III AMC Comprehensive Preventive Breakdown Maintenance of above 2x160 KVA EA set with all its associated items by deploying specialized man power supplying and fixing required spares tools and plant etc. to keep all the equipments healthy and operational including scheduled maintenance as per manufacturer recommendations as per the specification attached. Note The Rate Quoted shall be for 2Nos 160KVA sets together During 1st Year of warranty period for consumables only under warranty Items are as per schedule of work item no. 4 a of Sub Head III | 1 | year | [email protected] | 90 | |
| 5 | Sub Head III AMC During 2nd Year of warranty period | During 2nd Year of warranty period for consumables only under warranty Items are as per schedule of work item no. 4 b of Sub Head III | 1 | year | [email protected] | 90 | |
| 6 | Sub Head III AMC During 1st Year of AMC after warranty period | During 1st Year of AMC after warranty period. Items are as per schedule of work item no. 4 c of Sub Head III | 12 | month | [email protected] | 90 | |
| 7 | Sub Head III AMC During 2nd Year of AMC after warranty period. | During 2nd Year of AMC after warranty period. Items are as per schedule of work item no. 4 d of Sub Head III | 12 | month | [email protected] | 90 | |
| 8 | Sub Head III AMC During 3rd Year of AMC after warranty period | During 3rd Year of AMC after warranty period. Items are as per schedule of work item no. 4 e of Sub Head III | 12 | month | [email protected] | 90 | |
| 9 | Sub Head III AMC During 4th year of AMC after warranty period | During 4th year of AMC after warranty period. Items are as per schedule of work item no. 4 f of Sub Head III | 12 | month | [email protected] | 90 | |
| 10 | Sub Head III AMC During 5th year of AMC after warranty period | During 5th year of AMC after warranty period. Items are as per schedule of work item no. 4 g of Sub Head III | 12 | month | [email protected] | 90 |
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
19-Mar-2025, 5:00 pm
End
20-Mar-2025, 5:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Electro Equipments Under PMA | - | 16-01-2025 11:54:39 | |
| 2 | KALESHAWARI POWER PRODUCT PRIVATE LIMITED Under PMA | - | 14-01-2025 20:32:14 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | KALESHAWARI POWER PRODUCT PRIVATE LIMITED(MSE,MII) Under PMA Winner | ₹48,17,204 | Item Categories : Sub Head I Supply of Equipments,Sub Head II ITC of EA set with acoustic enclosure and AMF control p |
| L2 | Electro Equipments (MSE,MII) Under PMA | ₹51,17,797 | Item Categories : Sub Head I Supply of Equipments,Sub Head II ITC of EA set with acoustic enclosure and AMF control p |
🎉 L1 Winner
KALESHAWARI POWER PRODUCT PRIVATE LIMITED(MSE,MII) Under PMA
Final Price: ₹48,17,204
Key insights about DELHI tender market
The eligibility requirements include being a registered entity with an average annual turnover of at least ₹19 lakh over the last three years. Additionally, bidders must provide proof of 3 years of experience in similar services supplied to governmental organizations or PSUs. Compliance with local content stipulated in the tender will also be assessed.
Bidders must include various documents such as:
Bidders can register through the governmental procurement portal where they must create an account, fill in the necessary details, and ensure that they meet the eligibility and documentation requirements as stipulated in the tender guidelines.
The preferred document formats include PDF and other common formats accepted on digital tendering platforms. Bidders should ensure that all files are legible and correctly formatted per submission standards established in the ATC.
Specifications for the 160 KVA Diesel Generators include requirements for acoustic enclosures and AMF (Automatic Main Failure) panels, which will be outlined in the BOQ provided in the tender documents for detailed technical evaluation.
Bidders must adhere to applicable Indian standards and any specific quality guidelines defined in the tender documentation. Compliance documentation should be submitted along with the bid.
Yes, MSEs need to be registered and present their Udyam Registration certificate or equivalent documentation for validation on the tendering portal to avail of preferential treatment.
The EMD amount required is ₹120,126. To apply for an EMD exemption, MSE bidders must submit valid documentation justifying the request, which will be verified as part of the evaluation process.
Payment terms will generally be discussed post-award of the contract based on the buyer's guidelines, which includes advance payment requests, progress payment arrangements, or other structures as defined in specific purchase orders.
The price evaluation will consider the total value offered by the bidders, and the assessment will only include technically qualified bidders for any reverse auction, focusing on the lowest bids once technical evaluations are satisfied.
Results notification timelines may vary; however, once evaluations are completed, bidders will be informed through the official procurement portal or via notification to registered emails as detailed in the tender document specifications.
MSEs have preferential access to procurement opportunities and exemptions from certain requirements depending on their compliance status and Udyam registration. This includes facilitation in documentation processes.
The tender mandates adherence to minimum local content requirements, encouraging locally sourced products and services, hence preferences will be given to Class 1 local suppliers as defined by the policies under the Make in India initiative.
Startups can participate but are not exempt from age or turnover requirements. They must provide proof of innovative products and services while complying with standard documentation and eligibility parameters.
Indian Army
📍 WEST DELHI, DELHI
Indian Army
📍 WEST DELHI, DELHI
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 DODA, JAMMU & KASHMIR
Hindustan Petroleum Corporation Ltd
📍 CHENNAI, TAMIL NADU
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS