Progress
Hindustan Petroleum Corporation Ltd invites bids for Packaged Drinking Water (non-mineral water) in India, with BOQ showing 0 items and no specified quantity. The tender includes an option clause permitting +/-25% quantity adjustments at contract award and during the currency of the contract at contracted rates. Delivery terms reference the time from the last date of the original delivery order, with a minimum extension rule of 30 days. There is no explicit estimated value or EMD amount disclosed, and location details are not provided in the tender data. This tender requires bidders to align with HPCL procurement practices and the ATC terms uploaded, indicating potential future scope changes and delivery flexibility. A lack of technical specifications suggests emphasis on supplier capability and compliance with standard procurement processes rather than engineered product performance data.
Product/service names: Packaged Drinking Water (non-mineral)
Quantity: 0 BOQ items (no defined quantity; scope may be added via option clause)
EMD/Estimated value: not specified
Delivery: from last date of original delivery order; extended delivery formula provided
Standards: not specified; follow HPCL internal standards and applicable water quality norms
Warranty/Support: not specified; verify with HPCL ATC
Option Clause: quantity may adjust +/-25% at contract and during currency
Delivery Period: starts from last date of original delivery order with 30-day minimum extension
ATC Compliance: bidders must review uploaded ATC document for additional terms
Not specified in tender data; verify in ATC and contractual documents
Delivery period commences from last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in tender data; refer to ATC for LD terms and penalties
Experience in supplying packaged drinking water or related FMCG water packaging
Financial capability to handle HPCL procurement volumes (turnover expectations not published)
Compliance with HPCL ATC requirements and standard procurement norms
Quantity
36000
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Packaged Drinking Water (other than Mineral Water) (Q4)
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
15
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
365
Delivery Locations
1
Delivery Cities
Bhojpur
Delivery Pincodes
802314
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Priyanka Kumari | 802314,HPCL Patna LPG Plant, Gidha Industrial Growth Centre, Arrah, Bhojpur-802314 | Bhojpur | Bihar | 802314 | 36000 | 365 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
19-Oct-2026, 9:30 am
Opening Date
20-Oct-2026, 9:30 am
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar packaging/ water supply projects
Financial statements for last 2-3 years
EMD submission proof (amount/format unspecified)
Technical bid documents demonstrating capability to supply packaged drinking water
OEM authorizations or letter of authorization (if applicable)
Key insights about BIHAR tender market
Bidders should first review the ATC document uploaded by HPCL, confirm eligibility for water supply contracts, and prepare standard documents: GST, PAN, experience certificates, financial statements, and OEM authorizations. Ensure compliance with the 25% quantity option and delivery-extension formula; submit technical and financial bids per HPCL guidelines.
Submit GST registration, PAN card, experience certificates for similar packaging projects, financial statements, EMD proof, technical bid, and OEM authorization if applicable. These items align with typical HPCL bid submissions and the uploaded ATC requirements.
Delivery begins from the last date of the original delivery order; if quantity increases, time extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Additional extensions may apply up to the original delivery period.
The tender data does not specify the exact EMD amount. Bidders should await HPCL ATC for EMD details, then prepare payment via the indicated mode. Ensure financial documents demonstrate capacity to sustain supply commitments under fluctuating quantity.
Tender data lacks explicit standards; bidders must reference HPCL ATC for any required certifications and quality norms. Prepare to demonstrate water quality compliance, supplier certifications, and any ISI or ISO requirements as per HPCL guidelines.
BOQ shows 0 items, indicating undefined quantities. Bidders should rely on HPCL’s internal procurement plan and the 25% option clause to anticipate scope changes. Clarify with HPCL during pre-bid or via the ATC to confirm current and potential quantities.
ATC governs bidder obligations beyond the base tender data, including option quantities, delivery extensions, and compliance criteria. Bidders must review and adhere to all ATC terms to avoid disqualification and ensure alignment with HPCL’s contractual framework.