TenderDekho Logo
Closed GEM

Block Development Office Split Air Conditioner Tender Wall Mount Type (V2) 2025

Bid Publish Date

22-Nov-2025, 5:17 pm

Bid End Date

15-Dec-2025, 6:00 pm

Generate Docs

Progress

Issue22-Nov-2025, 5:17 pm
Corrigendum12-Dec-2025
AwardPending

Tender Overview

Block Development Office invites bids for Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2). The tender references a scalable quantity with an option to add up to 25% more units at contracted rates and extends delivery time proportionally. Aims to procure both heating and cooling capable units that meet selected parameters. The BoQ shows no listed items, indicating a potential scope alignment across multiple AC units rather than a fixed quantity. The opportunity is anchored by an option clause that allows quantity variation during contract execution, with delivery extensions calculated as (Additional quantity / Original quantity) × Original delivery period, minimum 30 days. This procurement emphasizes flexible delivery and compliance with dual-function AC requirements. Unique terms center on adherence to heating and cooling performance per the specified parameters and a potential multi-unit deployment as per demand.

Technical Specifications & Requirements

  • Product category: Split Air Conditioner including Green AC, Wall Mount Type (V2) (Q2)
  • Functionality: Heating & Cooling capabilities must satisfy the chosen parameters; identical performance for both modes is required.
  • No BOQ items are listed, suggesting a framework-based scope rather than a fixed quantity.
  • The absence of explicit technical specs in the tender data implies suppliers must align to the buyer’s selected parameter set for both heating and cooling operations.
  • Emphasizes eco-friendly/green AC considerations as part of the procurement scope; ensure compatibility with energy-efficient operation.
  • The tender highlights a supplier capability to deliver under flexible quantity and scheduling constraints, with contract-rate stability for added units.

Terms & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25%; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days.
  • Delivery timelines depend on last date of original delivery order; extended period allocations apply if options are exercised.
  • All bidders must comply with the option-based delivery framework and the heating/cooling parameter requirements aligned to the selected specifications.
  • The ATC terms mandate both heating and cooling functions meet the specified parameters; ensure dual-mode performance for all units.
  • No explicit EMD, payment terms, or warranty details are provided in the data; bidders should seek clarification during bid submission.

Key Specifications

  • Product/service names: Split Air Conditioner, Wall Mount Type (V2) with Green/eco features

  • Quantities: Not specified in BOQ; contingent on option clause up to +25%

  • Estimated value: Not disclosed

  • Standards/Certifications: Not specified in data; require compliance with selected parameters

  • Delivery/Installation: Flexible scheduling under option clause; minimum 30 days extension rule

  • Performance: Dual-mode heating & cooling; must meet the purchaser’s parameter selections

  • OEM/Brand: Not specified; bid may require OEM authorization

  • Warranty/AMC: Not specified in tender data; bidders should confirm

  • Testing/Quality: Heating & cooling performance per parameters; eco/Green AC features preferred

Terms & Conditions

  • Option Clause enabling ±25% quantity variation at contracted rates

  • Delivery period adjustments proportional to quantity changes with minimum 30 days

  • Dual-function heating and cooling requirement for all units

  • No fixed BOQ; scope aligned to selected parameter set and framework approach

  • Clarifications required on EMD, payment terms, and warranty

Important Clauses

Payment Terms

Not specified in data; bidders should confirm at bid stage and seek standard government procurement terms

Delivery Schedule

Delivery begins from last date of original delivery order; extension rules apply per option clause with minimum 30 days

Penalties/Liquidated Damages

Not specified; bidders should verify penalties or LD clauses in official tender documents

Bidder Eligibility

  • Experience in supplying or deploying wall-mount split AC units with dual heating/cooling capability

  • Demonstrated capability to manage option-based quantity variations up to 25%

  • Compliance with energy efficiency or green certification requirements for eco-friendly ACs

  • Ability to provide OEM authorizations or authorized distribution for specified models

Authority & Contact

Tender Data

Bid Details

Quantity

2

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)

Authority Records

MINISTRY OF PANCHAYATI RAJBLOCK DEVELOPMENT OFFICE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8623816.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

2 Updates
#1

Update

12-Dec-2025

Extended Deadline

15-Dec-2025, 12:30 pm

Opening Date

15-Dec-2025, 1:00 pm

#2

Update

27-Nov-2025

Extended Deadline

12-Dec-2025, 12:30 pm

Opening Date

12-Dec-2025, 1:00 pm

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar split AC supply/heating-cooling units

4

Financial statements (latest/previous fiscal year)

5

EMD security deposit documentation (if required by purchaser)

6

Technical bid submission detailing compliance with heating & cooling specifications

7

OEM authorizations or authorized distributorship for wall mount split AC units

8

Any energy efficiency or green-certifications relevant to Eco/Green AC

9

Delivery/compliance schedule outlining response to option clause

10

Factory/ installation capability documentation (if required)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for the Block Development Office split AC tender 2025?

Bidders should prepare GST registration, PAN, experience certificates, financial statements, EMD documents, and a technical bid detailing dual heating/cooling specifications. Ensure OEM authorizations and energy-efficiency data accompany the bid; confirm the option clause allowing up to 25% quantity change at contracted rates.

What documents are required for the green AC wall mount bid 2025?

Submit GST certificate, PAN, experience certificates on similar projects, latest financials, EMD documentation, OEM authorization, and technical compliance evidence for heating and cooling performance. Include installation capability proof and energy efficiency certifications if available.

What are the dual heating cooling specifications for the AC units?

Units must support both heating and cooling functions per selected parameters; ensure performance parity between modes. Green/eco features are preferred; provide technical sheets showing heating capacity, cooling capacity, SEER, and energy rating for each model offered.

What is the delivery extension rule for quantity variances?

Delivery extensions apply when quantity increases up to 25% of original orders. Additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; delivery schedule starts on the last date of the original order.

Are there any warranty or AMC requirements for the AC procurement?

Warranty/AMC details are not specified in the data; bidders should seek clarification. Include standard post-warranty support terms and identify available AMC options at contract signing to avoid gaps after installation.

What certifications or standards are expected for green ACs?

While not specified, supply eco-friendly, energy-efficient models; provide energy certifications or green labels recognized in government procurements. Include SEER/CSEER ratings and any BIS/ISI compliance if applicable to the offered models.