Indian Army West Delhi Department Of Military Affairs False Ceiling Repair & Allied Works Tender 2026

Bid Publish Date

16-Sep-2026, 9:55 pm

Bid End Date

03-Oct-2026, 11:00 am

Generate Docs

Progress

Issue16-Sep-2026, 9:55 pm
Corrigendum28-Sep-2026
AwardPending

Key Highlights

  • • Relevant organization: Indian Army under Department Of Military Affairs operating in WEST DELHI, DELHI 110008
  • • Scope includes false ceiling repair, DG RTG Office complex upgrades, AC Spilt 1 Ton 3 Star units, MCB 32 Amp, drainage, wiring, furniture, and miscellaneous labour
  • • Important clause: option to increase/decrease quantity up to 25% at contracted rates during and after award
  • • Delivery extension mechanism: extra time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Tender Overview

The Indian Army's Department Of Military Affairs in WEST DELHI, DELHI 110008 invites bids for a broad range of civil and fit-out works labeled under false ceiling repair, DG RTG Office complex upgrades, air conditioning spilt units, electrical fittings, and associated labour. The scope references 19 BOQ items covering items from ceiling works to office furniture and small hardware, with a unified contract framework. The tender emphasizes adaptable quantity handling, enabling up to a 25% variation in ordered quantities and extended delivery timelines under the option clause. Bidders should prepare for a multi-discipline supply, installation, and labour contract across the DG RTG Office complex. Unique terms anchor the procurement in standard military project processes and ensure compatibility with existing infrastructure.

Technical Specifications & Requirements

  • No explicit technical specifications are published in the tender data; the BoQ lists 19 items with N/A quantities, indicating a framework for multiple small works rather than a single, itemized bill.
  • The contract includes an option clause permitting up to 25% quantity variation at contracted rates during placement or currency of the contract.
  • Delivery timeline mechanics: delivery starts from the last date of the original delivery order; extended time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
  • The tender aggregates diverse trades (false ceiling, DG RTG office, AC installation, electrical fittings, and furniture) under a single procurement package.
  • The absence of explicit standards suggests bidders must plan for standard civil, electrical, and HVAC installation practices compatible with government infrastructure.

Terms, Conditions & Eligibility

  • The offer is governed by a flexible option clause allowing a maximum of 25% variance in quantity and corresponding delivery extensions.
  • Delivery period mechanics and calculation method are specified; contractors should prepare for staged delivery aligned to original and extended periods.
  • The data provides no explicit EMD amount, payment terms, or mandatory documents, requiring bidders to monitor for corrigenda or submit typical government bid documents upon explicit notice.

Key Specifications

    • BoQ items: 19 items listed; exact quantities not disclosed in data
    • Trade scope: false ceiling repair, DG RTG Office complex upgrades, AC installation, electrical wiring, and furniture fitting
    • Delivery clause: delivery start from last date of original order; extended period 30+ days minimum
    • Variation clause: up to 25% quantity adjustment at contracted rates
    • Standards/Compliance: not specified; bidders should ensure general government civil/electrical/HVAC compatibility

Terms & Conditions

  • EMD: not disclosed in tender data; await corrigendum

  • Delivery: based on original order date with 30-day minimum extension rule

  • Quantity variation: up to 25% at contracted rates

  • BOQ: 19 items with N/A quantities; multi-trade scope

  • Documents: standard bid documents to be provided per corrigendum

Important Clauses

Option Clause

Purchaser may alter quantity by up to 25% at contracted rates during or after award, affecting delivery schedules.

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extended time is calculated by the provided formula with a 30-day minimum.

Penalties/Liquidated Damages

No explicit LD terms published in data; bidders should review corrigenda for penalty provisions.

Bidder Eligibility

  • Experience in multi-discipline civil/electrical/HVAC installations

  • Financially stable with verifiable turnover in relevant sectors

  • Capability to manage 19-item multi-trade scope under a single contract

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

228

Category

False Ceiling Repair DG Rtg Office complex

Bid Type

Single Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

1

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

False Ceiling Repair DG Rtg Office complex , False Ceiling ADG , AC Spilt Voltas 1 Ton 3 Star , MCB 32 Amp , Drain Pipe 2 Mtr , AC Wire , AC Stand , Labour Charges for Fitting of Spilt AC incl clip on boards , Visitor Chair for Conf Room , Centre Table 4 x 2 Feet with glass top , Steel Box 35 x 20x 18 inches , Padlock 50 mm , Isihar Colour Vision Chart , Eye Vision Box , Near Vision Chart , Goniometer CV Check Steel , Pen Torch Every Day Digi LED , Otoscope Tip 30 Pc , Eye Vision Spectlus

Pre-Bid & Qualification

Pre-Bid Date

18-09-2026 09:00:00

Pre-Bid Venue

IRO

Delivery Details

Max Delivery Days

20

Delivery Locations

1

Delivery Cities

South West delhi

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-South West delhiSouth West delhi--120-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9904067.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

False Ceiling Repair DG Rtg Office complex

Good Quality

1 nos Delivery: 20 days
#2

False Ceiling ADG

Good Quality

120 sq feet Delivery: 20 days
#3

AC Spilt Voltas 1 Ton 3 Star

Good Quality

1 nos Delivery: 20 days
#4

MCB 32 Amp

Good Quality

1 nos Delivery: 20 days
#5

Drain Pipe 2 Mtr

Good Quality

2 mtr Delivery: 20 days
#6

AC Wire

Good Quality

4 mtr Delivery: 20 days
#7

AC Stand

Good Quality

1 nos Delivery: 20 days
#8

Labour Charges for Fitting of Spilt AC incl clip on boards

Good Quality

1 nos Delivery: 20 days
#9

Visitor Chair for Conf Room

Good Quality

6 nos Delivery: 20 days
#10

Centre Table 4 x 2 Feet with glass top

Good Quality

1 nos Delivery: 20 days
#11

Steel Box 35 x 20x 18 inches

Good Quality

16 nos Delivery: 20 days
#12

Padlock 50 mm

Good Quality

26 nos Delivery: 20 days
#13

Isihar Colour Vision Chart

Good Quality

2 nos Delivery: 20 days
#14

Eye Vision Box

Good Quality

2 nos Delivery: 20 days
#15

Near Vision Chart

Good Quality

2 nos Delivery: 20 days
#16

Goniometer CV Check Steel

Good Quality

5 nos Delivery: 20 days
#17

Pen Torch Every Day Digi LED

Good Quality

6 nos Delivery: 20 days
#18

Otoscope Tip 30 Pc

Good Quality

30 nos Delivery: 20 days
#19

Eye Vision Spectlus

Good Quality

1 nos Delivery: 20 days
Advertisement

Categories 21

Corrigendum Updates

2 Updates
#1

Update

28-Sep-2026

Extended Deadline

03-Oct-2026, 5:30 am

Opening Date

04-Oct-2026, 5:30 am

#2

Update

28-Sep-2026

Extended Deadline

30-Sep-2026, 5:30 am

Opening Date

01-Oct-2026, 5:30 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar multi-discipline contracts

4

Financial statements (annual turnover proof)

5

EMD/Security deposit documents (as applicable in corrigendum)

6

Technical bid documents demonstrating compliance with multi-trade installation

7

OEM authorizations or vendor accreditation for specified items (if required in corrigendum)

Frequently Asked Questions

Key insights about DELHI tender market

How to bid for the West Delhi Indian Army false ceiling tender 2026

Bidders should submit standard government bid documents, including GST, PAN, and financials, along with a technical bid covering multi-trade installation. The tender allows up to 25% quantity variation; ensure your proposal accounts for potential scope changes and delivery extensions per the clause.

What documents are required for Indian Army procurement in Delhi 2026

Prepare GST certificate, PAN, experience certificates for similar multi-trade contracts, financial statements, and EMD documents as applicable in corrigendum. Include OEM authorizations if required and technical bid documentation demonstrating readiness for ceiling, electrical, HVAC, and furniture works.

What are the delivery terms for the Indian Army procurement in West Delhi

Delivery begins from the last date of the original delivery order; extended delivery time uses the formula (increased quantity ÷ original quantity) × original period, with a minimum of 30 days. Plan phased deliveries for 19 BoQ items under a single contract.

Which items are covered under the 19 BoQ entries in Delhi tender

The BoQ comprises 19 items spanning false ceiling repair, DG RTG Office complex upgrades, AC spilt units, electrical fittings, drainage, and furniture assembly. Exact item quantities are not disclosed in the data and will be clarified in corrigendum.

What is the scope of work for the DG RTG Office complex tender

Scope includes ceiling repair, AC installation (1 Ton 3 Star split), MCB 32 Amp, wiring, drain piping, office furniture assembly, and related labour; the contract consolidates civil, electrical, HVAC and furniture works under a unified procurement.

What are the evaluation criteria for this Indian Army tender in Delhi

Evaluation will consider technical capability to manage a multi-trade scope, financial stability, and compliance with standard government procurement norms. The option clause allowing 25% quantity variation will influence bid competitiveness and price evaluation.

How to ensure compliance with the 25% variation clause in Delhi tender

Prepare a flexible pricing/quoting model that accommodates up to 25% quantity changes. Include contingency plans for supply, installation, and labour across ceiling, electrical, and HVAC works, with clearly defined rates applicable to additional quantities.

When will corrigendum clarify EMD and payment terms for the Delhi tender

Corrigendum will specify EMD amount, payment terms, and mandatory submission documents. Until then, bidders should prepare standard EMD proof and financial documents and await official clarifications to align with government procurement norms.