TenderDekho Logo
Active GEM

Bids are Invited For 4 MP IP Bullet IP Camera with 30 Mtr IR Audio and Night Vision,4 MP IP VF Bullet Camera with 60 Mtr in Wokha, NAGALAND

Bid Publish Date

23-Sep-2026, 1:16 pm

Bid End Date

13-Oct-2026, 1:00 pm

EMD

₹50,953

Location

Wokha , NAGALAND

Progress

Issue23-Sep-2026, 1:16 pm
AwardPending

Public procurement opportunity for North Eastern Electric Power Corporation Limited 4 MP IP Bullet IP Camera with 30 Mtr IR Audio and Night Vision, 4 MP IP VF Bullet Camera with 60 Mtr IR Audio and Night Vision, 4 MP PTZ Camera with 200 Mtr IR, 32 Ch NVR, 8 Ch NVR, 8TB HDD, 8 Port PoE Switch, 24 Port PoE Switch with 2 SFP Port, LED Monitor 43 Inch 4k Industrial Grade for 24 x 7 Operation, Cat 6 cable 305 mtr, NVR Rack 6 U Loaded with Accessories and PDU, HDMI cable 5 Mtr, Camera BOX 5x5, Installation of Camera, 1 KVA LI UPS with 30 Mnt Backup, Laying of UTP Cable with Accessories, Installation of Rack and Switch, PVC Casing Capping with accessories, Installation and project commissioning including delivery in Wokha, NAGALAND. Quantity: 4357 issued by. Submission Deadline: 13-10-2026 13: 00: 00. View full details and respond.

Advertisement

Tender Data

Bid Details

Quantity

4357

Category

4 MP IP Bullet IP Camera with 30 Mtr IR Audio and Night Vision

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

76

OEM Avg. Turnover

34

Past Performance

80 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

4 MP IP Bullet IP Camera with 30 Mtr IR Audio and Night Vision , 4 MP IP VF Bullet Camera with 60 Mtr IR Audio and Night Vision , 4 MP PTZ Camera with 200 Mtr IR , 32 Ch NVR , 8 Ch NVR , 8TB HDD , 8 Port PoE Switch , 24 Port PoE Switch with 2 SFP Port , LED Monitor 43 Inch 4k Industrial Grade for 24 x 7 Operation , Cat 6 cable 305 mtr , NVR Rack 6 U Loaded with Accessories and PDU , HDMI cable 5 Mtr , Camera BOX 5x5 , Installation of Camera , 1 KVA LI UPS with 30 Mnt Backup , Laying of UTP Cable with Accessories , Installation of Rack and Switch , PVC Casing Capping with accessories , Installation and project commissioning including delivery

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

38

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Doyang Hydro Electric Plant

Delivery Pincodes

797100

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Soriful Hoque797100,Doyang Hydro Electric Plant, NagalandDoyang Hydro Electric Plant-7971002260-

Authority Records

MINISTRY OF POWERNORTH EASTERN ELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9927587.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

4 MP IP Bullet IP Camera with 30 Mtr IR Audio and Night Vision

4 MP IP Bullet IP Camera with 30 Mtr IR Audio and Night Vision

22 no Delivery: 60 days
#2

4 MP IP VF Bullet Camera with 60 Mtr IR Audio and Night Vision

4 MP IP VF Bullet Camera with 60 Mtr IR Audio and Night Vision

1 no Delivery: 60 days
#3

4 MP PTZ Camera with 200 Mtr IR

4 MP PTZ Camera with 200 Mtr IR

2 no Delivery: 60 days
#4

32 Ch NVR

32 Ch NVR

1 no Delivery: 60 days
#5

8 Ch NVR

8 Ch NVR

1 no Delivery: 60 days
#6

8TB HDD

8TB HDD

3 no Delivery: 60 days
#7

8 Port PoE Switch

8 Port PoE Switch

4 no Delivery: 60 days
#8

24 Port PoE Switch with 2 SFP Port

24 Port PoE Switch with 2 SFP Port

1 no Delivery: 60 days
#9

LED Monitor 43 Inch 4k Industrial Grade for 24 x 7 Operation

LED Monitor 43 Inch 4k Industrial Grade for 24 x 7 Operation

2 no Delivery: 60 days
#10

Cat 6 cable 305 mtr

Cat 6 cable 305 mtr

10 box Delivery: 60 days
#11

NVR Rack 6 U Loaded with Accessories and PDU

NVR Rack 6 U Loaded with Accessories and PDU

2 no Delivery: 60 days
#12

HDMI cable 5 Mtr

HDMI cable 5 Mtr

3 no Delivery: 60 days
#13

Camera BOX 5x5

Camera BOX 5x5

25 no Delivery: 60 days
#14

Installation of Camera

Installation of Camera

25 no Delivery: 60 days
#15

1 KVA LI UPS with 30 Mnt Backup

1 KVA LI UPS with 30 Mnt Backup

2 no Delivery: 60 days
#16

Laying of UTP Cable with Accessories

Laying of UTP Cable with Accessories

2,000 mtr Delivery: 60 days
#17

Installation of Rack and Switch

Installation of Rack and Switch

2 no Delivery: 60 days
#18

PVC Casing Capping with accessories

PVC Casing Capping with accessories

2,250 mtr Delivery: 60 days
#19

Installation and project commissioning including delivery

Installation and project commissioning including delivery

1 lot Delivery: 60 days

Categories 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer