Bid Publish Date
12-Oct-2026, 10:41 am
Bid End Date
24-Oct-2026, 9:00 am
Location
Progress
The Indian Air Force (Department Of Military Affairs) invites bids for the procurement of alternator belts and water pumps under a government tender in India. The contract contemplates possible quantity variation up to 25% of bid quantity during and after award, at contracted rates, with delivery periods linked to the original order date. Bidders should align with the ATC and any corrigenda; certificate uploads are mandatory to avoid rejection. This procurement lacks BOQ items and publicized specifications, signaling a flexible scope with emphasis on compliance and supplier capability to meet delivery and documentation requirements. A key differentiator is the option clause governing quantity fluctuations, requiring bidders to plan for dynamic demand within contractual rates. Unique terms include the need to calculate extended delivery time as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
There are no explicit technical specifications published in the tender data. The procurement category covers alternator belts and water pumps, but no model numbers, capacities, voltages, or certification demands are listed in the available documents. Tender terms emphasize certificate uploads (as part of ATC compliance) and adherence to posted ATC/corrigenda. The absence of BOQ items implies the supplier must rely on standard industry specifications and provide documentation proving compatibility with IAF equipment and operating conditions, while remaining compliant with bid conditions.
Key terms include an option to increase/decrease quantity by up to 25%, with extended delivery time calculated per formula, and minimum 30 days. Certificate/document uploads are mandatory; failure to provide may lead to rejection. The tender lacks disclosed EMD, estimated value, or exact delivery dates. Compliance with ATC/corrigendum is required, along with standard bid submission prerequisites. Respondents should be prepared to demonstrate capability to supply alternator belts and water pumps meeting general aerospace/defense reliability expectations and to adjust quantities per contract progression.
Product/service names: alternator belts, water pumps
Estimated value: not disclosed in data
EMD amount: not disclosed in data
Experience: prior supply of similar hardware recommended by ATC
Quality/compliance: certificate uploads per ATC
Delivery: proportional extended delivery time formula with minimum 30 days
Option clause allows ±25% quantity variation at contracted rates
Delivery time extensions calculated by (increase/original) × original delivery period
Mandatory submission of certificates/documents as per ATC and Corrigendum
Not disclosed in available data; payment terms to be stated in ATC
Delivery period linked to last date of original delivery order with potential extension per option clause
Not specified in provided data
Demonstrated capability to supply alternator belts and water pumps for aerospace/defense use
Mandatory upload of certificates and compliance documents per ATC
No disqualifying conflicts of interest as per government procurement norms
Quantity
7
Category
ALTERNATOR FAN BELT
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
ALTERNATOR FAN BELT , WATER PUMP
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
GHAZIABAD
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | GHAZIABAD | GHAZIABAD | - | - | 5 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for similar supply of alternator belts or water pumps
Financial statements showing turnover (if requested in ATC)
EMD/Security deposit (amount not disclosed; submit as per ATC if specified)
Technical bid documents and manufacturer/OEM authorizations
Certificates validating compliance with any ISI/ISO standards if referenced in ATC
Any ATC/corrigendum attachments
Key insights about UTTAR PRADESH tender market
Bidders must submit certificates per ATC, provide OEM authorizations, and upload technical bid documents. The contract permits a 25% quantity variation and requires understanding of the delivery extension formula. Ensure compliance with ATC/corrigendum and prepare relevant supplier experience proofs for similar hardware.
Submit GST certificate, PAN card, experience certificates for relevant hardware, financial statements, EMD/Security as per ATC, technical compliance certificates, OEM authorizations, and any ATC/corrigendum attachments. Ensure all documents are current and match tender criteria.
Delivery timelines tie to the original delivery order date. If quantity increases, extended time = (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. The purchaser may extend this during the option period while maintaining contracted rates.
While not specified in the available data, bidders should be prepared to provide certificates per ATC, OEM authorizations, and any referenced standards in corrigenda. Typical requirements include quality management and supplier certifications relevant to aerospace components.
The purchaser can increase/decrease quantity up to 25% at contracted rates. Delivery time adjusts based on the formula above, ensuring a minimum 30-day extension when applicable. Bidders must factor this into planning and pricing.
The exact EMD amount is not disclosed in the available data. Bidders should consult the ATC and corrigenda, or the purchasing portal, to obtain the required EMD figure and submission method.
ATC requires certificate uploads, adherence to the bid document, ATC/corrigendum compliance, and potentially OEM authorizations. Ensure your submission includes all mandated documents and any standard compliance certificates referenced in the ATC.