Progress
The opportunity is a tractor procurement tender issued by the Development and Panchayats Department Haryana for the district of BHIWANI, HARYANA. Category: Tractors (V3) (Q2). The tender notes an option to adjust quantities by up to 25% of the bid quantity at contract placement and during the contract term, at contracted rates. The delivery timeline hinges on the original delivery period, with adjustments based on the option clause, and a minimum calculation period of 30 days. A pre-bulk-supply process requires an advance sample approval within 5 days of contract award, with potential modifications communicated within 5 days. BOQ shows 0 items, indicating a potential single- or multi-vehicle framework pending finalization. Unique terms include conditional quantity adjustments and sample-based approval, underscoring procurement risk management and conformity to contract specifications.
No itemized specifications are published. Bidder attention should prepare for a tractor procurement that will require conformance to eventual technical standards, OEM approvals, and body/attachment compatibility. The terms emphasize a sample-approval workflow, with potential bulk-supply alignment to approved samples. Since BOQ is empty, bidders may anticipate a framework agreement or a capped-number tractor lot with delivery dependent on original delivery period and extended durations via the option clause. Compliance readiness is essential, including documentation and readiness for post-award testing and sample-based validation.
Total Items: 0 (No BOQ items published)
Category: Tractors (V3) (Q2) in Haryana
25% quantity variation allowed at contract placement and during contract term
Advance sample submission within 5 days after award
Sample approval or modification list issued within 5 days of sample submission
25% quantity variation allowed at contract placement and during the contract term
Advance sample approval required within 5 days of contract award
Delivery period adjustments based on the option clause with minimum 30 days extension
Not specified in available data
Delivery period based on original delivery period; extended period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not explicitly stated; deviations may lead to contract termination after notifying seller
Eligibility criteria not specified in the provided data
Procuring entity references standard procurement compliance and sample-based verification
Bidder must be prepared for quantity variation up to 25% and timely submission of advance samples
Quantity
131
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
150
OEM Avg. Turnover
150
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Tractors (V3) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
60
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Bhiwani
Delivery Pincodes
127021
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Gaurav | 127021,Executive Engineer Panchayati Raj BhIwani Zoo Road Panchayat Bawan Bhiwani | Bhiwani | Haryana | 127021 | 131 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about HARYANA tender market
Bidders must prepare for quantity variation up to 25%, submit an advance tractor sample within 5 days of award, and comply with the sample approval process. Ensure documentation includes GST, PAN, and any OEM authorizations. Deliveries align to the original period with potential extensions as per the option clause.
Submit GST registration, PAN card, company registration, experience certificates for similar tractor supply, financial statements, EMD proof (if applicable), technical compliance certificates, and OEM authorizations. Include proof of delivery readiness and references to prior tractor supply contracts.
Specific tractor models and standards are not published; bidders should be prepared for standard tractor compliance and OEM conformity. The process emphasizes advance sample approval within 5 days and modification instructions within 5 days, ensuring conformity with contract specifications.
Delivery timing depends on the original delivery period and may extend via the option clause if quantity increases. The minimum extension baseline is 30 days, with extension calculations based on the ratio of increased quantity to original quantity.
The purchaser may increase or decrease the bid quantity up to 25% at contract placement and during the contract term, at the contracted rates. Delivery schedule adjusts accordingly with the extended period computed by the specified formula.
If the advance sample is not approved within 5 days, the delivery period may be re-fixed without LD for the delay incurred by the buyer, but persistent deviations could lead to fresh samples or contract termination if non-conformity persists.
Explicit LDs are not stated in the available data; however, major deviations from approved samples allow the buyer to terminate the contract after notifying the seller. Timely sample approval and adherence to the approved lot are essential.