TenderDekho Logo
Active GEM

Procurement Opportunity: Oven Toaster Griller,Microwave Oven,Digital Refractometer,Ice Cream Making Machine,Digital Micromet in RATNAGIRI, MAHARASHTRA

Bid Publish Date

22-Oct-2026, 2:56 pm

Bid End Date

07-Nov-2026, 12:00 pm

EMD

₹17,000

Value

₹47,01,816

Location

RATNAGIRI , MAHARASHTRA

Progress

Issue22-Oct-2026, 2:56 pm
AwardPending

Directorate Of Technical Education has released a public tender for Oven Toaster Griller, Microwave Oven, Digital Refractometer, Ice Cream Making Machine, Digital Micromet in RATNAGIRI, MAHARASHTRA. Quantity: 151. Submission Deadline: 07-11-2026 12: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

151

Category

DC Shunt Motor

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Warranty Period

2 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

AXIS BANK LTD

ePBG Percentage

0.01%

ePBG Duration (Months)

26

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Ratnagiri

Delivery Pincodes

415612

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ranadhir Raghunath Landge415612,Government College of Engineering, Ratnagiri, Near Thiba palace Road, Ratnagiri.RatnagiriMaharashtra415612145-

Authority Records

HIGHER AND TECHNICAL EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10044983.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 120 Items Sign in for GEM prices

#1

Oven Toaster Griller

Oven Toaster Griller

1 pieces Delivery: 45 days
#2

Microwave Oven

Microwave Oven

1 pieces Delivery: 45 days
#3

Digital Refractometer

Digital Refractometer

1 pieces Delivery: 45 days
#4

Ice Cream Making Machine

Ice Cream Making Machine

1 pieces Delivery: 45 days
#5

Digital Micrometer

Digital Micrometer

1 pieces Delivery: 45 days
#6

Cream Seperator

Cream Seperator

1 pieces Delivery: 45 days
#7

Weighing Balance 0 to 200gm Top loading balance

Weighing Balance 0 to 200gm Top loading balance

2 pieces Delivery: 45 days
#8

Food Processor

Food Processor

1 pieces Delivery: 45 days
#9

Hunter Colour Meter

Hunter Colour Meter

1 pieces Delivery: 45 days
#10

Electronic weighing Balance 0.01 200g

Electronic weighing Balance 0.01 200g

1 pieces Delivery: 45 days
#11

Magnetic Stirrer With Hot Plate

Magnetic Stirrer With Hot Plate

1 pieces Delivery: 45 days
#12

Digital Ph Meter

Digital Ph Meter

1 pieces Delivery: 45 days
#13

Dessicator 100mm

Dessicator 100mm

1 pieces Delivery: 45 days
#14

Thin Layer Chromatography Assembly

Thin Layer Chromatography Assembly

1 pieces Delivery: 45 days
#15

Digital Bomb Calorimeter

Digital Bomb Calorimeter

1 pieces Delivery: 45 days
#16

Gel Electrophoresis Apparatus

Gel Electrophoresis Apparatus

1 pieces Delivery: 45 days
#17

Reynolds Apparatus

Reynolds Apparatus

1 pieces Delivery: 45 days
#18

Sieve Shaker Table Top Model

Sieve Shaker Table Top Model

1 pieces Delivery: 45 days
#19

Homogenizer

Homogenizer

1 pieces Delivery: 45 days
#20

Hot Air Oven

Hot Air Oven

1 pieces Delivery: 45 days
#21

Digital colony counter

Digital colony counter

1 pieces Delivery: 45 days
#22

Autoclave

Autoclave

1 pieces Delivery: 45 days
#23

Incubator

Incubator

1 pieces Delivery: 45 days
#24

Food Texture analyzer

Food Texture analyzer

1 pieces Delivery: 45 days
#25

Tray dryer Cabinate Dryer

Tray dryer Cabinate Dryer

1 pieces Delivery: 45 days
#26

Muffle furnace

Muffle furnace

1 pieces Delivery: 45 days
#27

Blancher

Blancher

1 pieces Delivery: 45 days
#28

Bottle filling machine

Bottle filling machine

1 pieces Delivery: 45 days
#29

Bottle sterilizer

Bottle sterilizer

1 pieces Delivery: 45 days
#30

Bottle washing maching

Bottle washing maching

1 pieces Delivery: 45 days
#31

Cap sealing machines

Cap sealing machines

1 pieces Delivery: 45 days
#32

Gelometer

Gelometer

1 pieces Delivery: 45 days
#33

Kneader

Kneader

1 pieces Delivery: 45 days
#34

Microscope

Microscope

1 pieces Delivery: 45 days
#35

Bacteriological Lab incubator

Bacteriological Lab incubator

1 pieces Delivery: 45 days
#36

DC Shunt Motor

DC Shunt Motor cum separately excited motor with Electrical Load arrangement

1 pieces Delivery: 45 days
#37

3 ph Induction Motor slip ring

3 ph Induction Motor slip ring with slip power energy recovery arrangement

1 pieces Delivery: 45 days
#38

3 ph Induction Motor with Electrical load arrangement Motor

3 ph Induction Motor with Electrical load arrangement Motor

1 pieces Delivery: 45 days
#39

3 ph Synchronous Motor with Electrical load arrangement,

3 ph Synchronous Motor with Electrical load arrangement,

1 pieces Delivery: 45 days
#40

DC Series Motor with Mechanical Load arrangement

DC Series Motor with Mechanical Load arrangement

1 pieces Delivery: 45 days
#41

1 ph Induction Motor squirrel cage with mechanical load arrangement

1 ph Induction Motor squirrel cage with mechanical load arrangement

1 pieces Delivery: 45 days
#42

1 ph Synchronous Motor with mechanical load arrangement

1 ph Synchronous Motor with mechanical load arrangement

1 pieces Delivery: 45 days
#43

Digital Storage Oscilloscope

Digital Storage Oscilloscope

1 pieces Delivery: 45 days
#44

3 ph Transformers 5kVA, 0 500V, 50 Hz

3 ph Transformers 5kVA, 0 500V, 50 Hz

2 pieces Delivery: 45 days
#45

1 ph Transformers 2kVA, 0 300V, 50 Hz

1 ph Transformers 2kVA, 0 300V, 50 Hz

2 pieces Delivery: 45 days
#46

1 ph Transformers 2kVA, 230V 200V 86.6 tap and 115V, 50 Hz

1 ph Transformers 2kVA, 230V 200V 86.6 tap and 115V, 50 Hz

2 pieces Delivery: 45 days
#47

1 ph Transformers 2kVA, 230V 230V, 50 Hz

1 ph Transformers 2kVA, 230V 230V, 50 Hz

2 pieces Delivery: 45 days
#48

1 ph Transformers 2kVA, 230V 115V, 50 Hz

1 ph Transformers 2kVA, 230V 115V, 50 Hz

2 pieces Delivery: 45 days
#49

DC Ammeters, 0 10 20 microA

DC Ammeters, 0 10 20 microA

2 pieces Delivery: 45 days
#50

DC Ammeters, 0 50 100 microA

DC Ammeters, 0 50 100 microA

2 pieces Delivery: 45 days
#51

DC Ammeters, 0 150 300 microA

DC Ammeters, 0 150 300 microA

2 pieces Delivery: 45 days
#52

DC Ammeters, 0 250 500 microA

DC Ammeters, 0 250 500 microA

2 pieces Delivery: 45 days
#53

DC Ammeters, 0 10 20mA

DC Ammeters, 0 10 20mA

2 pieces Delivery: 45 days
#54

DC Ammeters, 0 150 300mA

DC Ammeters, 0 150 300mA

2 pieces Delivery: 45 days
#55

DC Ammeters, 0 500 1000mA

DC Ammeters, 0 500 1000mA

2 pieces Delivery: 45 days
#56

DC Ammeters, 0 1 2A

DC Ammeters, 0 1 2A

2 pieces Delivery: 45 days
#57

DC Ammeters, 0 2.5 5A

DC Ammeters, 0 2.5 5A

2 pieces Delivery: 45 days
#58

DC Ammeters, 0 5 10A

DC Ammeters, 0 5 10A

2 pieces Delivery: 45 days
#59

DC Ammeters, 0 10 20A

DC Ammeters, 0 10 20A

2 pieces Delivery: 45 days
#60

AC Ammeters,0 10mA

AC Ammeters,0 10mA

2 pieces Delivery: 45 days
#61

AC Ammeters,0 50mA

AC Ammeters,0 50mA

2 pieces Delivery: 45 days
#62

AC Ammeters,0 0.5 1A

AC Ammeters,0 0.5 1A

2 pieces Delivery: 45 days
#63

AC Ammeters,0 1 2A

AC Ammeters,0 1 2A

2 pieces Delivery: 45 days
#64

AC Ammeters,0 2.5 5A

AC Ammeters,0 2.5 5A

2 pieces Delivery: 45 days
#65

AC Ammeters, 0 5 10A

AC Ammeters, 0 5 10A

2 pieces Delivery: 45 days
#66

LPF UPF Wattmeter Single phase

LPF UPF Wattmeter Single phase

2 pieces Delivery: 45 days
#67

LPF UPF Wattmeter Three phase

LPF UPF Wattmeter Three phase

2 pieces Delivery: 45 days
#68

Different models of Robot joints.

Different models of Robot joints.

1 pieces Delivery: 45 days
#69

Trainer Kit of 2 DOF 3 DOF robot manipulator.

Trainer Kit of 2 DOF 3 DOF robot manipulator.

1 pieces Delivery: 45 days
#70

Robotic Drives.

Robotic Drives.

1 pieces Delivery: 45 days
#71

Trainer kit of forward kinematic of a robot.

Trainer kit of forward kinematic of a robot.

1 pieces Delivery: 45 days
#72

Trainer kit of Inverse Kinematic of a robot.

Trainer kit of Inverse Kinematic of a robot.

1 pieces Delivery: 45 days
#73

Dial gauges 3 gty.

Dial gauges 3 gty.

1 pieces Delivery: 45 days
#74

Izod Charpy Impart testing machine.

Izod Charpy Impart testing machine.

1 pieces Delivery: 45 days
#75

Deflection beam Setup for Simply Supported beam

Deflection beam Setup for Simply Supported beam

1 pieces Delivery: 45 days
#76

Strain measuremats on beam involve strair gauges rosettes. Setup

Strain measuremats on beam involve strair gauges rosettes. Setup

1 pieces Delivery: 45 days
#77

Model of Beam engine standard product

Model of Beam engine standard product

1 pieces Delivery: 45 days
#78

Model of Coupling rod of locomotive standard product

Model of Coupling rod of locomotive standard product

1 pieces Delivery: 45 days
#79

Model of Basic model of single slider crank chain mechanism standard product

Model of Basic model of single slider crank chain mechanism standard product

1 pieces Delivery: 45 days
#80

Model of pendulum pump standard product

Model of pendulum pump standard product

1 pieces Delivery: 45 days
#81

Model of oscillating cylinder engine standard product

Model of oscillating cylinder engine standard product

1 pieces Delivery: 45 days
#82

Model of Rotary interal combustion engine. standard product

Model of Rotary interal combustion engine. standard product

1 pieces Delivery: 45 days
#83

Model of crank and slotted lever quick return mechanism standard product

Model of crank and slotted lever quick return mechanism standard product

1 pieces Delivery: 45 days
#84

Model of Whitworth quick return mechanism standard product

Model of Whitworth quick return mechanism standard product

1 pieces Delivery: 45 days
#85

Model of Elliptical trammels. standard product

Model of Elliptical trammels. standard product

1 pieces Delivery: 45 days
#86

Model of Scotch yoke mechanism. standard product

Model of Scotch yoke mechanism. standard product

1 pieces Delivery: 45 days
#87

Model of Oldhaws coupling standard

Model of Oldhaws coupling standard

1 pieces Delivery: 45 days
#88

Model of Simple gear toil standard product

Model of Simple gear toil standard product

1 pieces Delivery: 45 days
#89

Model of Compound gear train standard product

Model of Compound gear train standard product

1 pieces Delivery: 45 days
#90

Model of Reverted gear train standard product

Model of Reverted gear train standard product

1 pieces Delivery: 45 days
#91

Model of Epicyclic gear train standard product

Model of Epicyclic gear train standard product

1 pieces Delivery: 45 days
#92

Models of Different cam and followers. standard product

Models of Different cam and followers. standard product

1 pieces Delivery: 45 days
#93

Model of Geneva mechanism standard product

Model of Geneva mechanism standard product

1 pieces Delivery: 45 days
#94

Model of Actermans seering mechanism standard product

Model of Actermans seering mechanism standard product

1 pieces Delivery: 45 days
#95

Models of Different types of gear.

Models of Different types of gear.

1 pieces Delivery: 45 days
#96

Brinell Hardness Test set up

Brinell Hardness Test set up

1 pieces Delivery: 45 days
#97

Rockwell Hardness Test set up

Rockwell Hardness Test set up

1 pieces Delivery: 45 days
#98

Erichsen cupping Test setup

Erichsen cupping Test setup

1 pieces Delivery: 45 days
#99

Spark Test setup

Spark Test setup

1 pieces Delivery: 45 days
#100

Optical metallurgical microscope

Optical metallurgical microscope

1 pieces Delivery: 45 days
#101

Non Destructive Tests dye penetrant test

Non Destructive Tests dye penetrant test

1 pieces Delivery: 45 days
#102

Non Destructive Tests magnetic particle inspection

Non Destructive Tests magnetic particle inspection

1 pieces Delivery: 45 days
#103

SC, BCC, FCC, HCP structure models.

SC, BCC, FCC, HCP structure models.

1 pieces Delivery: 45 days
#104

Heat treatment furnace.

Heat treatment furnace.

1 pieces Delivery: 45 days
#105

CRO

CRO

1 pieces Delivery: 45 days
#106

DSO

DSO

1 pieces Delivery: 45 days
#107

Dual Power Supply

Dual Power Supply

1 pieces Delivery: 45 days
#108

Trainer Kit of J K Flipflop and D flipflop

Trainer Kit of J K Flipflop and D flipflop

2 pieces Delivery: 45 days
#109

Trainer Kit of Inverting Amplifier, Non Inverting Amplifier and Voltage

Trainer Kit of Inverting Amplifier, Non Inverting Amplifier and Voltage

2 pieces Delivery: 45 days
#110

Analog and Digital trainer workbench with mounted bread boards

Analog and Digital trainer workbench with mounted bread boards

5 pieces Delivery: 45 days
#111

Laurents Half Shade polarimeter with source Range of Measurement

Laurents Half Shade polarimeter with source Range of Measurement

1 pieces Delivery: 45 days
#112

Newtons Ring apparatus with travelling microscope Set up

Newtons Ring apparatus with travelling microscope Set up

1 pieces Delivery: 45 days
#113

Sodium Vapour Lamp

Sodium Vapour Lamp

1 pieces Delivery: 45 days
#114

PN junction diode

PN junction diode

1 pieces Delivery: 45 days
#115

Energy bang gap kit

Energy bang gap kit

1 pieces Delivery: 45 days
#116

He Ne laserDetrmination

He Ne laserDetrmination

1 pieces Delivery: 45 days
#117

Fiber optics communication system kit

Fiber optics communication system kit

1 pieces Delivery: 45 days
#118

Redwood viscometer

Redwood viscometer

1 pieces Delivery: 45 days
#119

Digital Conductivity meter Digital

Digital Conductivity meter Digital

1 pieces Delivery: 45 days
#120

Language Lab Softaware

Language Lab Softaware

1 pieces Delivery: 45 days

Categories 144

AGITATORS ORGANIC CARBON ANALYZERS ELECTRICAL RETORT UNITS PCR AND RT PCR PRODUCTS LAB EQUIPMENTS LABORATORY ITEM THICKNESS MEASURING DEVICES AUTOCLAVE BLANCHING MACHINERY POWER PROJECT TRANSFORMERS POLYETHYLENE PIPE MOLECULAR BIOLOGY REAGENTS ANVIL RING BULK LIQUID FRACTURING EQUIPMENT PRECIOUS METAL SCRAP AUTOCLAVE EQUIPMENT PACKING TOOLS AIR CYLINDERS CEMENT TESTING EQUIPMENT PENETRANT MICRO METER MEASURING INSTRUMENT ELECTROMECHANICAL MACHINERY OPTICAL INSTRUMENTS WHEAT FLOUR ANALYZER MICROMETER MEASURING EQUIPMENT ENVIRONMENTAL METER CENTRAL PROCESSING UNIT HANDHELD OSCILLOSCOPE LABORATORY SIEVES AND SIFTING EQUIPMENT SILICON DIODE COUNTER FERROUS ALLOY SUPPLY WELDING BRAZING AND SOLDERING SERVICES TEXTURE ANALYZER SEALS COLONY COUNTER WATTMETERS CLASSROOM AWARDS SCRIPT WRITING ELECTRICAL MEASURING INSTRUMENT ARTICULATING LAZY ARMS LABORATORY TOOLS CENTRE TABLE SYNCHRONOUS MOTORS LABORATORY MIXERS LABORATORY ELECTROPHORESIS AND BLOTTING SYSTEM DRYING MACHINERY LABORATORY FURNACES ELECTRONIC COMMUNICATION MEASURING AND TESTING INSTRUMENT DENTAL EQUIPMENT AND SUPPLIES ELECTROMAGNETIC TESTING ENGINE POWER MAGNETIC STIRRERS ALUMINIUM ALLOY BOMB CALORIMETER PH INDICATOR SLIP RING SUPPLY TISSUE EMBEDDING STATIONS KITCHEN APPLIANCE BIOCHEMISTRY TECHNICIAN ATM VIBRATION TEST SYSTEM SWITCH GEAR EQUIPMENTS FOR LABORATORY OPTICAL FIBRE CABLE VIEWING AND OBSERVING INSTRUMENTS DIODE SYNCHRONOUS METAL HARDNESS TESTER TEXTURE ANALYSER DAIRY EQUIPMENT LABORATORY MIXING AND STIRRING EQUIPMENT METALLURGICAL MICROSCOPES RF PASSIVE COMPONENTS ELECTRON TUBE EQUIPMENT FOR LAB ALLOY AC MOTORS AUTOCLAVE AND STERILIZER EQUIPMENT DENTAL EQUIPMENT ELECTRICAL MEASURING AND TESTING EQUIPMENT ANIMAL LABORATORY EQUIPMENT BELL CONTROLLER OPERATION THEATRE EQUIPMENT OSCILLOSCOPES CONDUCTIVITY METERS MAGNETIC PARTICLE EXAMINATION EQUIPMENT SOUND GENERATING AND MEASURING EQUIPMENT ACID ANALYZERS CRYSTALLOGRAPHY EQUIPMENT POSITIONER GEAR HEAT MEASURING INSTRUMENTS EQUIPMENT FOR LABORATORY VEGETABLES FRUITS CUTTING MACHINERY BATTERY ACID HYDROMETERS BEAM FABRICATION AND CASTING ROBOTIC MAGNETIC CRACK DETECTOR TEST SIEVES CONDUCTIVITY INDICATOR TESTING MACHINE SUBSTATION TURBINE PUMPS DEHYDRATORS KOPARAPAK INDUCTION MOTORS MAGNETIC LABORATORY INSTRUMENT VIBRATION TABLE LABORATORY OVENS POLARIMETERS AC MOTOR AND DC MOTOR LABORATORY EQUIPMENT AND SUPPLIES MICROSCOPE MACHINE TOASTER EQUIPMENTS FOR LAB PH METERS WATER ANALYZERS STRUCTURE COAL TESTING INSTRUMENTS LIQUID PENETRANT EXAMINATION EQUIPMENT METAL FABRICATION WATER TESTING EQUIPMENT LAB INSTRUMENT BLENDING UNITS DYE PENETRANT ELECTRONIC SIGNAL FURNACE SUPPLY LENGTH THICKNESS AND DISTANCE MEASURING INSTRUMENTS AMMETERS METALLURGY SOIL TESTING KITS CALORIMETERS BEETLE BREEDING EQUIPMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement