Bid Publish Date
01-Sep-2026, 3:06 pm
Bid End Date
14-Sep-2026, 11:30 am
EMD
₹6,02,000
Value
₹3,00,93,032
Location
Progress
The issuing authority has released a public tender for Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P. H. Division, Munger For Year 2026-27. in BIHAR. Submission Deadline: 14-09-2026 11: 30: 00. Download documents and apply online.
Tender Type
Open
Tender Fee
₹10,000
Tender Fee Exemption
No
EMD Exemption
No
Category
CIVIL
Bid Submission Start
02-09-2026 13:00:00
Bid Validity
180
Processing Fee
₹11,800
Tender Currency
INR
Bid Currency
INR
Ranking Sequence
L1 Ranking
Estimated Value Visibility
Y
Bid To RA
No
Organization Hierarchy
Government of Bihar->Public Health Engineering Department->Bhagalpur Zone->Munger Circle->Munger Division
Approving Authority
Prasoon Kumar, Chief Engineer, bhagalpur (Prasoon Kumar, Chief Engineer, bhagalpur)
Tender Creator
Mr AJAY KUMAR (EXECUTIVE ENGINEER)
Pre-Bid Meeting Start
03-09-2026 11:30:00
Pre-Bid Meeting End
03-09-2026 13:00:00
Pre-Bid Discussion Type
OFFLINE
Pre-Bid Venue
Office of the Executive Engineer, P.H. Division, Munger
| Type | Amount | Currency | Mode | Exemption |
|---|---|---|---|---|
| EMD | ₹6,02,000 | INR | Internet Payment Gateway(IPG),Challan|Bank Guarantee | No |
| Tender Fee | ₹10,000 | INR | Internet Payment Gateway(IPG),Challan| | No |
| Tender Processing Fee | ₹11,800 | INR | Internet Payment Gateway(IPG),Challan| | No |
Registration paper of appropriate class, Govt of Bihar ( Refer NIT)
PAN CARD
GST Registration in State of Bihar with Last Return
Work Experience (Refer Section 1 ITB Clause 4.5A (b) and 4.5 A (c) )
Annual Financial Turn Over (Refer Section 1 ITB Clause 4.5 A (a) )
Affidavit (Refer NIT and SBD Section 2 Qualification Information)
Availability of Key Item of Constructions equipment (Refer SBD Section 2 Qualification Information)
Key Personnel (Refer SBD Section 2 Qualification Information)
Bidding Capacity ( Refer SBD Section 1 ITB Clause 4.7 and SBD Section 2 Qualification Information)
Character Certificate (Refer NIT)
Availability of Credit Facilities / Bank Certificate (Refer SBD Section 1 ITBClause 4.2 (i) and SBD
Litigation History (Refer SBD Section 2 Qualification Information and SBD Clause 4.3)
Undertaking (Refer SBD Section 1 ITB Clause 4.2 (ii) and SBD Section 2 Qualification Information)
Power of Attorney if any
Proposed methodology and programme of construction (Refer SBD Section 1 ITB Clause 4.3 (l) and SBD S
Email id and Mobile no for Communication
Any of Last Three Year Income Tax Return
Any other documents as per NIT
Name of Bidder
PAN No.
GST No.
E-Mail Id
Mobile No.
Accept all terms and Conditions as per NIT/SBD
Accept all terms and Conditions as per NIT/SBD
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
NIT
GENERAL_DOCUMENT
NIT
BOQ
NIT
NIT
NIT
Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P.H. Division, Munger For Year 2026-27.
Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P.H. Division, Munger For Year 2026-27.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Attachment | Rate | Estimated Cost | Mandatory | Price Trends |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P.H. Division, Munger For Year 2026-27. | Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P.H. Division, Munger For Year 2026-27. | Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P.H. Division, Munger For Year 2026-27. | 1 | Work | - | - | Gr_01_Fin_SBD_Q_NIT-04(R1)_2026-27.xlsx | ₹3,00,93,031 | ₹1 | Yes |
Discover companies most likely to bid on this tender