Indian Army Panel Mounting Switches and Electrical Components Tender 2025 Rajasthan-IS 550/ISI-compliant Equipment 2025
Indian Army
MATHURA, UTTAR PRADESH
Bid Publish Date
30-Jan-2026, 12:30 pm
Bid End Date
09-Feb-2026, 1:00 pm
Location
Progress
Quantity
57
Category
PANNEL BOARD MOUNTING PAD
Bid Type
Two Packet Bid
The Indian Army, under the Department of Military Affairs, seeks procurement and associated services for a comprehensive set of electrical panels and components including PANNEL BOARD MOUNTING PAD, HEAD STUD, AMPER METER AC, VOLT METER AC, FREQUENCY METER, MCB DOUBLE 63 AMP, STARTING PUSH BUTTON, STOP BUTTON, AVR, SOCKET 63AMP 4 PIN, IGNITION KEY, TOGGLE SWITCH, WARNING LAMP, DC WIRE, ARMATURE PAD L225, BTY TERMINAL and related items. The scope covers supply, installation, testing, commissioning of goods and training of operators, with statutory clearances if required. The bid includes option to adjust quantities by up to 50% during contract execution. Estimated value and EMD are not disclosed. Deliveries may scale with contract needs as per terms.
Key differentiators include a detailed turnover criterion and OEM turnover requirements, plus vendor code creation documentation (PAN, GSTIN, cancelled cheque, EFT mandate). The BOQ lists 19 items with unspecified quantities, signaling a broad, category-wide electrical panel and accessories procurement for military installations across unspecified locations in India.
PANNEL BOARD MOUNTING PAD
AMPER METER AC
VOLTS METER AC
FREQUENCY METER
MCB DOUBLE 63 AMP
STARTING PUSH BUTTON
STOP BUTTON
BTY LEAD PLUS V / BTY LEAD MINUS V
AVR
SOCKET 63AMP 4 PIN
IGNITION KEY
TOGGLE SWITCH
WARNING LAMP
DC WIRE
ARMATURE PAD L225
BTY TERMINAL
GASKET KIT
Scope: Supply, Installation, Testing, Commissioning, Training
50% quantity variation right during contract and currency of contract
OEM and Bidder turnover criteria with 3-year financials
Vendor code creation documents required for bid participation
Not specified in data; bidders should verify official bid document for payment milestones and advances
Delivery period governed by option clause; calculated extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in data; confirm in official bid documents
Minimum average turnover as per bid document for bidder and OEM over last 3 financial years
Evidence via audited financial statements or CA/Cost Accountant certificate
PAN, GSTIN, and EFT mandate for vendor code creation
Ability to supply, install, test, commission and train operators for electrical equipment
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
MATHURA, UTTAR PRADESH
Indian Army
Indian Army
Sri Ganganagar, RAJASTHAN
Indian Army
MATHURA, UTTAR PRADESH
Assam Rifles
CHURACHANDPUR, MANIPUR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | PANNEL BOARD MOUNTING PAD | PANNEL BOARD MOUNTING PAD | 5 | pieces | moregem | 15 |
| 2 | HEAD STUD | HEAD STUD | 4 | pieces | moregem | 15 |
| 3 | AMPER METER AC | AMPER METER AC | 1 | pieces | moregem | 15 |
| 4 | VOLT METER AC | VOLT METER AC | 1 | pieces | moregem | 15 |
| 5 | FREQUENCY METER | FREQUENCY METER | 1 | pieces | moregem | 15 |
| 6 | MCB DOUBLE 63 AMP | MCB DOUBLE 63 AMP | 1 | pieces | moregem | 15 |
| 7 | STARTING PUSH BUTTON | STARTING PUSH BUTTON | 1 | pieces | moregem | 15 |
| 8 | STOP BUSH BUTTON | STOP BUSH BUTTON | 1 | pieces | moregem | 15 |
| 9 | BTY LEAD PLUS V | BTY LEAD PLUS V | 1 | pieces | moregem | 15 |
| 10 | BTY LEAD MINUS V | BTY LEAD MINUS V | 1 | pieces | moregem | 15 |
| 11 | AVR | AVR | 1 | pieces | moregem | 15 |
| 12 | SOCKET 63AMP 4 PIN | SOCKET 63AMP 4 PIN | 2 | pieces | moregem | 15 |
| 13 | IGNATION KEY | IGNATION KEY | 1 | pieces | moregem | 15 |
| 14 | TOGGLE SWITCH | TOGGLE SWITCH | 1 | pieces | moregem | 15 |
| 15 | WARNING LAMP | WARNING LAMP | 6 | pieces | moregem | 15 |
| 16 | DC WIRE | DC WIRE | 25 | pieces | moregem | 15 |
| 17 | ARMATURE PAD L225 | ARMATURE PAD L225 | 1 | pieces | moregem | 15 |
| 18 | BTY TERMINAL | BTY TERMINAL | 2 | pieces | moregem | 15 |
| 19 | GASKET KIT | GASKET KIT | 1 | pieces | moregem | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Audited balance sheets or CA/Cost Accountant turnover certificate for last 3 years (Bidder and OEM)
OEM authorization (if applicable)
Technical bid documents as per tender
Any additional statutory registrations as required by the tender
Key insights about UTTAR PRADESH tender market
This Army procurement requires submitting PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation, plus turnover evidence for bidder and OEM. The scope includes supply, installation, testing, commissioning, and operator training; ensure compliance with option clause and 50% quantity variation terms.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, audited balance sheets or CA certificate showing 3-year turnover, OEM authorization if applicable, technical bid, and any statutory registrations. Include turnover evidence for both bidder and OEM per tender terms.
Scope includes Supply, Installation, Testing, Commissioning of PANNEL BOARD MOUNTING PAD and related items, plus Training of operators and providing statutory clearances if required. The bid covers 19 listed items with unspecified quantities and comprehensive installation services.
If quantities increase, delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend duration up to the original delivery period under exercised option terms.
Bidder and OEM must show minimum average annual turnover over the last 3 years, supported by audited statements or CA certificate. If the company is under 3 years, turnover is calculated on completed years after incorporation for eligibility.
The tender data does not list explicit ISO or BIS standards; bidders should rely on organization-specific military procurement guidelines and OEM capabilities. Ensure all equipment compatibility with electrical assemblies and on-site installation readiness.