TenderDekho Logo
Closed GEM

Joint Venture Of CIL, NTPC, IOCL, FCIL & HFCL Fan Assembly Tender Dhanbad Jharkhand 2026

Bid Publish Date

22-May-2026, 10:19 am

Bid End Date

01-Jun-2026, 4:00 pm

Progress

Issue22-May-2026, 10:19 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Category

FAN ASSEMBLY CONSISTING OF HUB, BUSHING DIA 55 MM

Bid Type

Single Packet Bid

Key Highlights

  • Brand/OEM requirement: Manufacturer Authorization needed when bidding through authorized distributors
  • Technical standards: Data Sheet verification; no explicit IS/ISO numbers provided
  • Special clause: Option to increase/decrease quantity up to 25% with adjusted delivery period
  • Eligibility: PAN, GSTIN, cancelled cheque, EFT mandate required at bid submission
  • Warranty/AMC: Not specified in provided data
  • Penalties: Not explicitly defined in terms; terms allow contract termination by buyer
  • Delivery: Minimum 30 days for extended delivery time when options exercised
  • Invoicing: Invoice to be raised in consignee name with GSTIN of consignee

Categories 9

Tender Overview

Organization: Joint Venture Of Cil, Ntpc, Iocl, Fcil & Hfcl. Procurement: Fan assembly packages including hub and bushing configurations with diameters 55 mm and 50 mm. Location: Dhanbad, Jharkhand 826001. Estimated value: Not disclosed. Delivery scope: Not specified; option clause permits quantity adjustments up to 25% and extended delivery calculations. Context: multiple public-sector stakeholders collaborate to source essential cooling components. Unique aspect: Data Sheet verification and OEM authorization prerequisites ensure authentic product compliance.

Technical Specifications & Requirements

  • Product category: Fan assembly with hub and bushing components (55 mm and 50 mm variants).
  • Data Sheet requirement: Upload data sheet matching offered specifications; mismatches may lead to bid rejection.
  • Authorisation: OEM/Original Service Provider authorization required if bidding through authorized distributor.
  • Invoicing: Invoice must be in consignee name with consignee GSTIN.
  • General terms: GST compliance managed by bidder; supplier bears GST risk; data sheet and data integrity are critical.
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate certified by bank.

Terms & Eligibility

  • Quantity flexibility: Up to 25% increase/decrease during contract; delivery timeline adjusts per formula, minimum 30 days.
  • Trade documents: PAN, GSTIN, cancelled cheque, EFT mandate; data sheet; OEM authorization where applicable.
  • Delivery & liability: Seller remains liable jointly with assignee/sub-contractor; contract assign/sub-contract requires buyer consent.
  • Payment terms & GST: GST handling as per actuals or applicable rate (whichever lower).

Key Specifications

  • Fan assembly with hub diameter variants: 55 mm and 50 mm

  • BoQ items not provided; no numeric quantities disclosed

  • Data Sheet verification as a gating parameter

  • GST invoicing in consignee name with consignee GSTIN

  • OEM authorization required when applicable

Terms & Conditions

  • Quantity may be adjusted up to 25% during contract at contracted rates

  • GST handling as actuals or applicable rate; bidder to determine

  • Bidder must provide PAN, GSTIN, cancelled cheque, EFT mandate

  • Data Sheet must match offered product specifications

Important Clauses

Payment Terms

GST will be reimbursed as actuals or at applicable rates (whichever is lower); bidder bears GST classification

Delivery Schedule

Delivery period calculated from last date of original delivery order; extended time when option exercised follows formula with a minimum 30 days

Penalties/Liquidated Damages

Buyer reserves right to terminate contract; no explicit LD percentage provided in data

Bidder Eligibility

  • Must submit PAN, GSTIN, cancelled cheque, and EFT mandate

  • OEM authorization when bidding via authorized distributors

  • Data Sheet must align precisely with offered product specifications

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FAN ASSEMBLY CONSISTING OF HUB, BUSHING DIA 55 MM , FAN ASSEMBLY CONSISTING OF HUB BUSHING 50 MM

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9259347.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

PAN card copy

2

GSTIN copy

3

Cancelled cheque

4

EFT mandate certified by bank

5

Product data sheet uploaded with bid

6

OEM authorization form/certificate for authorized distributors

7

Vendor data sheet for product matching requested specifications

Financial Results

Rank Seller Price Item
L1
******   Under PMA
Item Categories : FAN ASSEMBLY CONSISTING OF HUB, BUSHING DIA 55 MM,FAN ASSEMBLY CONSISTING OF HUB BUSHING 50 MM

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for fan assembly tender in Dhanbad Jharkhand 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, plus a data sheet matching the offered fan hub/bushing specs (55 mm and 50 mm). OEM authorisation is required for distributors. Ensure GST handling aligns with actuals or lower applicable rates and comply with 25% quantity flexibility terms.

What documents are required for the fan assembly procurement in Jharkhand

Submit PAN, GSTIN, cancelled cheque, EFT mandate, and a product data sheet. If bidding through an authorized distributor, provide OEM authorization details. Ensure invoice will be raised in the consignee name with the consignee GSTIN and that data sheet matches the offered product.

What are the delivery time rules for quantity variations in this tender

Delivery time adjusts with a 25% quantity fluctuation; calculated extra time equals (increased quantity / original quantity) × original delivery period, with a minimum of 30 days. Original delivery timelines may extend up to the full original period upon option exercise.

What is required for OEM authorization in the fan assembly tender

Provide an OEM authorization form/certificate detailing name, designation, address, email, and phone number of the authorizing official. This applies when bidding through an authorized distributor to verify product provenance and compliance.

How is GST handled for this fan assembly contract in Dhanbad

GST reimbursement is based on actuals or the applicable rate, whichever is lower, subject to the quoted GST percentage. Bidder bears GST risk during quoting; ensure GSTIN and invoicing align with consignee details.

What are the key data sheet requirements for bid submission

Upload a complete data sheet for the offered fan assembly, ensuring all technical parameters match the bid. Mismatches can lead to bid rejection; cross-verify hub/bushing dimensions (55 mm and 50 mm) and related specifications.

What are the invoicing requirements for this supply contract

Invoices must be raised in the consignee name and include the consignee GSTIN. Ensure the GST treatment aligns with the tender terms and the data sheet validation to avoid payment delays.

Where to verify compliance with supplier data sheet in this tender

Compliance is verified by the buyer through the uploaded data sheet and its alignment with the product specifications in the bid. Ensure all technical parameters are exact and consistent with hub and bushing configurations.