FLUID COUPLING MODEL SMD-7
Bokaro Steel Plant
BOKARO, JHARKHAND
Bid Publish Date
24-Feb-2026, 1:05 pm
Bid End Date
11-Mar-2026, 2:00 pm
Location
Progress
Quantity
7
Category
COMPLETE FLUID COUPLING, MODEL NO: FCU 12.75
Bid Type
Single Packet Bid
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow, invites bids for the ** COMPLETE FLUID COUPLING, MODEL FCU 12.75** and the 12.75 FCU SEAL KIT. The scope is limited to the supply of goods with no BOQ items listed. The tender contemplates a flexible quantity approach, allowing up to 25% quantity variation at contract award and during the contract currency at contracted rates. The procurement is positioned within the Uttar Pradesh Energy Department’s equipment inventory refresh. The absence of technical specs signals reliance on standard FCU 12.75 assemblies and seal kits, with delivery periods aligned to order placement and option quantities.
Product/service names: COMPLETE FLUID COUPLING, MODEL FCU 12.75; 12.75 FCU SEAL KIT
Quantity/scale: not specified in BOQ; scope is supply of goods only
Estimated value/EMD: not disclosed
Category/type: fluid coupling components and seal kit for FCU 12.75
Delivery/location: Lucknow, Uttar Pradesh (organization base); delivery terms per option clause
Experience/quality: no explicit specs; bidders should ensure OEM-grade components and compatibility
Warranty/after-sales: not specified in data; assume standard supplier warranty per terms
Option clause allows +/- 25% quantity variation at contract and during currency
Delivery period calculation follows (increased quantity ÷ original quantity) × original delivery period, min 30 days
Scope limited to supply of goods; no installation or commissioning included
No explicit payment terms published; bidders should anticipate standard government procurement terms and OEM-backed warranty requirements
Delivery timing tied to order date and option clause; extended period calculations apply with minimum 30 days
No LD details published; bidders should assume standard contractual penalties for late delivery per UP government norms
Experience in supplying fluid couplings or FCU seal kits to energy or utility sectors
Valid GST registration and PAN card
OEM authorization or documented capability to supply FCU 12.75 components
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bokaro Steel Plant
BOKARO, JHARKHAND
Nmdc Limited
BELLARY, KARNATAKA
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Rourkela Steel Plant
KENDUJHAR, ODISHA
Northern Coalfields Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar fluid coupling/seal kit supply
Audited financial statements (last 3 years)
Bid security/EMD submission document (as per supplier norms; amount TBD)
Technical compliance certificates (OEM authorizations, if required)
manufacturer/supplier authorization letter for FCU 12.75 products
Bidders should submit the goods-only bid with OEM authorization, GST and PAN, financial statements, and experience certificates. Ensure compliance with option clause allowing ±25% quantity variation and adhere to the delivery rules calculated as per the contract's extended period formula.
Submit GST registration, PAN, experience certificates for FCU components, financial statements, EMD/security deposit, OEM authorizations, and technical bid documents. Include proof of prior supply of FCU components to energy sector clients, and packaging suitable for field deployment.
The scope is strictly supply of goods for COMPLETE FLUID COUPLING and 12.75 FCU SEAL KIT, with no installation or commissioning services included. Ensure OEM-grade quality and compatibility with existing UP energy assets.
Delivery follows order date and option quantity rules. If quantity increases, delivery time is (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The purchaser can extend this to the original delivery period as needed.
Eligibility includes demonstrated experience in supplying FCU components, GST and PAN compliance, financial robustness through recent statements, and OEM authorization where necessary. Bidders should also match product compatibility for FCU 12.75 assemblies.
No explicit standards are published; bidders should ensure OEM-grade FCU 12.75 and seal kit components are compatible with energy assets. Where applicable, provide OEM authorization and quality certificates to demonstrate conformity.
Delivery timing begins from the last date of the original delivery order. During extended periods, the additional time is calculated per the option clause, with a minimum of 30 days and potential extension to the original period.