Progress
Quantity
2820
Organization: Bharat Earth Movers Limited (BEML) under the Department of Defence Production. Procurement scope covers multiple welding and gas-handling accessories including regulators for acetylene and oxygen, nozzle components for cutting, torches (CO2 MIG), argon pressure regulators, and assorted contact tips (e.g., 1.6 mm, 1.2 mm), spiral assemblies, and M8-threaded tips. Estimated value and quantities are not disclosed; tender enumerates a 10-item BOQ with N/A quantities. Tender is issued in India with a two-bid system (Technical and Commercial) and requires GST-compliant invoicing to the consignee. Unique terms impose disciplined compliance on invoicing, assignment, and subcontracting, with liability shared among seller and assignee/sub-contractor. This tender emphasizes compliance documentation, EFT mandates, and bank-certified GST processes, and prohibits extraneous commercial details in the technical bid. A notable requirement is uploading Annexure A compliance with seal and sign. The bid environment centers on procurements for defense production components, with emphasis on financial and legal compliance rather than product specs.
N/A
EMD details not explicit; verify in ATC
Two-bid submission with separation of technical and commercial bids
GST invoicing must match consignee GSTIN and be uploaded on GeM
GST-compliant invoicing; GST portal payment proof required; prices quoted to include all charges.
Delivery period terms exist but are not specified in the provided data; contract may be terminated for failure to deliver.
Termination rights exist for delivery defaults and non-compliance; no explicit LD rate published here.
Submit GSTIN, PAN, cancelled cheque, and EFT mandate
Compliance with Annexure A (sealed and signed) with technical bid
No commercial details in the technical bid; adherence to two-bid system
Tender Category
Goods
Bid To RA
No
Item Category
Regulator acetylene , REGULATOR OXYGEN , Nozzle cutting 3 by 64 , Nozzle cutting 1 by 16 , TORCH CO2 MIG , Argon pressure Regulator , Contact Tip 1.6 mm , Contact Tip 1.2 mm , Spiral Assembly , Contact Tip 1.2 by M8
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Regulator acetylene
Regulator acetylene
REGULATOR OXYGEN
REGULATOR OXYGEN
Nozzle cutting 3 by 64
Nozzle cutting 3 by 64
Nozzle cutting 1 by 16
Nozzle cutting 1 by 16
TORCH CO2 MIG
TORCH CO2 MIG
Argon pressure Regulator
Argon pressure Regulator
Contact Tip 1.6 mm
Contact Tip 1.6 mm
Contact Tip 1.2 mm
Contact Tip 1.2 mm
Spiral Assembly
Spiral Assembly
Contact Tip 1.2 by M8
Contact Tip 1.2 by M8
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Regulator acetylene | Regulator acetylene | 40 | pieces | [email protected] | 45 | |
| 2 | REGULATOR OXYGEN | REGULATOR OXYGEN | 40 | pieces | [email protected] | 45 | |
| 3 | Nozzle cutting 3 by 64 | Nozzle cutting 3 by 64 | 40 | pieces | [email protected] | 45 | |
| 4 | Nozzle cutting 1 by 16 | Nozzle cutting 1 by 16 | 20 | pieces | [email protected] | 45 | |
| 5 | TORCH CO2 MIG | TORCH CO2 MIG | 35 | pieces | [email protected] | 45 | |
| 6 | Argon pressure Regulator | Argon pressure Regulator | 45 | pieces | [email protected] | 45 | |
| 7 | Contact Tip 1.6 mm | Contact Tip 1.6 mm | 500 | pieces | [email protected] | 45 | |
| 8 | Contact Tip 1.2 mm | Contact Tip 1.2 mm | 1,500 | pieces | [email protected] | 45 | |
| 9 | Spiral Assembly | Spiral Assembly | 200 | pieces | [email protected] | 45 | |
| 10 | Contact Tip 1.2 by M8 | Contact Tip 1.2 by M8 | 400 | pieces | [email protected] | 45 |
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | MJ TRADERS Under PMA | - | 03-11-2025 14:52:09 | |
| 2 | SUPREME AGENCIES Under PMA | - | 28-10-2025 16:53:17 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SUPREME AGENCIES(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Regulator acetylene,REGULATOR OXYGEN,Nozzle cutting 3 by 64,Nozzle cutting 1 by 16,TORCH CO2 MIG,Ar |
Key insights about KARNATAKA tender market
Bidders must prepare GSTIN, PAN, cancelled cheque, and bank EFT mandate; upload Annexure A compliance with seal; submit a two-bid proposal with separate Technical and Commercial bids; ensure GST-compliant invoicing to the consignee through GeM.
Required documents include: PAN card, GSTIN certificate, cancelled cheque, EFT mandate certified by bank, GST invoice proof, and annexure-compliant sealed bid; ensure all ATC certificates are uploaded if specified in bidder terms.
Delivery terms are tied to contract delivery period; non-delivery or delayed delivery can trigger contract termination per ATC terms; ensure timely delivery and replacement for defective materials as per buyer’s rights.
Invoices must be raised in the consignee’s name with the consignee GSTIN; upload scanned GST invoice and GST payment screenshot during GeM submission to ensure compliant payment processing.
Tender requires a separate technical bid containing technical details only; commercial details must be withheld from the technical bid; bids are evaluated in a two-stage process before final award.
Annexure A compliance must be sealed and signed and uploaded with the technical bid; ensure all supplier certifications are present and upload as required; ATC clauses emphasize documentation integrity.
Contractual termination rights apply if delivery is not met, or material is defective or not replaced promptly; bidders should have robust supply and contingency plans to avoid termination.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS